Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7546 | — | Borehole | FGS Ministry of Energy and Water Resources | March 15, 2022 | Middle Shabelle | balcad | Caliyalle | 1.0 | SAACID | 15/03/1996 | Caliyalle BH | — | 2.1793298 | 45.399509 | 122.0 | — | — | — | rural | yes | — | Yes | — | 2550 | 0 | 0 | 0 | 0.0 | — | 150.0 | gi | 8.0 | 115.0 | — | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 25.0 | Galvanised Steel | 100.0 | 170 | 5 | 0 | no | — | — | Submersible Pump | Mechanical pump | — | 115.0 | Generator | LISTER-PETTER | 30.0 | — | — | fair | It's in a good condition | no | — | — | — | — | — | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | no | — | — | — | — | — | No intervention since the establishment date | Supply of Generator and construction of elevated water tank and pipeline extension. | — | — |
7535 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Goldogob | — | — | 08/02/2015 | Goldogob water company BH 4 | — | 7.0312549 | 47.0079111 | 362.0 | — | 11 | — | urban | yes | — | Yes | — | — | — | — | — | — | — | 225.0 | pvc | 8.0 | 145.0 | 18.0 | 15.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 100.0 | PVC | 6250.0 | 1200 | — | — | no | — | — | Submersible Pump | Lowara | 15.0 | 126.0 | Generator | Parkins | 40.0 | — | — | fair | — | yes | Colorless and odorless | 30.3 | 7.58 | 1580.0 | 791.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | yes | — | — | — | — | — | — | 1. Installation of solar power 2. Fancing 3. Installation of new generator | — | — |
7486 | — | Dug Well | Somaliland MoWRD | April 26, 2022 | Woqooyi Galbeed | hargeisa | Burco yar | 1.0 | Ismail Dugwell | 25/03/2022 | Ismail Ali Dug well | — | 9.6502062 | 44.2571853 | 1091.0 | — | 0 | — | urban | yes | — | Yes | — | 5500 | — | — | — | — | — | — | — | — | — | — | — | — | — | 30.0 | 20.0 | 5.0 | 17.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | Other | 20.0 | — | — | 785 | 0 | 0 | yes | 16 | 10.0 | Submersible Pump | Unkown | 4.0 | 28.0 | Electricity Grid | — | — | — | — | — | Good condition of supply system | no | — | 29.0 | 7.3 | 560.0 | 298.0 | — | Private/Individual | — | — | — | — | yes | 0.06 | no | — | — | — | — | — | — | — | — | — |
7534 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Goldogob | — | Galdogob Water Company | 13/03/2017 | Goldogob water company BH 5 | — | 7.0437981 | 47.0129558 | 352.0 | — | 11 | — | urban | yes | — | Yes | — | 42000 | — | — | — | — | — | 235.0 | pvc | 8.0 | 140.0 | 18.0 | 15.0 | — | 1.3 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 240.0 | PVC | 2786.0 | 7000 | — | — | — | — | — | Submersible Pump | Grandfoss | 15.0 | 126.0 | Hybrid - Solar/Generator | IVECO | 45.0 | — | — | good | — | yes | Colorless and odorless | 30.5 | 7.6 | 1650.0 | 818.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | — | — | — | — | — | — | — | 1. Fancing of borehole 2. Rehabilitation of generator. | — | — |
7070 | — | Berkad | FGS Ministry of Energy and Water Resources | March 25, 2022 | Bay | qansax_dheere | BUULO GOMOR | 10.0 | Village community | 25/03/1989 | WAR ATOOW | — | 2.8565043 | 43.0018021 | 386.0 | — | 3 | — | rural | no | 6 | No | The water was stopped 7 years ago, cause of lack of rain and drought | 2000 | 3000 | 400 | 200 | 4.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 18.0 | 9.0 | — | — | — | — | — | Other | 40.0 | Other | 0.0 | 800 | 0 | 1800 | no | — | — | No Pump | — | — | — | — | — | — | — | — | poor | Supply system is very poor because of the berked has no pipeline fancing kiosk and etc | yes | Normal | 22.0 | — | — | — | — | Private/Individual | — | — | — | — | yes | 0.25 | yes | — | — | — | Agency not specified | 26-Mar-20 | Digging of berked | Needs Rehabilitation diggin,pipeline, generator, kiosk etc | — | — |
7533 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Goldogob | — | UNICEF | 08/03/2017 | Goldogob BH 3 | — | 7.0409077 | 47.0329871 | 345.0 | — | 11 | — | urban | yes | — | Yes | — | 42000 | — | — | — | — | — | 218.0 | pvc | 8.0 | — | 12.0 | 15.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 240.0 | PVC | 9532.0 | 1590 | — | — | no | — | — | Submersible Pump | Frankilin | 11.0 | 192.0 | Generator | Parkins | 110.0 | — | — | good | — | yes | Colorless and odorless | 30.5 | 7.6 | 1650.0 | 818.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | no | — | — | — | — | — | — | 1. Installation of solar power 3. Full rehabilitation 3. Fancing of borehole and supplies. | — | — |
7276 | — | Spring | Puntland Ministry of Energy Minerals and Water | March 1, 2022 | Bari | bandar_beyla | Falfalax | 1.0 | Natural spring. | — | Falfax spring | — | 8.7729069 | 50.3993004 | 19.0 | — | 1 | — | rural urban | yes | — | No | 2018, hayaan cyclone | 1200 | 150 | — | 2000 | 0.5 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 9.0 | — | — | — | — | Concrete/Masonry tank | 22.0 | Stainless Steel | 1500.0 | — | 2 | 2 | yes | 5 | 8.0 | Submersible Pump | Lawara | — | — | Generator | Chinese generator | 37.0 | — | — | poor | The supply system is broken and also the pipes has a rest, and the spring's catchment is totally being destroyed by the cyclone. | no | — | 31.0 | 7.3 | 2400.0 | 1300.0 | — | Communal | yes | 01/02/2012 | 2 | 1 | yes | 0.05 | yes | — | — | — | Muslim Aid | 01/03/2016 | They made 2kiosks, 2 animal troughs and the elevated water tank. | 1: Solar power installation 2: Provision of pump 3: Placement of of all distribution pipes. 4: Rehabilitation of kiosks 5: Rehabilation of elevated water tank in order to stop water leaking. 6: Rehabilitation of animal troughs. | — | — |
7071 | — | Berkad | FGS Ministry of Energy and Water Resources | March 25, 2022 | Bay | qansax_dheere | Tiirki | 7.0 | Village community | 25/03/1973 | WAR IBRAAN | — | 2.8726554 | 42.9834311 | 378.0 | — | 3 | — | rural | no | 3 | No | Before 7 months because of lack of rain | 500 | 1000 | 700 | 800 | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 4.0 | — | 20.0 | — | — | — | — | — | Other | 3.0 | Other | 0.0 | 250 | 0 | 400 | no | — | — | No Pump | — | — | — | — | — | — | — | — | poor | Poor | yes | 0 | 22.0 | — | — | — | — | Private/Individual | — | — | — | — | yes | 0.25 | yes | — | — | — | ADRA | 26-Mar-19 | Rehabilitation and digging of berked | Rehabilitation and digging, plastic tank pipelines and generator | — | — |
7987 | — | Borehole | Galmudug Ministry of Energy and Water Resources | March 19, 2022 | Galgaduud | dhusa_marreb | Ceel faratol | 1.0 | — | — | Faratol | — | 5.515453 | 46.3639738 | 222.0 | — | 0 | — | urban | yes | — | Yes | — | 3501 | — | — | — | — | — | 126.0 | pvc | 6.0 | 43.0 | 40.0 | 12.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 45.0 | Galvanised Steel | 65.0 | 650 | 1 | 1 | yes | 10 | 10.0 | Submersible Pump | — | — | — | Hybrid - Solar/Generator | Doutz | 31.0 | JAM72S09 | 16.0 | fair | — | no | — | 28.8 | 6.84 | 1852.0 | 923.0 | — | Private/Individual | — | — | — | — | yes | — | yes | — | — | — | — | — | — | — | — | — |
7072 | — | Berkad | FGS Ministry of Energy and Water Resources | March 25, 2022 | Bay | qansax_dheere | MOOKUWOW | 10.0 | Former Somali Government | 25/03/1985 | WAR GADUUDI | — | 2.8802641 | 43.0030254 | 379.0 | — | 3 | — | rural | no | 6 | No | The water was stopped before months because sailer of rain season | 1000 | 1500 | 500 | 600 | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 3.0 | 20.0 | 15.0 | — | — | — | — | — | Other | 2.0 | Other | 0.0 | 300 | 0 | 500 | no | — | — | No Pump | — | — | — | — | — | — | — | — | poor | There is no good supply system | yes | 0 | 0.0 | — | — | — | — | Private/Individual | — | — | — | — | yes | 0.25 | yes | — | — | — | Agency not specified | 26-Mar-18 | Digging | Needs digging and fancing | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France