Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7864 Borehole Somaliland MoWRD April 23, 2022 Sanaag laasqoray Balibusleh 2.0 Kuwait fund 23/04/2014 Balibusleh 10.0501079 48.5866082 1009.0 0 rural urban yes Yes 1350 13000 1000 17000 0.0 144.0 gi 8.0 100.0 18.0 12.0 44.0 1.0 Concrete/Masonry tank 12.0 Stainless Steel 250.0 0 0 3 yes 2 10.0 Submersible Pump Groundfos 18.0 75.0 Generator Adeulutz 30.0 fair Insufficient water supply system no 29.0 7.5 3000.0 636.0 Communal no no no 0 1.Solar pannel installation 2. Water tank 3. Animal trough 4. Watchman room
7897 Borehole Galmudug Ministry of Energy and Water Resources April 13, 2022 Mudug hobyo wargalo 0.5 GSA 10/12/2017 wargalo BH 6.267016 47.5167909 208.0 1 rural yes Yes 7500 4800 71000 200.0 pvc 8.0 17.5 16.0 Concrete/Masonry tank 70.0 Galvanised Steel 360.0 230 1 2 yes 8 9.0 Submersible Pump frangin 165.0 Hybrid - Solar/Generator perkin 30.0 380w 24.0 fair no 27.7 7.6 2570.0 1790.0 Communal IRC solar 2017-07-14
7629 Borehole Somaliland MoWRD April 2, 2022 Woqooyi Galbeed berbera Kalajab 24.0 RED CRESENT 29/07/2019 Kalajab boreholes 10.2570807 45.1077353 334.0 0 rural urban yes Yes 1000 600 0 5000 0.0 120.0 gi 8.0 70.0 40.0 10.0 0.0 0.0 Concrete/Masonry tank 20.0 PVC 500.0 40 0 0 yes 2 9.0 Submersible Pump Grundfoz 22.0 110.0 Generator Perkins 250.0 fair Kalajab boreholes is expecting to be connecting to remain transmision pipeline of berbera water supply as soon as possible. In kalajab there are other three caped boreholes which have the same technical specification with the current one. no 31.4 7.25 7710.0 874.0 Communal no yes 0.025 no No intervention carried out New borehole, 3 machines of 350KVA geophysical survey by getting new water sources.
7870 Spring Puntland Ministry of Energy Minerals and Water March 5, 2022 Bari bandar_beyla Bayla district 1.0 Bayla spring 9.5007969 50.8121613 -39.0 2 rural urban yes Yes 7200 5.0 Concrete/Masonry tank 23.0 Galvanised Steel 200 yes 17 9.0 Surface mounted Pump Lowara Generator Prkins 33.0 poor Because the yield of spring is very low, in addition to the pipe lines are rusted, and there is no animal troughs and kiosks. Bender bayla Have two spring which distribute water to one elevated water tank, then to the house holds. Both spring shares households, pipe lines. no 30.0 6.95 2850.0 1430.0 Communal yes 05/07/2016 5 0 no no Community_e 05/04/2020 Supplied of generator and 300 of pipe lines. Installation of solar power system. Construction of elevated water tank. Replacement of all rusted pipes. to Increase the yield of the spring either by digging deep or building large storage.
7873 Borehole Puntland Ministry of Energy Minerals and Water March 13, 2022 Mudug galkayo Fardaharis ICNA 13/03/2021 Fardaharis BH 7.0487097 47.4276759 303.0 1 rural urban yes Yes 500 250 800 160.0 pvc 8.0 15.0 8.0 1.0 Concrete/Masonry tank 30.0 Galvanised Steel 50.0 1 2 no Submersible Pump 11.0 105.0 Hybrid - Solar/Generator Leateck 30.0 AS-60-28W 16.8 fair Shortage of koisks yes Colorless and odorless 30.8 7.8 2831.0 1409.0 Communal yes 13/03/2021 6 0 no no ICNA 13/03/2021 1. Installation of solar power. 1. Construction of koisks 2. Extension of pipelines 4. Rehabilitation generator. 5. Fancing. 6. Construction of animal troughts.
7877 Borehole Somaliland MoWRD April 23, 2022 Sanaag laasqoray Kaladhac 4.5 Islamic Developmwnt bank fund. 23/10/2014 Kaladhac Bore hole 10.0487267 48.9363881 1008.0 1 rural urban yes Yes 1700 7630 540 15000 0.0 348.0 gi 8.0 132.0 12.0 12.0 8.0 0.2 Concrete/Masonry tank 30.0 Galvanised Steel 2500.0 0 4 4 yes 8 10.0 Submersible Pump Luwara 12.0 275.0 Generator Parkins 60.0 good Good functional water supply system no 33.0 7.5 2800.0 760.0 Communal no no no 0 1. New pump and Generator. 2. Fence 3. Pipe_ 2 inch/6m bore hole 4. Solar pannel installation
1216 BHMDGK081 Borehole Puntland_PWDA Oct. 27, 2019 Mudug Galkacyo Xarfo 0.1 WDA 04-01-86 Xarfo BH2 7.3468 47.6166 399.0 4.9 1 1572260334521.jpg Rural Urban Yes Abandoned Years ago, because aquifer sealed by clay or other materials 193.0 Concrete/Masonry tank 15.0 1 2 No Communal Full rehabilitation and borehole development and cleaning Strategic Water Sources Survey – WSS_NATl
8004 Borehole Galmudug Ministry of Energy and Water Resources April 10, 2022 Mudug galkayo Docole Carfuda 3.0 IRC Docole Carfuda 6.655722 47.579592 242.0 0 rural yes Yes 2000 500 50000 1.0 236.0 pvc 8.0 17.0 18.0 Concrete/Masonry tank 24.0 Galvanised Steel 150.0 700 1 3 yes 5 10.0 Submersible Pump lowara 210.0 Hybrid - Solar/Generator perkin 30.0 gps 330 24.0 fair 1. it has small water tank no 32.1 8.13 1710.0 1190.0 Communal
7893 Borehole Somaliland MoWRD April 3, 2022 Woqooyi Galbeed berbera Jiifto 0.2 Somaliland MoWRD 03/04/2020 Jiifto Borehole 10.3257208 44.9507936 139.0 2 rural yes Yes 3500 500 0 5500 0.1 120.0 pvc 8.0 30.0 10.0 4.0 0.0 0.0 Concrete/Masonry tank 40.0 PVC 200.0 0 1 1 no Submersible Pump Unknown 0.0 110.0 Generator Perkins 30.0 good They supply the water in a good manner and we sow the people are satisfy and happy. no 36.1 7.8 2610.0 1850.0 Communal no no no DP world No intervention carried out Stop Kag, solar extending and fencing for solar.
7881 Borehole Somaliland MoWRD April 9, 2022 Sool las_caanood Karin gorfood 0.8 IR 01/01/2014 Karin Garfood borehole 8.1271413 47.7511336 702.0 1 rural urban yes Yes 560 160 0 8000 0.0 290.0 pvc 8.0 246.0 40.0 12.0 4.0 2.0 Concrete/Masonry tank 48.0 Galvanised Steel 8000.0 250 0 2 yes 12 18.0 Submersible Pump Luwara 7.0 240.0 Hybrid - Solar/Generator Perkins 60.0 Photovoltiac module 300.0 good The supply is working good though the solar system is not functioning due to electrical shock that damage the entire soil panels. no 27.0 7.9 2700.0 1900.0 Communal no no no IR 09/04/2020 Installed new pump and and make maintenance to the pipelines Solar panels are not working and require either replacement or repairing

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors