Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
3928 DWMDHO065 Dug Well FGS_MoEWR Sept. 18, 2019 Mudug Hobyo Herodhagahley Community 1/22/2014 Herodhagahley ShW 5.5841 48.2393 91.0 15 1569518832140.jpg yes Yes 1670 540 30 1360 0.0 No 10.0 7.0 24.0 490 yes 4 10.0 No Pump Low WASH condition No 31.2 7.3 1880.0 910.0 Yes 4/22/2016 7 2 No No Community Cleaning and deepening 2018-11-24 New borehole and solar system Strategic Water Sources Survey – WSS_NATl
8006 Borehole Somaliland MoWRD May 9, 2022 Togdheer burco Isha Burco Area 0.3 Buroa Water Agency 05/01/2017 Ceelka 14aad 9.51126873493195 45.5707983858883 1007.0 1 urban rural yes Yes 10000 0 0 0 0.0 180.0 pvc 8.0 160.0 18.0 12.0 Other Other 0 0 0 yes 6 8.0 Submersible Pump Laware 24.0 106.0 Generator Perkins 66.0 good Good Condition no 29.0 7.8 1700.0 636.0 Utility/Local Authority no no Solar installation Provision of fencing
1393 BHMSBA019 Borehole FGS_MoEWR Sept. 29, 2019 Middle Shabelle Balcad Hareri Adle 0.0 Zamzan Foundation 12-06-16 Hareeri Caadle BH 2.2491 45.3962 174.0 0 1571156935865.jpg Rural Urban Yes Yes 50 50 250 0.0 120.0 PVC 8.0 80.0 11.0 16.0 Concrete/Masonry tank 17.0 Galvanised Steel 100.0 820 2 3 Yes 2 10.0 Submersible Pump Franklin 16.0 110.0 Hybrid - Solar/Generator Dos 20.0 Jeck 250.0 Poor No 30.0 7.55 1140.0 480.0 Communal 10-04-17 5 1 No No Private Pipes and pumps 2018-04-11 Full rehabilitation, large storage tanks, kiosks and animal troughs. Strategic Water Sources Survey – WSS_NATl
8360 Borehole FGS Ministry of Energy and Water Resources March 14, 2022 Hiraan beled_weyne Gasle 35.0 ADRA 18/10/2021 Ceelka gasle 4.9287959 45.1598713 159.0 4 rural no 1 No Lack of water tanker and error for solar system 800 500 200 300 0.0 230.0 pvc 8.0 80.0 30.0 1.0 18.0 2.0 Other 0.0 PVC 0.0 80 0 0 no Submersible Pump Comoco submersible pump 5.0 15.0 Solar 240.0 fair Lack of technical for the solar system installation no Utility/Local Authority no no Generator, and tanker
8248 Borehole Somaliland MoWRD April 27, 2022 Woqooyi Galbeed gebiley Carro yanbo 0.6 Cago Wayne Cago Wayne borehole 2 9.6577827 43.7986936 1377.0 0 yes No 8 months before becouse it collapse 0 0 0 0 0.0 130.0 gi 8.0 70.0 0.0 0.0 0.0 0.0 Concrete/Masonry tank 20.0 0 0 0 no Submersible Pump Grundfos 0.0 104.0 no 0.0 Private/Individual no no
8051 Borehole Somaliland MoWRD March 30, 2022 Togdheer buuhoodle Faarah Bullay 3.0 UNICEF 24/12/2010 Farah Bullay Borehole 8.2214527996257 46.3526437059045 625.0 1 rural urban yes Yes 85000 5000 0 6000 0.0 365.0 pvc 8.0 330.0 60.0 12.0 Other PVC 4.0 36000 9 6 yes 20 20.0 Submersible Pump Laura 6.0 330.0 Hybrid - Solar/Generator JP45 60.0 BRM300W 300.0 good The no 30.0 7.1 1400.0 2600.0 Communal yes 14/04/2010 5 3 no no UNICEF 30/03/2022 Rehabilitation of borehole Hhsygssg
7628 Borehole Somaliland MoWRD April 22, 2022 Woqooyi Galbeed gebiley Botor 0.1 Khalifa Foundation UAE 22/04/2007 Botor borehole 2 9.6944256 43.5138571 1515.0 0 rural urban yes No Before 3 weeks cable failure. 1000 50 250 400 0.0 160.0 gi 8.0 89.0 15.0 17.0 0.0 0.0 PVC 2000.0 143 0 0 no Submersible Pump Grundfos 20.0 120.0 Generator Iveco 265.0 good This borehole is not functioning right now but before the supply was good no 0.0 Communal no yes 0.0258 no Capable replacement.
1391 BHMSBA017 Borehole FGS_MoEWR Sept. 29, 2019 Middle Shabelle Balcad Carofaag 0.0 IR - Islamic Relief Somalia 12-04-12 Carifaag BH 2.2789 45.3953 145.0 2 1571155717278.jpg Rural Urban Yes Yes 985 4950 1965 0.0 130.0 PVC 8.0 100.0 11.0 4.0 Concrete/Masonry tank 16.0 Galvanised Steel 250.0 155 3 3 Yes 5 10.0 Submersible Pump Franklin 11.0 120.0 Generator Dos 30.0 Fair No 31.6 7.56 870.0 430.0 Communal 20-01-12 5 0 Yes 0.01 No Community Cleaning and pumps 2018-10-25 Solar system and full rehabilitation. Strategic Water Sources Survey – WSS_NATl
7606 Dug Well Somaliland MoWRD April 14, 2022 Woqooyi Galbeed hargeisa Diinqal 1.0 UNICEF 10/07/2015 Ceel lahelay dug well 1 9.6966113 44.3635061 1065.0 0 urban rural yes No Instalation of Pipe lines and increasing its depth to increase yield. 700 100 0 500 0.0 5.0 2.0 2.0 0.0 Concrete/Masonry tank 20.0 PVC 2000.0 100 1 0 no No Pump poor Condition of supply system is poor becouse water tankers take water from the dug well to the village. no 28.0 6.9 640.0 452.0 Communal no yes 0.03 no No intervention carried out Rehapilitation of the borehole and pipe instalation because the previous pipe failed.
8366 Borehole Puntland Ministry of Energy Minerals and Water March 14, 2022 Mudug galkayo Ceelgardi 0.5 24/03/2019 Ceelgardi BH 1 7.261886 47.572429 337.0 1 urban rural no 4 No For a months, Unknown problem 3000 600 1000 0.0 225.0 pvc 8.0 7.5 Concrete/Masonry tank 44.0 Galvanised Steel 40.0 5 2 yes 20 8.0 Submersible Pump Lowara 11.0 Hybrid - Solar/Generator Parkins 30.0 32.4 fair no Communal yes 24/03/2019 7 4 no no CARE Somalia 24/03/2022 1. Construction of new elevated tank 2. Extension of pipelines 3. Construction of new kiosks 4. Rehabilitation of pump and riser pipes 1. Construction of latrine.

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors