Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
8335 Borehole FGS Ministry of Energy and Water Resources March 22, 2022 Hiraan beled_weyne Ilka cado 20.0 Community 17/11/2007 Ilka cado water community 4.9111314 45.2204378 178.0 3 rural no 12 No It was stoped when the pump and generator are spoiled 3000 200 300 750 0.0 230.0 pvc 8.0 75.0 10.0 8.0 15.0 2.0 Concrete/Masonry tank 27.0 PVC 400.0 428 1 2 no Submersible Pump Lowara submersible pump 10.0 90.0 Generator Changafa 12.0 fair Luck of pump and generator no Private/Individual no no Community 22-Mar-14 Elevator water tank Pump and generator
8011 Borehole Somaliland MoWRD April 14, 2022 Sool las_caanood Yigoori 8.0 UNICEF 14/04/2018 Sixawle 5 8.7209838 47.0279152 633.0 4 rural urban yes Yes 5000 600 0 3000 0.0 70.0 pvc 8.0 20.0 24.0 9.0 0.0 0.0 Concrete/Masonry tank 20.0 Galvanised Steel 1200.0 50 1 5 yes 10 Submersible Pump Groundfost 25.0 65.0 Hybrid - Solar/Generator Perkins 45.0 M2 320.0 good Good condition no 30.0 8.2 1650.0 1020.0 Communal yes 14/04/2018 8 0 no no The 4 and 5 boreholes are interconnected so they more strong solar system and pipelines
8274 Dam Somaliland MoWRD April 22, 2022 Woqooyi Galbeed gebiley Bohole Qawle 0.1 Somaliland MoWRD 20/03/2021 Bohole Qawle Dam 9.725607 43.6748239 1374.0 0 rural yes Yes 3000 500 600 1500 0.0 12.0 600 0 0 no The dam is open, animals human, And even wild animals consume freely no 0.0 Communal no no no No intervention required
7223 Borehole Puntland Ministry of Energy Minerals and Water Feb. 26, 2022 Mudug jariban Godobjiiran BH 1 0.0 Chinese Government 26/02/1986 Godobjiraan BH 1 7.5139859 49.4103095 123.0 2 rural urban yes Yes 28000 1500 10000 0.0 210.0 gi 6.0 20.0 10.0 1.5 Concrete/Masonry tank 36.0 Galvanised Steel 180.0 4000 6 3 yes 4 24.0 Submersible Pump Gran fos 11.0 150.0 Hybrid - Solar/Generator Parkins 45.0 SZYL_P300_36 15.0 fair Needs rehabilitation yes Colorless and odorless 31.6 7.7 2800.0 1876.0 Communal yes 26/02/1986 4 1 yes 0.15 yes KAALO Relief and Development 26/02/2017 Rehabilitation of elevated water tank 1. Drilling new borehole. 2.fancing borehole areas. 3. Rehabilitation of generators and caretaker rooms. 4. Needs to help fuel. 5. Construction of new kiosks. 6. Rehabilitation of kiosks. 7. Rehabilitation of animal thoughts.
8049 Borehole Somaliland MoWRD May 4, 2022 Sanaag ceel_afweyn Ceel afweyn 0.5 Former Somalia government- china 19/08/1985 Caday musbaax 9.9100643908605 47.2531728353351 1038.0 0 rural yes Yes 300 5000 50 15000 0.0 300.0 gi 8.0 100.0 15.0 5.0 0.0 0.0 Concrete/Masonry tank 5.0 Galvanised Steel 5000.0 1500 5 1 no Submersible Pump Laure 8.0 120.0 Hybrid - Solar/Generator P40P3 32.0 Lorentz 15.0 good The system is functioning at the present time however there is alot of interventions needed which mentioned as the following no 30.0 7.4 1400.0 1000.0 Communal no no no Oxfam Novib 23/12/2021 Borehole rehabilitation 15Kw solar system installation, provision of Borehole fencing, Replacement of Raiser Mains. This borehole needs animal troughs, elevated water tanks, pipeline extension, Kiosk rehabilitation,and Generator instruments. Filters.
8341 Borehole Somaliland MoWRD April 14, 2022 Sool las_caanood Adhicadeeye 0.3 Sdf 14/04/2019 Adhicadeeye borehole 2 8.6696166 47.1504598 625.0 2 rural urban yes Abandoned The borehole is not functioning and all the supply system are no longer connected. No generator and solar system 0 0 0 0 0.0 110.0 pvc 8.0 93.0 Other Other 0 no Submersible Pump Luwara 11.0 85.0 poor No generator and no solar no It requires full operation and running the borehole by delivering generator or solar and installation of supply system
8039 Borehole Somaliland MoWRD March 30, 2022 Togdheer buuhoodle Dan-Dan 1.0 IR 16/02/2016 Dan Dan Borehole 8.25139459222555 46.5295369829983 649.0 1 rural urban yes Yes 2000 10000 200 15000 0.0 370.0 pvc 8.0 260.0 48.0 10.0 Concrete/Masonry tank 36.0 PVC 1500.0 12000 4 5 yes 10 16.0 Submersible Pump GRoundfors 15.0 280.0 Hybrid - Solar/Generator P50-3000 50.0 The solar isn't functioning 330.0 good The supply system is good however the pipeline of the village needs to change from Galvanized to PVC no 34.0 7.2 1470.0 2300.0 Communal no no no CARE Somalia 30/03/2021 Installation of submersible pump 15KW and cable, Installation of rising pipes, Construction of elevated water tank 25Cubic meters, construction of camel troughs, rehabilitation of goat through and water kiosk, rehabilitation of supply system, supply and installation of solar inverter. Currently the needs of this borehole are supply and installation of solar system which is not functioning, moreover, the pipeline of the village needa to change and install PVC.
8040 Borehole Somaliland MoWRD April 22, 2022 Sanaag laasqoray Ceel buh 1.0 Horn Relief Ceelbuh borehole3 10.23609 48.3110082 1104.0 1 rural urban yes Yes 1200 1300 750 1700 0.0 240.0 gi 8.0 230.0 1.5 12.0 20.0 24.0 Concrete/Masonry tank 35.0 Galvanised Steel 500.0 1 2 3 yes 2 10.0 Submersible Pump Luwara 40.0 75.0 Generator Parkins 45.0 poor Inadeqauate water supply system no 31.0 7.7 1450.0 1000.0 Communal no no no O 1.New pump Installation 11 kvA 2.Generator 45 kW 3.Replacement Gi Piple class c
8344 Borehole FGS Ministry of Energy and Water Resources March 22, 2022 Hiraan beled_weyne Kalabeeyr 30.0 Community 17/10/2011 Kalabeeyr water supply 4.9338 45.2225321 193.0 6 urban rural no 5 No This water is more sult and the human cannot drink and cooks 0 0 0 0 0.0 210.0 pvc 10.0 95.0 10.0 24.0 20.0 1.0 Concrete/Masonry tank 30.0 PVC 250.0 0 0 0 no Submersible Pump Somoco mersible pump 8.0 80.0 Generator Eveka generator 30.0 poor This water needs to filter no Private/Individual no no Community 19-Apr-20 Rehabilitation Solar pump, generator
8041 Borehole Somaliland MoWRD March 30, 2022 Togdheer buuhoodle Ceegaag 1.0 UNICEF 14/10/2011 Ceegaag Borehole 8.61694929655641 46.4946011267602 792.0 0 rural yes Yes 300 500 0 500 0.0 350.0 pvc 8.0 312.0 15.0 6.0 Concrete/Masonry tank 14.0 PVC 1200.0 900 5 4 yes 5 8.0 Submersible Pump Groundfors 40.0 213.0 Hybrid - Solar/Generator JP45 45.0 Photovoltaic Module 300.0 good no 34.0 7.1 1450.0 2600.0 Communal yes 23/11/2018 5 3 no no No interventions carried out recently Fence, change cable, change of pump, increase number of animal throughs.

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors