Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
8272 Dam Somaliland MoWRD April 18, 2022 Woqooyi Galbeed hargeisa Salaxley Dam 1.0 Somaliland MoWRD 15/05/2020 Salaxley Dam 9.0097768 44.2099198 1211.0 0 rural urban no 8 No 7 months becouse the work is going on and no more rain fall. 30000 4000 150 10000 0.0 3.0 150.0 100.0 25.0 4300 0 0 no No supply the water source dried. no 0.0 Communal no no no The work is still continue
8582 Borehole Puntland Ministry of Energy Minerals and Water April 1, 2022 Togdheer buuhoodle Buuhoodle 2.0 UNICEF 01/04/2006 Farah Bulley BH 1 8.2199418 46.3559417 630.0 2 urban rural yes No 7 was not functioning, collapsed casing 0.0 370.0 gi 8.0 Concrete/Masonry tank 92.0 PVC 500.0 no no Communal yes 01/04/2004 3 2 no no 1. Drilling new borehole. 2. Construction of elevated water tank.
8248 Borehole Somaliland MoWRD April 27, 2022 Woqooyi Galbeed gebiley Carro yanbo 0.6 Cago Wayne Cago Wayne borehole 2 9.6577827 43.7986936 1377.0 0 yes No 8 months before becouse it collapse 0 0 0 0 0.0 130.0 gi 8.0 70.0 0.0 0.0 0.0 0.0 Concrete/Masonry tank 20.0 0 0 0 no Submersible Pump Grundfos 0.0 104.0 no 0.0 Private/Individual no no
8419 Dam Somaliland MoWRD April 17, 2022 Woqooyi Galbeed hargeisa Bali matan 0.3 Community Bali matan Dam 9.1216215 44.4588316 -1.0 0 rural urban no 10 No 8 months before becouse of low rain fall or luck of enough rain fall. 3500 200 0 3000 0.0 1.0 70.0 80.0 Concrete/Masonry tank 25.0 Galvanised Steel 200.0 500 5 3 no Submersible Pump Unkown Solar Solar world 1.5 poor This dam is all ready dried before 8 months becouse of low rainfall. no Communal no no no No intervention required
8243 Borehole Somaliland MoWRD April 21, 2022 Woqooyi Galbeed gebiley Geed Abeera 3.0 Concern Worldwide Somalia 21/04/2012 Geed Abeera borehole 9.6074731 43.7539388 1667.0 0 rural urban yes No 8 years before becouse of the riser pipe and pump failure. 5600 3000 15000 5000 0.0 211.0 gi 8.0 178.0 10.0 0.0 0.0 0.0 Concrete/Masonry tank 30.0 PVC 3000.0 800 0 0 no Submersible Pump Grundfos 10.0 185.0 Generator Jubuilan bros 45.0 poor No water supply at all becouse the the borehole is non function. no 0.0 Communal no no no Full development
7548 Dug Well FGS Ministry of Energy and Water Resources March 16, 2022 Middle Shabelle balcad Garas Bintow 2.8 Private 10/04/2007 Farjano 2.2169254 45.397737 132.0 rural yes No 9 months ago, because of it collapsed about 20m from ground level. 1865 6.0 Concrete/Masonry tank 50.0 Galvanised Steel 80.0 110 no Submersible Pump Lowara 5.5kw 109.0 Generator Duos 30.0 poor It's in a bad condition no Private/Individual yes 0.05 no No intervention Deepening and full rehabilitation
8460 Dug Well Puntland Ministry of Energy Minerals and Water March 28, 2022 Nugaal garowe Cuun Cuun dugwell 2 8.8162779 48.8932247 465.0 2 urban yes No A months , for power problems 750 9.0 7.0 3 no No Pump poor This dugwell and its water supply needs full rehabilitation no Communal yes 15/04/2007 3 2 no no 1. Rehabilitation of pipes 2. Rehabilitation of koisks 3. Replacement of pump. 4.
8397 Borehole Puntland Ministry of Energy Minerals and Water March 7, 2022 Mudug goldogob Godgaashaan 07/03/2019 Godgaashaan BH 6.978967 47.2497849 320.0 1 rural urban yes No A months ago, borehole needs observation of the problem stopped. 1500 1200 1200 0.0 130.0 pvc 8.0 Concrete/Masonry tank 36.0 Other 150 2 yes Submersible Pump 11.0 Generator Parkins 30.0 poor Needs rehabilitation of supplies no Communal no no NRC 07/03/2021 1. Construction of new elevated tank 1. Emergency 2. Observation of borehole 3. Construction of koisks 4. Construction of generator room and caretaker room
8737 Borehole Puntland Ministry of Energy Minerals and Water March 7, 2022 Mudug goldogob Xerojaalle 0.5 Xerojaalle 6.987134 47.1766608 320.0 1 rural urban no 8 No A months, borehole problems 2500 0.0 pvc 8.0 yes Communal no NRC 07/03/2020 Construction of elevated water 1. Emergency 2. Observation of borehole
7941 Borehole Puntland Ministry of Energy Minerals and Water March 14, 2022 Mudug galkayo Bacaadweyn 0.3 Bacaadweyn water company 14/03/2019 Bacaadweyn water company BH 2 7.1840294 47.5360031 344.0 2 urban yes No A years, Because of lack of water supply. 210.0 pvc 8.0 22.0 2.4 no Submersible Pump 22.0 180.0 poor There is no any water supply no 30.2 7.6 2261.0 1133.0 Utility/Local Authority no no 1. Emergency 2. Construction of new elevated tank 3. Installation of generator and solar power 4. Extension of pipelines. 5. Construction of caretaker and Generator rooms.

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors