Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7172 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 1, 2022 | Mudug | jariban | Jariiban | 0.0 | WDA | 01/03/1986 | Seemade BH 1 | — | 7.1558815 | 48.6113718 | 186.0 | — | 2 | — | rural urban | yes | — | Yes | — | 3500 | 5000 | 0 | 10000 | 0.0 | — | 200.0 | pvc | 8.0 | — | 14.0 | 12.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 28.0 | Galvanised Steel | 250.0 | — | 1 | 2 | yes | 5 | 8.0 | Submersible Pump | — | 15.0 | 180.0 | Hybrid - Solar/Generator | Parkins | 32.0 | 340Wp | 15.0 | fair | The koisks of this water supply needs rehabilitation | yes | Colorless and odorless | 31.5 | 7.26 | 5460.0 | 2670.0 | — | Communal | yes | 01/03/1990 | 3 | 1 | yes | 0.05 | yes | — | — | — | Agency not specified | 01/02/2017 | Construction of elevated water tank | 1. Construction of new elevated tank. 2. Construction of new kiosks. 3. Rehabilitation and reconstruction of animal thoughts. 4. Construction of new generator room 5. Extension and rehabilitation of pipelines. | — | — |
7087 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 27, 2022 | Bari | qardho | Rako raaxo | 4.0 | Other | 04/11/2018 | Rako raaxo borehole 2 | — | 9.7517126 | 49.7252112 | 639.0 | — | 2 | — | rural urban | yes | — | Yes | — | 12000 | 3500 | 60 | 7000 | — | — | 450.0 | pvc | 8.0 | 360.0 | 12.0 | 20.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 32.0 | Galvanised Steel | 700.0 | — | — | 2 | yes | 8 | 9.0 | Submersible Pump | Grundforce | — | 360.0 | Hybrid - Solar/Generator | Perkins | 60.0 | S/M- 250W | 36.0 | good | — | no | — | 33.3 | 6.4 | 3300.0 | 1609.0 | — | Communal | yes | 19/09/1998 | 2 | 3 | yes | 0.026 | yes | — | — | — | — | — | — | Replacement of main raising pipe and submersible pump. Generator room Construction elevated water tank for animals. Water supply system for the town. | — | — |
7249 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 14, 2022 | Mudug | galkayo | Margaaga | — | ISRC | 14/03/2009 | Margaaga BH | — | 7.2191715 | 47.5372463 | 344.0 | — | 1 | — | urban rural | yes | — | Yes | — | 7448 | 50 | — | 2000 | — | — | 194.0 | pvc | 8.0 | 80.0 | 8.0 | 12.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 31.0 | PVC | 3000.0 | 200 | 8 | 1 | no | — | — | Submersible Pump | Lowara | 7.5 | 162.0 | Hybrid - Solar/Generator | Parkins | 30.0 | BR-M300W | 15.0 | good | — | yes | Colorless and odorless | 33.5 | 7.35 | 3405.0 | 1698.0 | — | Communal | yes | 14/03/2012 | 3 | 4 | yes | 0.05 | yes | — | — | — | NRC | 14/02/2021 | 1. Construction of new elevated tank. | 1. Installation of pump 2. Construction animal troughts 3. Fancing 4. Fuel supporting | — | — |
7329 | — | Borehole | Somaliland MoWRD | April 13, 2022 | Woqooyi Galbeed | hargeisa | Jaleelo | 2.0 | Individual dug well | 09/12/2005 | Hasan yusuf dug well | — | 9.792234 | 44.2793493 | 966.0 | — | 10 | — | urban rural | yes | — | Yes | — | 15000 | 0 | 0 | 0 | 5.0 | — | 12.0 | other | 0.0 | 9.0 | 1.5 | 2.0 | 6.0 | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Other | 20.0 | Other | 200.0 | 200 | 0 | 0 | yes | 6 | 9.0 | No Pump | — | — | — | — | — | — | — | — | poor | Supply condition is moderate but it is poor sanitation. | no | — | 32.0 | 6.8 | 495.0 | 350.0 | — | Private/Individual | — | — | — | — | yes | 0.03 | yes | — | — | — | — | — | — | To Protect their sanitaion | — | — |
7760 | — | Borehole | Galmudug Ministry of Energy and Water Resources | March 28, 2022 | Galgaduud | cabudwaaq | ubax | 5.0 | ceelcade 2 | 27/03/2012 | ceelcade2 | — | 6.249695 | 46.2417367 | 368.0 | — | 1 | — | urban rural | yes | — | Yes | — | 5000 | 400 | 100 | 25000 | — | — | 134.0 | pvc | 6.0 | — | — | 20.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 45.0 | Galvanised Steel | 59.0 | 480 | 2 | 2 | yes | 12 | 9.0 | Submersible Pump | Granfos | — | 120.0 | Generator | perkin | 30.0 | — | — | fair | 1. small strorage capacity 2. pipes are leaching | no | — | 32.0 | 7.09 | 2300.0 | 1261.0 | — | Communal | — | — | — | — | yes | 0.0015 | yes | — | — | — | — | — | — | — | — | — |
7141 | — | Borehole | FGS Ministry of Energy and Water Resources | April 30, 2022 | Lower Juba | badhaadhe | Hosingow | 1.5 | Former gorverment | 01/06/1975 | Fceel biyo macaan | — | -0.171151 | 41.2702469 | 53.0 | — | 2 | — | urban rural | yes | — | Yes | — | — | 6000 | 16000 | 15000 | 2.0 | — | 90.0 | gi | 6.0 | 25.0 | — | 15.0 | 45.0 | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 360.0 | PVC | 2000.0 | 2000 | 2 | 6 | yes | — | — | Submersible Pump | — | — | 25.0 | Generator | Douse | 240.0 | — | — | fair | Midle livel | no | — | — | — | — | — | — | Communal | yes | 30-Apr-00 | 4 | 3 | no | — | yes | — | — | — | Wasda | 28-Jan-22 | Solar/ piping tap | Extra injin changing of the pump water ciosk | — | — |
7250 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 12, 2022 | Mudug | galkayo | Roox | — | Community | 12/03/2016 | Roox BH | — | 7.2052439 | 47.4384682 | 341.0 | — | 2 | — | rural urban | yes | — | Yes | — | 4200 | 1500 | — | 2500 | — | — | 180.0 | pvc | 8.0 | — | 13.3 | 15.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 20.0 | Galvanised Steel | 1300.0 | 30 | 6 | 2 | yes | 2 | 8.0 | Submersible Pump | Lowara | 11.0 | 150.0 | Hybrid - Solar/Generator | Doss | 30.0 | — | 19.6 | fair | — | yes | Colorless and odorless | 34.5 | 7.61 | 2350.0 | 1171.0 | — | Communal | yes | 12/03/2016 | 5 | 2 | yes | 0.05 | yes | — | — | — | NRC | 12/03/2020 | 1. Installation of solar power. 2. Rehabilitation of pump. | 1. Construction of new elevated tank and rehabilitation of generator. 2. Extension pump capacity. 3. Extension pipelines 4. Room caretaker room. | — | — |
7010 | — | Dug Well | FGS Ministry of Energy and Water Resources | March 19, 2022 | Gedo | luuq | Balanbale | 20.0 | NCA | 19/03/2022 | Balanbale well | — | 3.7832153 | 42.5591095 | 146.0 | — | 1 | — | urban | yes | — | Yes | — | 2000 | — | — | — | — | — | — | — | — | — | — | — | — | — | 11.0 | 4.0 | 1.0 | 24.0 | 1.0 | 4.0 | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 25.0 | PVC | 100.0 | 408 | 0 | 0 | yes | 20 | 10.0 | Surface mounted Pump | Do not know | — | — | Generator | 115 | 1000.0 | — | — | fair | It has pipeline system connected all villages around | yes | Almost good | — | — | — | — | — | Private/Individual | — | — | — | — | yes | 1 | yes | — | — | — | NRC | 19-Mar-22 | Wash | Water system rehabilitation | — | — |
7038 | — | Borehole | FGS Ministry of Energy and Water Resources | March 15, 2022 | Hiraan | beled_weyne | Lamagalaay | 0.5 | Community | 09/03/1995 | Lama galaay water supply | — | 4.7338116 | 45.2026696 | 172.0 | — | 20 | — | urban | yes | — | Yes | — | 7000 | — | — | — | — | — | 170.0 | pvc | 10.0 | 90.0 | 30.0 | 5.0 | 15.0 | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 30.0 | PVC | 500.0 | 1000 | 2 | 0 | no | — | — | Submersible Pump | Lowara Submersible pump | 8.0 | 90.0 | Generator | Eveka generator | 30.0 | — | — | good | Rehabilitation, solar | no | — | — | — | — | — | — | Private/Individual | — | — | — | — | yes | 2 | yes | — | — | — | Community | 15-Mar-22 | None | Rehabilitation and solar system | — | — |
7210 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 9, 2022 | Bari | qardho | Kala dhac | 7.0 | IR | 26/05/2019 | Kaladhac borehole | — | 10.0486823 | 48.9363469 | 966.0 | — | 1 | — | rural urban | yes | — | Yes | — | 6000 | 500 | — | 10000 | — | — | 350.0 | pvc | 8.0 | 212.0 | 11.0 | 13.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 40.0 | Galvanised Steel | 270.0 | — | 1 | 3 | yes | 8 | 9.0 | Submersible Pump | Lowara | — | 318.0 | Hybrid - Solar/Generator | Perkins | 60.0 | SZYL-M330-36 | 24.75 | fair | — | no | — | 27.7 | 7.28 | 4350.0 | 2150.0 | — | Communal | no | — | — | — | no | — | yes | — | — | — | Puntland MoEMW | 09/05/2021 | Replacement of main raising pipes and submersible pump. | 1: Generator. 2: Replacement of 5 solar panels. 3: Replacement of main raising pipes and submersible pump. 4: Replacement of rusted distribution pipe lines. | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France