Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7940 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 15, 2022 | Mudug | galkayo | Xarfo | — | WDA | 15/03/1986 | Xarfo BH 2 | — | 7.3467858 | 47.6165108 | 373.0 | — | 4 | — | urban | yes | — | Yes | — | 6300 | — | — | — | — | — | 193.0 | pvc | 8.0 | — | 4.0 | 5.0 | — | 5.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 16.0 | PVC | 2500.0 | 900 | 0 | 0 | yes | 5 | 8.0 | Submersible Pump | — | 7.5 | 170.0 | Generator | Parkins | 30.0 | — | — | poor | Poor water supply | yes | Colorless and odorless | 32.5 | 7.68 | 2295.0 | 1145.0 | — | Utility/Local Authority | — | — | — | — | no | — | no | — | — | — | — | — | — | 1. Drilling new borehole. 2. Full rehabilitation of water supply. 3. Installation of solar power. | — | — |
7927 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 4, 2022 | Sanaag | laasqoray | Ceelaayo | 5.0 | Red Crescent Society for United Arab Emirates | 01/05/2013 | Ceelaayo borehole | — | 11.2238021 | 48.9195977 | -10.0 | — | 1 | — | rural urban | yes | — | Yes | — | 1500 | 600 | — | 2000 | 1.0 | — | 40.0 | gi | 10.0 | 20.0 | 10.0 | 4.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 40.0 | Galvanised Steel | 5200.0 | — | 4 | 2 | no | — | — | Submersible Pump | Lowara | — | 33.0 | Hybrid - Solar/Generator | Perkins | 40.0 | — | 13.5 | poor | Pipelines is in a bad condition | no | — | 35.3 | 8.4 | 2360.0 | 1488.0 | — | Communal | yes | 01/01/2020 | 4 | 2 | no | — | no | — | — | — | CARE Somalia | 01/05/2020 | Construction of kiosks Rehabilitation of water tank Submersible pump and a Generator | 1.Replacement of supply system into a PVC 2.Another elevated water tank, because the current water tank can't supply fully 3.wire Fencing of the solar system and the Generator room. 4. Five kiosks. 5.Rehabilitation of the Solar panels 6. Another water tank for the Agricultural use, N.B because the care taker of the borehole and the fuel of the Generator, gets an income from the Agriculture keeps running the system. | — | — |
7932 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 12, 2022 | Mudug | goldogob | Ramaas | — | PWASEN | 12/03/2018 | Ramaas BH | — | 7.2135578 | 47.3402197 | 353.0 | — | 1 | — | rural urban | yes | — | Yes | — | 910 | 2000 | — | 9000 | 0.0 | — | 220.0 | pvc | 8.0 | — | 12.0 | 5.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 30.0 | Stainless Steel | 1200.0 | 35 | 4 | 2 | no | — | — | Submersible Pump | Lowara | 15.0 | 180.0 | Generator | Parkins | 45.0 | — | — | fair | — | yes | Colorless and odorless | 29.8 | 7.51 | 2335.0 | 1157.0 | — | Communal | yes | 12/03/2018 | 2 | 2 | no | — | no | — | — | — | — | — | — | 1. Rehabilitation of pump and riser pipes 2. Installation of solar power 3. Rehabilitation of koisks 4. Construction of new elevated tank. | — | — |
7943 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 13, 2022 | Mudug | galkayo | Cagaaran | — | Save the children | 13/02/2021 | Cagaraan BH | — | 7.0347377 | 47.4901695 | 284.0 | — | 2 | — | urban rural | yes | — | Yes | — | 700 | — | — | — | — | — | 180.0 | pvc | 8.0 | 95.0 | 25.0 | 12.0 | — | 1.4 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | PVC | 2500.0 | — | 4 | 2 | yes | 7 | 8.0 | Submersible Pump | — | 11.0 | 160.0 | Hybrid - Solar/Generator | Parkins | 45.0 | PV800-4T30G | 30.0 | good | — | yes | Colorless and odorless | 35.2 | 8.05 | 2235.0 | 1115.0 | — | Communal | yes | 13/03/2021 | 3 | — | no | — | no | — | — | — | Save the children | 13/01/2021 | 1 . Installation of solar power | Fuel supporting. Rehabilitation pipelines | — | — |
7968 | — | Spring | Puntland Ministry of Energy Minerals and Water | April 10, 2022 | Sanaag | laasqoray | Baran | 0.7 | Natural well | — | Baran well | — | 10.7085372 | 48.3352056 | 1026.0 | — | 2 | — | rural urban | yes | — | Yes | — | 24000 | 2000 | — | 4000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | yes | 20 | 9.0 | — | — | — | — | — | — | — | — | — | fair | No water kiosks. No distribution pipe lines. No storage tank. During the drought seasons the water of the well become very low and has no water trucking. | no | — | 32.2 | 7.5 | 2000.0 | 1004.0 | — | — | — | — | — | — | no | — | no | — | — | — | Community_e | 22/08/2021 | Cleaning. | 1: Animal water troughs. 2: Amergency construction of another boreholes, now the community uses water trucking from another city which far from baran to 50KM | — | — |
7985 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 12, 2022 | Mudug | goldogob | Tuulo-xanan | 1.5 | Charity | 12/03/2020 | Tuulo xanan BH | — | 7.4177271 | 47.2246497 | 395.0 | — | 1 | — | rural urban | yes | — | Yes | — | 1400 | — | — | — | — | — | 220.0 | pvc | 8.0 | 92.0 | 7.5 | 10.0 | — | 4.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 30.0 | PVC | 1700.0 | 1 | 3 | 2 | no | — | — | Submersible Pump | — | 11.0 | 195.0 | Generator | Parkins | 45.0 | — | — | good | — | yes | Colorless and odorless | 32.2 | 8.0 | 1870.0 | 928.0 | — | Communal | yes | 12/03/2021 | 5 | 0 | no | — | no | — | — | — | NRC | 12/03/2021 | 1. Construction of new elevated tank. | 1. Fuel supporting. 3. Installation of solar power. 4. Fancing. | — | — |
7974 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 14, 2022 | Mudug | galkayo | Bone | 1.3 | ICNA | 14/03/2019 | Bone BH | — | 7.3018054 | 47.5684045 | 362.0 | — | 1 | — | urban rural | yes | — | Yes | — | 3500 | 1000 | 200 | 8000 | — | — | 250.0 | pvc | 8.0 | 60.0 | 12.0 | 8.0 | — | 1.4 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 24.0 | Galvanised Steel | 1350.0 | — | 2 | 3 | yes | 15 | 8.0 | Submersible Pump | — | 11.0 | 240.0 | Hybrid - Solar/Generator | Parkins | 45.0 | MS350M-73 | 18.2 | good | — | yes | Colorless and odorless | 35.6 | 7.6 | 1971.0 | 981.0 | — | Communal | yes | 14/03/2019 | 5 | 2 | no | — | no | — | — | — | NRC | 14/02/2021 | 1. Construction of new elevated tank | 1. Pump and riser pipes rehabilitation. 2. Fuel supporting. 3. Operator supporting. 4. Construction of new kiosks bone IDP. | — | — |
7976 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 10, 2022 | Mudug | goldogob | Bursaalax | 0.7 | Community | 10/10/2021 | Rouble BH bursaalax | — | 7.164917 | 47.2376117 | 355.0 | — | 7 | — | urban | yes | — | Yes | — | 1400 | — | — | — | — | — | 220.0 | pvc | 8.0 | — | 20.0 | 5.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 28.0 | Galvanised Steel | 80.0 | — | — | 2 | yes | 4 | 8.0 | Submersible Pump | — | 15.0 | 185.0 | Generator | Parkins | 45.0 | — | — | poor | There is no any water supply | yes | Colorless and odorless | 32.3 | 7.8 | 1946.0 | 1303.0 | — | Communal | yes | 10/10/2021 | 4 | 0 | no | — | no | — | — | — | — | — | — | 1. Installation of solar power 2. Construction of new elevated tank 3. Water supply pipes 5. Construction of koisks and animal troughts | — | — |
7980 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 10, 2022 | Mudug | goldogob | Bursaalax | 0.5 | Community | 10/02/2021 | Mahiigaan BH | — | 7.1654211 | 47.2408643 | 355.0 | — | 5 | — | urban | yes | — | Yes | — | — | — | — | — | — | — | 220.0 | pvc | 8.0 | — | 24.0 | — | — | 0.3 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 80.0 | PVC | 120.0 | — | — | — | no | — | — | No Pump | — | — | — | — | — | — | — | — | poor | There is no supply for this borehole | yes | Colorless and odorless | 33.1 | 7.6 | 1902.0 | 1274.3 | — | Communal | yes | 10/02/2021 | 3 | 2 | yes | — | no | — | — | — | Community | 10/03/2022 | 1. Construction of elevated water tank | Construction of new elevated tank. Installation of solar power. Construction of koisks and animal troughts. 5. Installation of generator. | — | — |
8021 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 13, 2022 | Sanaag | laasqoray | Buraan | 0.4 | Al manhal charity | 26/05/2010 | Buraan borehole 2 | — | 10.2110303 | 48.7746238 | 943.0 | — | 5 | — | rural urban | yes | — | Yes | — | 4500 | — | — | — | — | — | 60.0 | pvc | 8.0 | 9.0 | 4.0 | 8.0 | — | 1.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Galvanised Steel | — | 300 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | fair | Buraan borehole 1 and 2 are connected same distribution pipes lines, same generator and solar, same elevated water tank. Yield is very low. | no | — | 31.9 | 7.4 | 1581.0 | 775.0 | — | Communal | — | — | — | — | — | — | — | — | — | — | — | — | Buraan borehole 1, and 2 are connected same distribution pipes, solar, generator, storage water tanks hence this borehole and borehole 1 are same intervention | — | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France