Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
340 BHBRQR008 Borehole Puntland_PSAWEN Jan. 17, 2014 Bari Qardho Hingood GTZ - German Agency for Technical Assistance 01-06-80 Biyo Cade BH2 9.49645 49.07512 740.0 Urban Yes Yes 1000 1000 5000 270.0 145.0 12.0 14.0 17.0 2.0 15.0 200.0 Submersible Pump Lowara 15kW 180.0 7.0 3100.0 2080.0 Public-Private 0.1 0.3 DRC - Danish Refugee Council Generator 2012-09-01 Pump and guardroom Strategic Boreholes Survey – BHS
7437 Borehole Somaliland MoWRD May 11, 2022 Togdheer burco Kabadheere area 1.0 AFREC 05/02/2018 Abdi awil Borehole 9.4842394022271 45.432399334386 1052.0 1 rural yes Yes 1000 100 0 300 80.0 180.0 gi 8.0 145.0 14.0 3.0 Concrete/Masonry tank 25.0 Galvanised Steel 150.0 200 3 3 no Submersible Pump Laware 14.0 135.0 Generator Perkins 55.0 good Good no 29.0 7.4 1200.0 774.0 Private/Individual yes 0.1 no 1.animal troughs 2. Solar pannel installation 3. Water reservior
7923 Borehole Somaliland MoWRD May 9, 2022 Togdheer burco Octoober Village 1.0 Koos 29/10/2009 Ceelka Koos 9.49578392319381 45.553367882967 999.0 1 rural urban yes Yes 0 0 10 10 80.0 180.0 pvc 8.0 145.0 25.0 5.0 10.0 2.0 Concrete/Masonry tank 45.0 Galvanised Steel 100.0 20 3 2 no Submersible Pump Grundfos 24.0 135.0 Generator Perkins 30.0 good Good Condition no 30.0 8.1 2400.0 1000.0 Private/Individual no no Solar installation Pump change
7442 Borehole Somaliland MoWRD May 11, 2022 Togdheer burco Kabadheere 0.3 Former Somali government 23/11/1983 Kabadheere Borehole 1 9.47277421597391 45.4413872491568 1022.0 1 rural yes Yes 1000 4000 0 5000 120.0 180.0 pvc 8.0 145.0 14.0 5.0 Concrete/Masonry tank 40.0 Galvanised Steel 150.0 2000 4 5 yes 10 8.0 Submersible Pump Grundfos 15.0 145.0 Hybrid - Solar/Generator Perkins 55.0 Lorentz 15.0 good Good Condition no 27.0 7.8 700.0 900.0 Utility/Local Authority yes 0.1 no ISRA 06/12/2017 Rehabilitation of kabadheere Borehole Construction of fence Rehabilitation of animal throughs Rehabilitation of Kiosks
8313 Borehole Somaliland MoWRD May 11, 2022 Togdheer burco Aadan saleebaan District 1.0 Jamaal 11/05/2022 October 9.46918081026524 45.5606333166361 1003.0 1 rural yes Yes 100 0 15 30 80.0 160.0 pvc 8.0 145.0 24.0 4.0 no Submersible Pump Grundfos 18.0 140.0 Generator Perkins 45.0 good Good Condition no Private/Individual no no
7933 Borehole Somaliland MoWRD May 11, 2022 Togdheer burco Kabadheere area 0.5 Al Caam 13/12/2019 Ceelka Maxsharka Al caam 9.47909446433187 45.4596473090351 1037.0 2 rural yes Yes 30 0 150 0 120.0 160.0 gi 8.0 145.0 15.0 4.0 Concrete/Masonry tank 45.0 Galvanised Steel 900.0 0 3 5 no Submersible Pump Laware 14.0 154.0 good Good Condition no 33.0 8.1 2320.0 1100.0 Private/Individual no no
7216 Borehole Puntland Ministry of Energy Minerals and Water April 9, 2022 Sanaag laasqoray Cawsane 8.0 IR 01/01/2017 Cawsane borehole 10.6342557 48.7897314 772.0 1 rural urban yes Yes 3000 2000 7000 205.0 pvc 8.0 145.0 10.0 17.0 Concrete/Masonry tank 50.0 Stainless Steel 8000.0 7 3 3 yes 12 9.0 Submersible Pump Luwara 153.0 Hybrid - Solar/Generator Perkins 40.0 BR-M250W 17.0 fair no 32.1 7.6 2150.0 1077.0 Communal yes 01/01/2018 3 2 no yes NRC 01/02/2022 Replacement of main raising pipes and the cable 1: Pipelines are leaking. 2: Generator room's Roof Rehabilitation. 3: Construction of store room. 4: They need some kind of intervention about the Increased fuel prices. 5: Amergency construction of another borehole due to water demand. 6: Solar power storage( battery)
8078 Borehole Somaliland MoWRD May 11, 2022 Togdheer burco Area plaza 1.0 Former Somali government 06/01/1986 Aadan Gollis Borehole 9.51007075142115 45.5648255255073 1010.0 1 rural urban yes Yes 10000 0 0 0 50.0 160.0 pvc 8.0 145.0 15.0 5.0 Galvanised Steel 0 0 0 no Submersible Pump Laware 15.0 119.0 Generator Perkins 45.0 good Good Condition no 23.0 7.5 1300.0 760.0 Private/Individual no no Elevated water tank Solar installation New generator
8114 Borehole Somaliland MoWRD May 10, 2022 Togdheer burco Kabadheere Area 3.0 This is privately owned Borehole and was established by Chief caqil Ali Ibrahim (Naafto) 09/02/2014 Ceelka Cali Naafto 9.50154254212976 45.4492610413581 1053.0 1 rural yes Yes 10 0 0 0 120.0 165.0 pvc 8.0 145.0 25.0 8.0 Concrete/Masonry tank 150.0 0 0 0 yes 5 8.0 Submersible Pump Laware 25.0 135.0 Hybrid - Solar/Generator Perkins 55.0 Lorentz 15.0 good Good Condition no 32.0 7.6 1150.0 800.0 Private/Individual no no New pump Rehabilitation of solar system Rising pipes change Construction and rehabilitation of animal throughs.
7535 Borehole Puntland Ministry of Energy Minerals and Water March 8, 2022 Mudug goldogob Goldogob 08/02/2015 Goldogob water company BH 4 7.0312549 47.0079111 362.0 11 urban yes Yes 225.0 pvc 8.0 145.0 18.0 15.0 2.0 Concrete/Masonry tank 100.0 PVC 6250.0 1200 no Submersible Pump Lowara 15.0 126.0 Generator Parkins 40.0 fair yes Colorless and odorless 30.3 7.58 1580.0 791.0 Private-Public-Partnership yes 0.05 yes 1. Installation of solar power 2. Fancing 3. Installation of new generator

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors