Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7161 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 22, 2022 | Bari | iskushuban | Dawacaaley | 2.0 | Save the children | 01/01/2020 | Dawacaaley borehole | — | 10.5667937 | 50.0366927 | 387.0 | — | 1 | — | rural urban | yes | — | No | 15 March 2021 The main raising pipes are rusted and the pump stopped working. | 5000 | 20000 | — | 40000 | — | — | 275.0 | pvc | 8.0 | — | — | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 40.0 | PVC | 2200.0 | 40 | 2 | 2 | yes | 10 | 8.0 | Submersible Pump | — | — | — | Hybrid - Solar/Generator | Perkins | 45.0 | BR-M300 | 22.8 | poor | 1.The pump stopped working 2.the main raising pipes need changing they were inside the borehole for more than two years and they are rusted. 3.The plastic pipes that supplies the village are broken and wasting the water. | no | — | — | — | — | — | — | Communal | no | — | — | — | yes | 0.05 | yes | — | — | — | — | — | No intervention was carried out since the borehole started working. | 1. Immediate change (Rehabilitation) of main raising pipes and the submersible pump. 2.full pipeline Rehabilitation 3. Another water tank 4. 3 more kiosks 5. 2 more troughs 6. Control valves (supply stations). 7. Storage room | — | — |
7546 | — | Borehole | FGS Ministry of Energy and Water Resources | March 15, 2022 | Middle Shabelle | balcad | Caliyalle | 1.0 | SAACID | 15/03/1996 | Caliyalle BH | — | 2.1793298 | 45.399509 | 122.0 | — | — | — | rural | yes | — | Yes | — | 2550 | 0 | 0 | 0 | 0.0 | — | 150.0 | gi | 8.0 | 115.0 | — | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 25.0 | Galvanised Steel | 100.0 | 170 | 5 | 0 | no | — | — | Submersible Pump | Mechanical pump | — | 115.0 | Generator | LISTER-PETTER | 30.0 | — | — | fair | It's in a good condition | no | — | — | — | — | — | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | no | — | — | — | — | — | No intervention since the establishment date | Supply of Generator and construction of elevated water tank and pipeline extension. | — | — |
8337 | — | Borehole | Somaliland MoWRD | April 7, 2022 | Sool | las_caanood | Oodogooye | 7.0 | Private | 03/03/2018 | Ugaaso borehole | — | 8.4864682 | 47.4080974 | 620.0 | — | 2 | — | rural | yes | — | No | The Generator and the pump are not working due electrical shock to the generator and damage to the pump | 4000 | 5000 | 18 | 3000 | 1.0 | — | 330.0 | pvc | 8.0 | 240.0 | 16.0 | 5.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 40.0 | Galvanised Steel | 100.0 | 500 | 1 | 1 | yes | 10 | 8.0 | Submersible Pump | Lawara | 8.0 | 90.0 | Generator | Perkins | 45.0 | — | — | poor | The system is not functioning | no | — | — | — | — | — | — | Private/Individual | — | — | — | — | no | — | no | — | — | — | — | — | No intervention since drilled this borehole | It needs to repair or replace the generator and the pump as well as pipelines | — | — |
8351 | — | Borehole | FGS Ministry of Energy and Water Resources | March 15, 2022 | Middle Shabelle | balcad | Waabari | 0.0 | Qatar Charity | 11/12/2018 | Imamu Nawawi | — | 2.355822 | 45.3872438 | 111.0 | — | — | — | urban | yes | — | Yes | — | 1250 | — | — | — | — | — | 70.0 | gi | 8.0 | — | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 15.0 | Galvanised Steel | 25.0 | 0 | 3 | 0 | no | — | — | Submersible Pump | Lowara 5.5kw | 17.0 | 46.0 | Generator | Changfa 125 | — | — | — | good | It's in a good condition | no | — | — | — | — | — | — | Other | — | — | — | — | no | — | no | — | — | — | — | — | No intervention since drilled | Elevated water tank, supply of Generator and submersible pump. | — | — |
8280 | — | Dam | Somaliland MoWRD | April 20, 2022 | Woqooyi Galbeed | hargeisa | Cadaroosh Dam | 0.3 | Community | — | Cadaroosh Dam | — | 9.3512083 | 43.7641662 | 1354.0 | — | 3 | — | rural urban | no | 8 | No | Becouse of the drought | 2100 | 700 | 500 | 4000 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 2.0 | 80.0 | 80.0 | — | — | — | — | — | — | — | — | — | — | — | — | 300 | 0 | 0 | no | — | — | — | — | — | — | — | — | — | — | — | — | No supply system | no | — | 0.0 | — | — | — | — | Communal | no | — | — | — | no | — | no | — | — | — | — | — | No intervention required | All infrustructure and geomembrane. | — | — |
7691 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 13, 2022 | Bari | iskushuban | Jeedal | 2.0 | UNICEF | 19/02/2022 | Jeedal borehole | — | 10.2112917 | 49.5234167 | 647.0 | — | 1 | — | rural urban | yes | — | Yes | — | — | — | — | — | — | — | 260.0 | pvc | 8.0 | — | 14.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | yes | 25 | 8.0 | Submersible Pump | Lowara | — | 276.0 | Generator | Perkins | 45.0 | — | — | fair | No elevated water tank No animal troughs. No water points. | no | — | 33.0 | 8.2 | 1350.0 | 680.0 | — | Communal | no | — | — | — | yes | 0.015 | — | — | — | — | — | — | No intervention is performed, because the borehole is newer | This borehole is under construction, elevated water tank, troughs and the care taker room is to be constructed soon. Despite that they need the flowing intervention:- 1: Installation of solar power system,due to the increased fuel prices. 2: Water tank for the town supply. 3: Distribution pipes and kiosks for the settlement. | — | — |
8120 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 20, 2022 | Bari | iskushuban | Baargaal | 1.0 | Community_ | 18/02/2021 | Baargal borehole 2 | — | 11.2846495 | 51.0714189 | 30.0 | — | 2 | — | rural urban | yes | — | Yes | — | — | — | — | — | — | — | 24.0 | pvc | 8.0 | 15.0 | 12.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Submersible Pump | Lowara | — | 18.0 | — | — | — | — | — | fair | No storage water tank No distribution pipe line The bore hole is new and has no water structures. | no | — | 27.9 | 7.8 | 1077.0 | 533.0 | — | Communal | yes | 21/08/1993 | 7 | 0 | — | — | — | — | — | — | — | — | No intervention is performed because the borehole is new. | 1: Elevated water tank 2: Distribution pipe line. 3: Installation of solar power system. | — | — |
8045 | — | Dug Well | Somaliland MoWRD | April 9, 2022 | Togdheer | owdweyne | Ceel same | 0.3 | Privately established | 09/04/1975 | Ceelsame Dug well | — | 9.3832834 | 45.1614301 | 1019.0 | — | 19 | — | urban rural | yes | — | Yes | — | 500 | 1000 | 30 | 1500 | 0.0 | — | — | — | — | — | — | — | — | — | 20.0 | 18.0 | 1.0 | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | Other | 0.0 | Other | 0.0 | 10 | 0 | 0 | yes | 7 | 9.0 | No Pump | — | — | — | — | — | — | — | — | poor | Poor | yes | Brown with suspensions | 27.2 | 7.44 | 1424.0 | 905.0 | — | Private/Individual | — | — | — | — | no | — | no | — | — | — | — | — | No intervention is carried out | No intervention is required | — | — |
7953 | — | Borehole | Somaliland MoWRD | April 5, 2022 | Woqooyi Galbeed | berbera | Geel lookor | 0.2 | Berbera Local Government | 01/03/2020 | Geel lookor borehole | — | 10.1363076 | 45.1823224 | 584.0 | — | 1 | — | rural urban | yes | — | Yes | — | 3500 | 300 | 0 | 7000 | 0.0 | — | 80.0 | gi | 6.0 | 14.0 | 12.0 | 8.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 24.0 | Galvanised Steel | 500.0 | 20 | 0 | 0 | no | — | — | Submersible Pump | Grundfos | 7.5 | 63.0 | Solar | — | — | DUSOL | 8.58 | poor | Geel loo kor water supply system is good and water transformed saline and require to drill and replacement borehole and transmision main pipe are degraded and require to be replace into pvc and geophysical survey for new borehole, generator and caretaker room require, animal troughs | no | — | 28.5 | 7.83 | 2130.0 | 1490.0 | — | Communal | no | — | — | — | no | — | no | — | — | — | — | — | No intervention carried out. | Geel loo kor water is good and water transformed saline and require to drill and replacement borehole and transmision main pipe are degraded and require to be replace into pvc and geophysical survey for new borehole, generator and caretaker room require, animal troughs | — | — |
7597 | — | Borehole | Somaliland MoWRD | April 22, 2022 | Woqooyi Galbeed | gebiley | Botor | 0.1 | UNICEF | 20/05/2014 | Botorwajale borehole 2 | — | 9.6968039 | 43.5203927 | 1512.0 | — | 0 | — | rural urban | yes | — | Yes | — | 10500 | 60 | 200 | 250 | 0.0 | — | 140.0 | gi | 8.0 | 89.0 | 55.0 | 18.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 40.0 | PVC | 20.0 | 750 | 1 | 2 | no | — | — | Submersible Pump | Grundfos | 30.0 | 120.0 | Hybrid - Solar/Generator | Linz | 160.0 | Solar | 93.6 | fair | The condition of supply system of this borehoke fair enough | no | — | 30.0 | 7.1 | 1294.0 | 916.0 | — | Communal | no | — | — | — | yes | 0.03 | no | — | — | — | — | — | No intervention carried out | Pump replacement | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France