Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7769 Borehole Galmudug Ministry of Energy and Water Resources March 15, 2022 Galgaduud dhusa_marreb Hodan 0.0 Former military government of somalia 12/07/1982 Wakaalada 5.5302659 46.3801257 219.0 0 urban rural yes Yes 6500 0 0 90 0.15 160.0 gi 8.0 24.0 20.0 19.0 12.0 0.3 Concrete/Masonry tank 42.0 Galvanised Steel 360.0 1000 1 0 yes 25 18.0 Submersible Pump Franklin 20.0 45.0 Generator Perkin 30.0 fair 1.Water tanks are very small 2. GI Casing are leaching contamination water as working long time. no 29.0 7.1 2520.0 1250.0 Communal yes 2000-02-12 5 2 yes 0.0006 no Agency not specified 1. Generator 2. Small water tank CBD 2015-01-10
7771 Borehole Galmudug Ministry of Energy and Water Resources April 16, 2022 Mudug galkayo Garsor 0.1 indivual 08/01/2005 Carafat2 6.7510483 47.4276767 285.0 0 urban yes Yes 85000 230.0 pvc 10.0 28.0 23.0 Concrete/Masonry tank 400.0 Galvanised Steel 540.0 15000 0 0 no Submersible Pump grunfos 154.0 Generator Eveco 400.0 fair 1.water tank not completed no 39.9 7.96 1340.0 950.0 Private/Individual yes 0.0005 0
7875 Borehole Somaliland MoWRD April 24, 2022 Woqooyi Galbeed gebiley Arabsiyo 1.0 Mohamed Ali Barkhad 20/04/2018 Mukhtar Mohamed sh.Ahmed 9.6473638 43.7621416 1386.0 0 rural yes Yes 200 0 0 0 6.0 140.0 gi 10.0 90.0 15.0 17.0 0.0 0.0 30 0 0 no Submersible Pump Grundfos 20.0 133.0 Generator Aska 40.0 Very good supply system condition no 29.0 7.72 2800.0 2050.0 Private/Individual no no 20/03/2018
7723 Dug Well Somaliland MoWRD May 7, 2022 Awdal zeylac Xariirad 0.5 Community 01/12/1991 Xariirad dug well 10.3266971 42.8408477 946.0 2 urban yes Yes 2500 8.0 2.0 5.0 9.0 Concrete/Masonry tank 25.0 PVC 1000.0 350 0 0 no Submersible Pump 1.5 7.0 Hybrid - Solar/Generator Perkin 40.0 Axetic 3.0 fair This dugwell is jointed with xariirad borehole, and together they feed 700 household. no 29.0 7.35 1060.0 756.0 Utility/Local Authority yes 0.01 no Pipeline replacement, solar panel extension, and pump replacement.
7728 Dug Well FGS Ministry of Energy and Water Resources March 30, 2022 Lower Shabelle afgooye Waanjeele 3.0 Private 13/01/1998 AL NAJAX WATER SUPPLY 2.1514949 45.1228462 41.0 5 rural yes Yes 3500 0 0 0 1.0 20.0 6.0 10.0 19.0 2.0 1.0 Concrete/Masonry tank 36.0 PVC 1200.0 700 3 0 yes 2 10.0 Submersible Pump 4.5 KW 10.0 2.0 Generator Gancava China 125 25.0 poor In January, February, March and first 15 days of April there is a gab for our supply system yes Good 0.0 Communal yes 19-Nov-10 4 2 yes 0.01 no Zam zam foundation 18-Mar-08 Provision of new dug well, distribution of Chlorine Provision of two borehole , rehabilitation of reservior, provide of solar system, distribution of pipeline, provide pump and sumersible. Distribution of chlorine while january, february, march and april
7729 Dug Well FGS Ministry of Energy and Water Resources March 30, 2022 Lower Shabelle afgooye Damaleey 1.0 Private 29/11/2004 Towfiiq water supply 2.1418269 45.1153118 63.0 2 rural yes Yes 1600 0 0 0 0.0 22.0 2.0 2.0 24.0 2.0 2.0 Plastic tank 7.0 PVC 1000.0 400 1 0 no Submersible Pump 2.5 Italian 2.5 1.0 Electricity Grid poor After starting the work every thing was going good but after 2 years there was poor supply system yes Good 0.0 Private/Individual yes 0.01 no Private 18-Feb-22 Remove the soil from the well and replace the old pipeline Increase the depth of the well, rehabilitation of old well and increase the 3 Wells, provide additional pipeline, receive generator or solar system
7780 Borehole Somaliland MoWRD April 23, 2022 Woqooyi Galbeed gebiley Arabsiyo 1.0 Ibrahim Aw-muse 23/06/2020 Ibrahim Aw-muse borehole 9.6597313 43.7688607 1382.0 0 urban yes Yes 12000 130.0 gi 8.0 90.0 9.0 18.0 0.0 0.0 Other 50.0 1714 0 0 yes 20 10.0 Submersible Pump Grundfos 15.0 110.0 Hybrid - Solar/Generator Perkins 45.0 Dusol 16.38 Same to the other lbrahim's borehole no 29.0 7.5 8637.0 450.0 Private/Individual yes
7782 Borehole Somaliland MoWRD April 5, 2022 Woqooyi Galbeed berbera Daray godle 0.6 Yemeni bussiness man 09/12/2014 Daray godle borehole 10.1660623 44.8474318 449.0 0 rural urban yes Yes 2000 700 0 3500 0.0 80.0 pvc 6.0 30.0 2.0 8.0 0.0 0.0 Concrete/Masonry tank 8.0 Other 700.0 0 0 0 no Submersible Pump Unkown 1.5 60.0 Solar SZYL-M320-36 0.96 good The borehole pump the water all the day and is very good no 29.1 8.15 8120.0 578.0 Communal no no no No intervention carried out Care taker room, fence of solar, animal trouphs, kiosk, solar extension.
7734 Dug Well Somaliland MoWRD April 5, 2022 Woqooyi Galbeed berbera Laalays 5.0 COOPI 01/01/1996 Laalays borehole 10.0741311 45.1737373 654.0 0 urban yes Yes 2100 10.0 7.0 6.0 8.0 Concrete/Masonry tank 20.0 Galvanised Steel 5000.0 15 1 0 no Submersible Pump Unkown 0.0 5.0 Solar Unkown 1.25 good Laalays has very good supply system no 28.8 7.96 1199.0 7990.0 Communal no yes 0.006 no No intervention carried out Gabion to store sand, pipes replacement, animal troughs.
8312 Borehole Puntland Ministry of Energy Minerals and Water March 7, 2022 Mudug galkayo Najax IDP Galkacayo Xisbulislaam 07/03/2017 Wadajir BH 6.8134989 47.3897698 258.0 1 urban yes Yes 4550 195.0 pvc 8.0 4.0 12.0 4.0 Concrete/Masonry tank 5.0 Galvanised Steel 750.0 10 3 0 no Submersible Pump 145.0 Hybrid - Solar/Generator 30.0 SGY15KH 15.0 poor Needs construction of new animal thoughts no Communal no no no Agency not specified 07/03/2017 1. Installation of solar power 1. Construction of new elevated tank 2. Rehabilitation of kiosks and 3.construction of new kiosks.

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors