Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7195 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 28, 2022 | Nugaal | garowe | Xamur | 0.5 | UNICEF | 28/03/2018 | Xamur BH | — | 8.7266831 | 48.7464455 | 346.0 | — | 1 | — | urban rural | yes | — | No | Before 5 month, problem of pump and cables | 700 | 1200 | — | 2700 | — | — | 306.0 | pvc | 8.0 | — | 6.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 80.0 | PVC | 700.0 | — | 3 | 2 | no | — | — | Submersible Pump | Lowara | 7.5 | 246.0 | Hybrid - Solar/Generator | Parkins | 30.0 | GPS-300-380 | 12.92 | good | — | no | — | — | — | — | — | — | Communal | yes | 28/03/2018 | 4 | 0 | yes | 0.05 | yes | — | — | — | NRC | 28/02/2021 | 1. Construction of new elevated tank 2. Installation of solar power 4. Extension of pipelines | 1. Emergency 2. Borehole problem not known | — | — |
7133 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 31, 2022 | Sool | las_caanood | Saaxdheer | 0.5 | NPA | 31/03/2014 | Seexdheer BH | — | 8.0068294 | 47.1040015 | 608.0 | — | 1 | — | urban rural | yes | — | Yes | — | 17500 | 5000 | 300 | 15000 | 0.0 | — | 370.0 | pvc | 8.0 | — | 12.0 | 12.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 76.0 | PVC | 1200.0 | 25 | 5 | 5 | yes | 40 | 8.0 | Submersible Pump | Lowara | 15.0 | 330.0 | Hybrid - Solar/Generator | Parkins | 45.0 | BR-M300W | 21.0 | good | — | yes | Colorless and odorless | 31.6 | 7.76 | 1912.0 | 1281.0 | — | Communal | yes | 31/03/2018 | 3 | 0 | yes | 0.05 | yes | — | — | — | CARE Somalia | 30/12/2021 | 1. Construction of new elevated tank 2. Rehabilitation of pump and riser pipes 3. Construction of 2 koisks 4. Installation of new generator | 1. Extra generator. | — | — |
7345 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Tuur dibi | — | Community | 08/03/2020 | Tuur dibi BH | — | 7.0233423 | 46.9627436 | 346.0 | — | 1 | — | rural | yes | — | Yes | — | 1750 | 2500 | — | 3000 | 0.0 | — | 226.0 | pvc | 8.0 | — | 33.0 | 19.0 | — | 0.2 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 30.0 | Galvanised Steel | 50.0 | 250 | 2 | 2 | yes | 18 | 8.0 | Submersible Pump | — | 15.0 | 172.0 | Hybrid - Solar/Generator | Parkins | 30.0 | BYD400MIK_36 | 22.4 | good | — | yes | Colorless and odorless | 31.8 | 7.51 | 1810.0 | 898.0 | — | Communal | yes | 08/03/2020 | 3 | 1 | yes | 0.05 | yes | — | — | — | GPLZ and PWDA | 08/01/2022 | 1. Construction of new elevated tank ( GPLG). 2. installation of solar power and construction new koisks and animal thoughts ( PWDA). | plumbing tools | — | — |
7521 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Goldogob | — | WDA | 08/03/1943 | Ceel ciilde BH goldogob | — | 7.031098 | 47.020472 | 346.0 | — | 11 | — | urban rural | yes | — | Yes | — | 2100 | — | — | — | — | — | 200.0 | gi | 8.0 | — | 3.7 | 13.0 | — | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 64.0 | Galvanised Steel | 4000.0 | 300 | 2 | 2 | yes | 9 | 8.0 | Submersible Pump | Grand foss | 11.0 | 124.0 | Generator | Parkins | 45.0 | — | — | poor | Needs full rehabilitation | yes | Colorless and odorless | 32.5 | 7.42 | 2556.0 | 1261.0 | — | Utility/Local Authority | — | — | — | — | yes | 0.05 | yes | — | — | — | CARE Somalia | 08/02/2021 | 1. Construction of new elevated tank tank | 1. New driling borehole 2. Installation of solar power. 4. Rehabilitation of koisks and animal thoughts 5. Construction of caretaker and Generator rooms | — | — |
8308 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 12, 2022 | Mudug | galkayo | Hadoodil | — | — | 21/03/2004 | Hadoodil BH | — | 7.2353236 | 47.4007961 | 335.0 | — | 1 | — | rural urban | yes | — | No | 1 month, pump problem | 2100 | 2000 | — | 8000 | 0.0 | — | 210.0 | pvc | 8.0 | — | 32.0 | 9.0 | — | 0.4 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 76.0 | PVC | 5000.0 | 150 | 2 | 3 | no | — | — | Submersible Pump | — | 7.5 | 180.0 | Generator | Parkins | 45.0 | — | — | poor | Absolutely poor | no | — | — | — | — | — | — | Communal | yes | 21/03/2007 | 3 | 2 | — | — | — | — | — | — | NRC | 12/03/2021 | 1. Construction of new elevated tank. | 1. Installation of pump. 2. Installation of solar power. 3. Rehabilitation of animal troughts. 4. Construction of new kiosks. 5. Trucking pipe | — | — |
7249 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 14, 2022 | Mudug | galkayo | Margaaga | — | ISRC | 14/03/2009 | Margaaga BH | — | 7.2191715 | 47.5372463 | 344.0 | — | 1 | — | urban rural | yes | — | Yes | — | 7448 | 50 | — | 2000 | — | — | 194.0 | pvc | 8.0 | 80.0 | 8.0 | 12.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 31.0 | PVC | 3000.0 | 200 | 8 | 1 | no | — | — | Submersible Pump | Lowara | 7.5 | 162.0 | Hybrid - Solar/Generator | Parkins | 30.0 | BR-M300W | 15.0 | good | — | yes | Colorless and odorless | 33.5 | 7.35 | 3405.0 | 1698.0 | — | Communal | yes | 14/03/2012 | 3 | 4 | yes | 0.05 | yes | — | — | — | NRC | 14/02/2021 | 1. Construction of new elevated tank. | 1. Installation of pump 2. Construction animal troughts 3. Fancing 4. Fuel supporting | — | — |
7985 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 12, 2022 | Mudug | goldogob | Tuulo-xanan | 1.5 | Charity | 12/03/2020 | Tuulo xanan BH | — | 7.4177271 | 47.2246497 | 395.0 | — | 1 | — | rural urban | yes | — | Yes | — | 1400 | — | — | — | — | — | 220.0 | pvc | 8.0 | 92.0 | 7.5 | 10.0 | — | 4.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 30.0 | PVC | 1700.0 | 1 | 3 | 2 | no | — | — | Submersible Pump | — | 11.0 | 195.0 | Generator | Parkins | 45.0 | — | — | good | — | yes | Colorless and odorless | 32.2 | 8.0 | 1870.0 | 928.0 | — | Communal | yes | 12/03/2021 | 5 | 0 | no | — | no | — | — | — | NRC | 12/03/2021 | 1. Construction of new elevated tank. | 1. Fuel supporting. 3. Installation of solar power. 4. Fancing. | — | — |
7178 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 7, 2022 | Mudug | galkayo | Barwaaqo | — | Community | 07/03/2019 | Barwaaqo BH | — | 6.9693155 | 47.272905 | 301.0 | — | 1 | — | rural urban | yes | — | Yes | — | 1050 | 600 | — | 1200 | 0.0 | — | 201.0 | pvc | 8.0 | — | 17.3 | 10.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 26.0 | PVC | 200.0 | 35 | 2 | 2 | yes | 4 | 8.0 | Submersible Pump | — | 11.0 | 151.0 | Generator | Parkins | 30.0 | — | — | poor | Absolutely needs full rehabilitation | yes | — | 29.7 | 7.5 | 3100.0 | 1565.0 | — | Communal | yes | 07/03/2019 | 5 | 2 | yes | 0.05 | yes | — | — | — | CARE Somalia | 07/01/2021 | 1. Construction of new elevated tank. 2. Construction of koisks and animal thoughts. | 1. Emergency for Installation of solar power 2.. Construction of koisks 3. Fancing borehole 4. Pump spare. 5. Operator supporting. | — | — |
7187 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 9, 2022 | Mudug | goldogob | Dhamuuke | — | Community | 09/03/2019 | Dhamuuke BH | — | 7.2394967 | 47.1243666 | 384.0 | — | 2 | — | rural urban | yes | — | Yes | — | 420 | 130 | — | 250 | — | — | 180.0 | pvc | 8.0 | — | 10.7 | 6.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 32.0 | PVC | 1200.0 | 30 | 1 | 1 | yes | 1 | 8.0 | Submersible Pump | Lowara | 11.0 | 120.0 | Hybrid - Solar/Generator | Parkins | 30.0 | JCNS-M36V360W | 20.16 | good | — | yes | Colorless and odorless | 33.5 | 7.68 | 2220.0 | 1103.0 | — | Communal | no | — | — | — | yes | 0.05 | yes | — | — | — | NRC | 09/05/2020 | 1. Construction of operator | 1. Construction of animal throughts 2. Installation of generator 3. Rehabilitation of generator | — | — |
7190 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 12, 2022 | Mudug | goldogob | Kuwait | — | Kuwait charity | 12/03/2014 | Kuwait BH | — | 7.3939088 | 47.2250603 | 395.0 | — | 1 | — | rural urban | yes | — | Yes | — | 4200 | 1000 | — | 2000 | — | — | 155.0 | pvc | 8.0 | — | 16.7 | 18.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 64.0 | PVC | 2000.0 | 100 | 3 | 2 | yes | 20 | 8.0 | Submersible Pump | Lowara | 11.0 | 142.0 | Hybrid - Solar/Generator | Parkins | 45.0 | DS7230M | 17.34 | fair | — | yes | Colorless and odorless | 31.5 | 8.04 | 1838.0 | 912.5 | — | Communal | yes | 12/03/2014 | 5 | 0 | yes | 0.05 | yes | — | — | — | NRC | 12/03/2021 | 1. Construction of operator room. | 1. Rehabilitation of pump and riser pipes and cables. 2. Fuel supporting. 3. Rehabilitation of animal troughts. 4. Rehabilitation and construction of koisks. | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France