Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
6715 BKMDGK015 Berkad ICRC July 10, 2014 Mudug Galkacyo Laaso Cadale Laaso Cadale 6.6003 47.4276 270.0 No Yes 215 1300 4.0 the people in this village are postoralist who are severely affacted by the drought and recurrent conflicts in Mudug region. There is scarcity of water in the village. The village have no any other source of water apart from the two private berkets and Water Sources Data from Partners – WSD_Pat
6732 BKMDHO014 Berkad ICRC Aug. 15, 2014 Mudug Hobyo Jilable Jilable 6.4793 47.7602 208.0 No Yes 430 200 400 1800 4.0 Construction of rounded shape BRK (12m daimeter and 4 m Depth) is recommended. Water Sources Data from Partners – WSD_Pat
7365 Borehole FGS Ministry of Energy and Water Resources April 18, 2022 Bay qansax_dheere Sheed kus 6.0 Agency not specified Sheed kus 2.761155 42.88688 rural yes Yes 0.25 4.0 gi 3.0 12.0 Concrete/Masonry tank PVC 2.0 yes 12 3.0 Surface mounted Pump Generator good no Communal yes 5 0 yes 3 yes Rehabilitation
6723 BKMDHO005 Berkad ICRC June 15, 2013 Mudug Hobyo Subagle Subagle 6.1933 47.771 180.0 34 180 5 390 4.0 Construction of rounded shape BRK (12m daimeter and 4m Depth) is recommended. Water Sources Data from Partners – WSD_Pat
8441 Borehole FGS Ministry of Energy and Water Resources April 18, 2022 Bay qansax_dheere Buulo nomdul 7.0 Agency not specified Buulo Gomar 2.796844 43.002658 rural yes Yes 4.0 gi 4.0 12.0 Steel tank 3.0 PVC yes 10 7.0 Submersible Pump good no Communal yes 5 0 no Full rehabilitation
6704 BKMDGK004 Berkad GSA/SWALIM April 1, 2018 Mudug Galkacyo Tawakal Private 07-01-05 Farahgeedi BR 6.695 47.5251 262.0 13 No Yes 300 4.0 1.0 12.0 26.2 7.8 638.0 324.0 MUHOBBH30 Private 17-06-05 Rehabilitate Strategic Water Sources Survey in Galmudug, Hiran, Middle and Lower Shabelle – WSS_GMHS
6582 BKGLCB025 Berkad GSA/SWALIM April 1, 2018 Galgaduud Cabudwaaq Bowdadhgorre Private 06/22/1905 Qarsooni BR 6.008 46.4861 312.0 15 No Yes 400 4.0 3.0 32.2 7.92 510.0 250.0 Private 19-06-05 Protection 2005-07-10 Improve Strategic Water Sources Survey in Galmudug, Hiran, Middle and Lower Shabelle – WSS_GMHS
6721 BKMDHO003 Berkad ICRC June 17, 2013 Mudug Hobyo Toore Toore 6.0245 47.7898 147.0 34 180 5 390 3.8 Construction of rounded shape BRK (10m daimeter and 4m Depth) is recommended. Water Sources Data from Partners – WSD_Pat
6700 BKMDGD001 Berkad GSA/SWALIM April 1, 2018 Mudug Galdogob Buulaley Private 06/29/1905 Saxqurun BR 6.832 47.1623 341.0 70 No Yes 78 40 600 3.5 3.0 11.0 26.6 8.56 206.0 103.0 MUGLKBR1 Private 04-07-05 Rehabilitate Strategic Water Sources Survey in Galmudug, Hiran, Middle and Lower Shabelle – WSS_GMHS
6731 BKMDHO013 Berkad ICRC June 16, 2013 Mudug Hobyo Higlaale Higlaale 6.415 48.3091 125.0 34 210 30 360 3.5 Construction of rounded shape BRK (10m daimeter and 4m Depth) is recommended. Water Sources Data from Partners – WSD_Pat

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors