Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
8111 Borehole Somaliland MoWRD April 7, 2022 Sool las_caanood Higlo 1.5 Private 07/04/2015 Geel caseeye 8.5646566 47.6841849 539.0 2 rural yes Yes 0 40 0 0 3.0 65.0 pvc 8.0 40.0 10.0 8.0 0.0 0.0 Concrete/Masonry tank 48.0 Galvanised Steel 100.0 0 0 0 yes 2 8.0 Submersible Pump Luwara 13.0 30.0 Solar Szyl-p300- 36 300.0 good Two solar panels damaged and need to be changed no 32.0 6.8 1150.0 810.0 Communal no no no Oxfam GB 07/04/2019 Constructed water tank of capacity 48 qubic meter Supply system disconnected due to pipes damage and Water cannot go to water tanks. 2 solar panels also not working
8110 Borehole Somaliland MoWRD April 22, 2022 Woqooyi Galbeed gebiley Botor 0.1 Dp world 22/04/2022 Botor 9.69366 43.5150559 1523.0 0 rural urban yes Yes 1000 0 40 100 0.0 140.0 gi 8.0 89.0 60.0 3.0 0.0 0.0 145 0 0 yes 6 30.0 Submersible Pump Grundfos 30.0 115.0 Generator Perkins 65.0 The condition of supply system in this water source is fair becouse the construction of the road between wajale and kalabaydh depends on. no 28.0 7.2 1154.0 790.0 Communal no no no No intervention required
8109 Borehole Somaliland MoWRD April 29, 2022 Woqooyi Galbeed hargeisa Darusalam 3.5 Dahabshiil 28/06/2011 Dahabshiil 9.7945388 44.0526197 1034.0 0 rural yes Yes 800 60 100 1500 20.0 150.0 gi 8.0 80.0 25.0 18.0 0.0 0.0 Concrete/Masonry tank 300.0 Galvanised Steel 150.0 115 0 0 yes 30 10.0 Submersible Pump Grundfos 30.0 110.0 Hybrid - Solar/Generator Perkins 110.0 Topsun 18.9 fair no 29.0 7.5 1158.0 822.0 Private/Individual no no Dahabshiil is responsible for the intervention of this water source.
76 BHAWBO065 Borehole Somaliland_MoWRD Nov. 30, 2019 Awdal Borama Cadey galiile 0.0 03-08-14 Cadey galiil 9.9363 43.25367 1427.0 3.2 0 1575099927174.jpg Rural Yes Yes 300 0 300 104.0 GI 8.0 80.0 5.0 6.0 0.0 Concrete/Masonry tank 30.0 Galvanised Steel 20.0 0 1 2 No Submersible Pump Grundfos 11.0 102.0 Generator Perkins 30.0 Good No 17.0 8.64 1050.0 736.0 Communal No No Installation solar Rehabilitation animal troughs and water points Increasing number of animal troughs and water points Strategic Water Sources Survey – WSS_NATl
7956 Borehole Somaliland MoWRD April 25, 2022 Sanaag ceerigaabo Ceerigabo 2.0 Islamic Relief 25/04/2014 Booda cade Borehole 9.8757922 47.6747617 1052.0 0 rural urban yes Yes 763 945 530 7940 0.0 260.0 gi 8.0 15.0 12.0 0.0 0.0 Concrete/Masonry tank 35.0 Galvanised Steel 1.0 0 3 3 yes 10 10.0 Submersible Pump Luwara 11 35.0 211.0 Generator Parkin 45.0 good Well functional water supply system no 30.0 7.6 2100.0 1600.0 Communal no no no 0 1. Rehabilatation of solar system. 2.Pump rehabilatation - 15 KVA
7955 Borehole Somaliland MoWRD April 1, 2022 Sool caynabo Samane borehole 5.0 Private 01/04/2016 Jaleelo 8.9319542 46.314135 781.0 1 rural yes Yes 1300 200 600 7000 10.0 125.0 gi 6.0 42.0 40.0 12.0 0.0 0.0 Concrete/Masonry tank 34.0 Galvanised Steel 100.0 200 1 1 yes 7 45.0 Submersible Pump Lawara 34.0 96.0 Hybrid - Solar/Generator Perkins 60.0 Photovoltiac 50.0 good The system has no problem and its working very well no 28.6 7.1 2100.0 180.0 Private/Individual no no Private 01/03/2022 Filter changed The system that purifies salt water not functioning due filtering problem
7953 Borehole Somaliland MoWRD April 5, 2022 Woqooyi Galbeed berbera Geel lookor 0.2 Berbera Local Government 01/03/2020 Geel lookor borehole 10.1363076 45.1823224 584.0 1 rural urban yes Yes 3500 300 0 7000 0.0 80.0 gi 6.0 14.0 12.0 8.0 0.0 0.0 Concrete/Masonry tank 24.0 Galvanised Steel 500.0 20 0 0 no Submersible Pump Grundfos 7.5 63.0 Solar DUSOL 8.58 poor Geel loo kor water supply system is good and water transformed saline and require to drill and replacement borehole and transmision main pipe are degraded and require to be replace into pvc and geophysical survey for new borehole, generator and caretaker room require, animal troughs no 28.5 7.83 2130.0 1490.0 Communal no no no No intervention carried out. Geel loo kor water is good and water transformed saline and require to drill and replacement borehole and transmision main pipe are degraded and require to be replace into pvc and geophysical survey for new borehole, generator and caretaker room require, animal troughs
8049 Borehole Somaliland MoWRD May 4, 2022 Sanaag ceel_afweyn Ceel afweyn 0.5 Former Somalia government- china 19/08/1985 Caday musbaax 9.9100643908605 47.2531728353351 1038.0 0 rural yes Yes 300 5000 50 15000 0.0 300.0 gi 8.0 100.0 15.0 5.0 0.0 0.0 Concrete/Masonry tank 5.0 Galvanised Steel 5000.0 1500 5 1 no Submersible Pump Laure 8.0 120.0 Hybrid - Solar/Generator P40P3 32.0 Lorentz 15.0 good The system is functioning at the present time however there is alot of interventions needed which mentioned as the following no 30.0 7.4 1400.0 1000.0 Communal no no no Oxfam Novib 23/12/2021 Borehole rehabilitation 15Kw solar system installation, provision of Borehole fencing, Replacement of Raiser Mains. This borehole needs animal troughs, elevated water tanks, pipeline extension, Kiosk rehabilitation,and Generator instruments. Filters.

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors