Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7213 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 28, 2022 | Bari | qardho | Dhudhub | 0.5 | Minstry of water and energy federal Republic of somalia | 28/02/2014 | Dhudhub borehole | — | 9.2356349 | 49.9205093 | 438.0 | — | 1 | — | rural urban | yes | — | Yes | — | 12000 | 4000 | — | 7000 | — | — | 410.0 | pvc | 8.0 | 140.0 | 10.0 | 15.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 60.0 | Galvanised Steel | 4200.0 | — | 5 | 2 | yes | 5 | 9.0 | Submersible Pump | Lawara | — | 204.0 | Hybrid - Solar/Generator | Perkins | 50.0 | 300-72M | 29.4 | fair | The water demand of the dhudhub is very high. No sufficient water kiosks in the village | no | — | 38.5 | 7.2 | 3830.0 | 1910.0 | — | Communal | yes | 28/06/2015 | 5 | 2 | no | — | yes | — | — | — | Puntland MoEMW | 15/09/2021 | Replacement of main raising pipes. | 1: Water supply system which gives water to village. 2: Replacement of all distribution pipe lines. 3: Fencing. 4: Rehabilitation of elevated water tank in order to stop water leaking. | — | — |
7164 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 23, 2022 | Bari | qardho | Aada | 2.5 | NRC | 23/06/2018 | Aada 2 | — | 9.489328 | 49.063492 | 725.0 | — | 9 | — | rural urban | yes | — | Yes | — | 1200 | 400 | — | 3500 | 0.25 | — | 26.0 | pvc | 8.0 | — | 6.0 | 18.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 150 | 1 | 2 | yes | 4 | 6.0 | Submersible Pump | Lowara | — | 235.0 | Hybrid - Solar/Generator | — | — | — | — | fair | The yield is low. This borehole and another two boreholes shares one storage tank. | no | — | 30.5 | 6.8 | 1830.0 | 920.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.013 | yes | — | — | — | DRC - Puntland | 27/03/2020 | Replacement of main raising pipes and submersible pump. | 1: Replacement of rusted iron distribution pipes. 2: Replacement of main raising pipes. | — | — |
7033 | — | Spring | FGS Ministry of Energy and Water Resources | March 25, 2022 | Bakool | ceel_barde | Maroodille | 5.0 | Action Afrika Hilfe e.V | 30/01/2020 | Marodiile sring well | — | 4.8275176 | 43.652891 | 458.0 | — | 1 | — | rural urban | yes | — | Yes | — | 100 | 25 | 50 | 100 | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 32.0 | — | — | — | — | Concrete/Masonry tank | 2.0 | Galvanised Steel | 32.0 | 50 | 3 | 3 | no | — | — | Submersible Pump | — | — | — | Electricity Grid | — | — | — | — | good | The system was less adequet to the condition | yes | The colour is good | — | — | — | — | — | Private/Individual | — | — | — | — | yes | 0.6 | yes | — | — | — | Action Afrika Hilfe e.V | — | — | — | — | — |
7080 | — | Borehole | Somaliland MoWRD | April 20, 2022 | Woqooyi Galbeed | hargeisa | Wada makaahiil village | 0.3 | UNICEF | 17/08/2015 | Wada makaahiil borehole | — | 9.3606035 | 43.6109003 | 1414.0 | — | 0 | — | rural urban | yes | — | Yes | — | 300 | 1000 | 4000 | 2000 | 0.0 | — | 263.0 | gi | 8.0 | 234.0 | 8.0 | 6.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 12.6 | Galvanised Steel | 200.0 | 2100 | 1 | 3 | no | — | — | Submersible Pump | Grundfos | 3.0 | 243.0 | Generator | Perkins | 30.0 | — | — | poor | The supply system is poor becouse of the borehole yield | no | — | 30.2 | 7.0 | 2700.0 | 1920.0 | — | Communal | no | — | — | — | yes | 0.12 | yes | — | — | — | — | — | — | Borehole replacement, fencing, solar instalation, rehabilitation of animal troughs. | — | — |
7208 | — | Spring | Puntland Ministry of Energy Minerals and Water | April 9, 2022 | Bari | bossaso | Laag | 0.33 | Italiano agency | 12/06/2000 | Laag spring | — | 11.0384527 | 49.1842985 | 202.0 | — | 3 | — | rural urban | yes | — | Yes | — | 1800 | 200 | — | 2000 | 5.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 12.0 | — | — | — | — | Concrete/Masonry tank | 12.0 | Galvanised Steel | — | 20 | 7 | — | yes | 4 | 10.0 | Submersible Pump | Lowara | — | 2.0 | Hybrid - Solar/Generator | Perkins | 9.0 | — | 1.5 | fair | No animal troughs. Water kiosks are not enough to the village. | no | — | 32.1 | 7.4 | 948.0 | 474.0 | — | Communal | yes | 09/06/2020 | 4 | 3 | yes | 0.006 | yes | — | — | — | CARE Somalia | 10/09/2020 | Installation of solar power system. Construction of elevated water tank. | 1: Increasing of solar panels. 2: Replacement of rusted iron distribution pipes 3: Extra pipes as a safety. | — | — |
7032 | — | Spring | FGS Ministry of Energy and Water Resources | March 25, 2022 | Bakool | ceel_barde | Hallane | 2.0 | ACF | 25/03/2020 | Hasan wali shallow well | — | 4.8278787 | 43.65379 | 459.0 | — | 1 | — | rural urban | yes | — | Yes | — | 35 | 25 | 35 | 250 | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 1.0 | — | — | — | — | Concrete/Masonry tank | 3.0 | Galvanised Steel | 35.0 | 50 | 3 | 3 | no | — | — | Hand Pump | Hand pumb | — | — | — | — | — | — | — | good | Â To ensure that adequate water-level data are being collected for present and anticipated future uses, observation-well networks and water-level monitoring | yes | Testy good | — | — | — | — | — | Communal | yes | 25-Mar-21 | 3 | 2 | yes | 0.6 | yes | — | — | — | ARDO | 25-Mar-21 | Simple intervation | — | — | — |
7620 | — | Dug Well | Puntland Ministry of Energy Minerals and Water | April 5, 2022 | Bari | bossaso | Madaxtooyo | 5.0 | GUMCO | 12/09/2019 | Madaxtooyo dugwell 2 | — | 11.2800083 | 49.2059333 | -2.0 | — | 14 | — | urban | yes | — | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 27.0 | 23.0 | 38.0 | 21.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | — | PVC | — | — | — | — | — | — | — | Submersible Pump | Lowara | — | 26.0 | Generator | Perkins | 165.0 | — | — | good | — | no | — | 32.2 | 7.3 | 2370.0 | 1200.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.026 | yes | — | — | — | GUMCO | 05/01/2022 | Replacement of main rasing pipes and submersible pump | 1: Extention of pipe line 2: Construction of storage water tank 3: Solar power system | — | — |
7290 | — | Borehole | Somaliland MoWRD | April 4, 2022 | Sool | taleex | Sarmaanyo | 1.0 | ICRC | 04/04/2015 | Sarmaanyo borehole 2 | — | 9.4810306 | 48.002289 | 893.0 | — | 2 | — | rural urban | yes | — | Yes | — | 36000 | 20000 | 30 | 15000 | 0.0 | — | 306.0 | pvc | 8.0 | 24.0 | 12.0 | 24.0 | 1.0 | 1.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 120.0 | Galvanised Steel | 570.0 | 6000 | 1 | 2 | yes | 20 | 8.0 | Submersible Pump | Laura | 15.0 | 248.0 | Generator | Perkins 50-3 | 50.0 | — | — | good | The pipes are old and need to replace. They are leaking and Water supply are reducing to yield more water. This SOS situation and the system may devastating if not immediately intervention is not executed. | no | — | 39.0 | 7.3 | 800.0 | 1800.0 | — | Communal | yes | 04/04/2015 | 4 | 3 | yes | 0.1 | yes | — | — | — | Somaliland MoWRD | 04/04/2018 | They delivered the only Generator we are using currently | Solar installation is needed to minimise the cost of fuel, the pipes are old and leaking this reduces amount of water produced by the Borehole. | — | — |
7235 | — | Borehole | Somaliland MoWRD | April 22, 2022 | Woqooyi Galbeed | gebiley | Jameecada | 0.1 | Ina Boore | 19/06/2005 | Jameecada borehole 2 | — | 9.6794404 | 43.6460327 | 1441.0 | — | 0 | — | rural | yes | — | Yes | — | 2000 | 0 | 1000 | 1500 | 0.0 | — | 150.0 | gi | 8.0 | 56.0 | 4.0 | 3.0 | 14.0 | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 25.0 | Galvanised Steel | 100.0 | 285 | 1 | 3 | no | — | — | Submersible Pump | Grundfos | 4.0 | 143.0 | Generator | Linz | 50.0 | — | — | good | The condition of supply system is all most fair. | no | — | 30.1 | 7.5 | 2120.0 | 1500.0 | — | Communal | no | — | — | — | yes | 0.06 | yes | — | — | — | — | 19/04/2017 | Tank, animal troughs, machine.kiosk, rehabilitation of caretaker room | Solar instalation, fittings. | — | — |
7137 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 24, 2022 | Bari | qardho | Garihel | 0.5 | Puntland MoEMW | 24/01/2020 | Gerihel borehole | — | 9.2728326 | 49.41626 | 561.0 | — | 1 | — | rural urban | yes | — | Yes | — | 30000 | 4000 | 200 | 45000 | 0.05 | — | 300.0 | pvc | 8.0 | 200.0 | 13.0 | 12.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 24.0 | PVC | 1000.0 | 500 | 4 | 2 | yes | 3 | 9.0 | Submersible Pump | Lawara | — | — | Hybrid - Solar/Generator | Perkins | 65.0 | BYD400MIK-36 | 28.0 | good | — | no | — | 27.4 | 6.6 | 1400.0 | 700.0 | — | Communal | yes | 24/01/2021 | 4 | 2 | yes | 0.001 | yes | — | — | — | Puntland MoEMW | 24/01/2021 | Replacement of main raising pipes | Replacement of distribution pipe line Extra solar panels Construction of caretaker room Fencing Construction of another animal troughs and kiosks. | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France