Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
1313 BHMDHO032 Borehole FGS_MoEWR Sept. 20, 2019 Mudug Hobyo Wisil 0.001 GTZ - German Agency for Technical Assistance 14-11-84 Wisil BH3 5.4275 48.1209 136.0 4.3 3 1569386551252.jpg Rural Urban Yes Yes 1200 300 2500 2.0 180.0 PVC 8.0 95.0 15.0 16.0 Concrete/Masonry tank 60.0 Galvanised Steel 5000.0 4737 3 7 Yes 3 10.0 Submersible Pump Grundfos 15.0 116.0 Generator Perkins 35.0 Fair No 24.5 7.9 4800.0 2300.0 Communal 30-11-13 3 2 Yes 0.001 No IRC - International Rescue Committee Generator and pipelines 2015-05-26 New borehole, large water storages and solar system Strategic Water Sources Survey – WSS_NATl
8234 Borehole Somaliland MoWRD April 21, 2022 Sanaag ceerigaabo Yubbeh 2.0 UNICEF 21/07/2010 Yube borehle 1 10.7497129 47.9199759 1449.0 1 rural urban yes No 1. Solar switch shock 1000 200 300 1500 0.5 94.0 gi 8.0 74.0 14.0 12.0 0.0 0.0 Concrete/Masonry tank 22.0 PVC 1.0 4500 2 4 no Submersible Pump Luwera 11.0 64.0 Hybrid - Solar/Generator Parkins. 45.0 Dusol 1500.0 poor Poor water supply system condition. no 27.0 Communal no no no 1 1.Solar switch electric shock Rehabilitation.
7474 Borehole Somaliland MoWRD April 11, 2022 Woqooyi Galbeed hargeisa Geed deeble 0.6 China 02/11/1970 K10 borehole 9.7927294 43.9992774 1051.0 0 urban yes Yes 31200 154.0 gi 8.0 42.0 62.6 23.0 0.0 0.0 Concrete/Masonry tank 30000.0 4457 0 0 no Submersible Pump Lawara 20.0 80.0 Electricity Grid fair Centralized system of supply no 32.6 7.2 1106.0 550.0 Communal no yes 0.06 no No intervention required
7589 Borehole Somaliland MoWRD April 11, 2022 Woqooyi Galbeed hargeisa Geed deeble 0.3 China 02/11/1970 K6 borehole 9.757089 43.9829836 1072.0 0 urban yes Yes 143.0 gi 8.0 41.0 64.0 23.0 0.0 0.0 Concrete/Masonry tank 0.0 Stainless Steel 30000.0 4457 0 0 no Submersible Pump Capriri 64.0 63.0 Generator good The condition of the supply system is fair no 33.7 6.89 1170.0 590.0 Communal no yes 0.04 no New borehole
7588 Borehole Somaliland MoWRD April 11, 2022 Woqooyi Galbeed hargeisa Geed deeble 30.0 China 02/11/1984 K9 borehole 9.7886208 43.994276 1051.0 0 urban yes Yes 31200 154.0 gi 8.0 57.7 33.8 23.0 0.0 0.0 Concrete/Masonry tank 0.0 Stainless Steel 30000.0 4457 0 0 no Submersible Pump Capriri 33.0 69.0 Electricity Grid fair The condition of the supply system is fair no 33.0 7.7 1250.0 560.0 Communal no yes 0.04 no HWA is responsible its intervention
7587 Borehole Somaliland MoWRD April 11, 2022 Woqooyi Galbeed hargeisa Geed deeble 0.1 China 28/06/1970 K5 borehole 9.7644345 43.9878784 1083.0 0 urban yes Yes 31200 65.5 gi 8.0 44.0 45.0 23.0 0.0 0.0 Concrete/Masonry tank Stainless Steel 30000.0 4457 0 0 no Submersible Pump Lawara 45.0 72.0 Generator fair The condition of the supply system is fair no 32.4 7.07 1260.0 630.0 Communal no yes 0.04 no No intervention required
7590 Borehole Somaliland MoWRD April 11, 2022 Woqooyi Galbeed hargeisa Geed deeble 30.0 China 29/10/1982 K7 borehole 9.7943255 43.9631378 3811.0 0 urban yes Yes 31200 203.0 gi 8.0 48.0 47.7 23.0 0.0 0.0 Concrete/Masonry tank 0.0 Stainless Steel 30000.0 4457 0 0 no Submersible Pump Franklin 47.7 58.0 Electricity Grid fair The condition of the supply system is fair no 30.1 7.34 900.0 450.0 Communal no yes 0.04 no No intervention carried out
7592 Borehole Somaliland MoWRD April 11, 2022 Woqooyi Galbeed hargeisa Geed deeble 30.0 China 29/10/1970 K8 borehole 9.7692064 43.9642843 1022.0 0 urban yes Yes 31200 108.0 gi 8.0 27.0 55.0 23.0 0.0 0.0 Concrete/Masonry tank 0.0 Stainless Steel 30000.0 4457 0 0 no Submersible Pump Grundfos 55.0 40.0 Electricity Grid fair The condition of the supply system is fair no 30.4 7.35 600.0 300.0 Communal no yes 0.04 no No intervention required
7593 Borehole Somaliland MoWRD April 11, 2022 Woqooyi Galbeed hargeisa Geed deeble 0.1 China 30/04/1970 K4 borehole 9.7642106 43.9813575 1075.0 0 urban yes Yes 31200 155.81 gi 8.0 34.0 45.0 23.0 0.0 0.0 Concrete/Masonry tank 0.0 Galvanised Steel 0.0 4457 0 0 no Submersible Pump Grundfos 45.0 59.0 Electricity Grid fair Supply system is fair no 29.2 6.9 455.0 505.0 Communal no yes 0.04 no No intervention
7483 Borehole Somaliland MoWRD April 11, 2022 Woqooyi Galbeed hargeisa Geed deeble 0.1 Arab funded 11/04/2017 K3.2 borehole 9.7715334 43.9704239 1013.0 0 urban yes Yes 31200 91.0 gi 8.0 20.0 39.7 23.0 0.0 0.0 Concrete/Masonry tank 30000.0 4457 0 0 no Submersible Pump Capriri 39.0 42.0 Electricity Grid fair Fair supply system no 30.5 8.2 695.0 360.0 Communal no yes 0.06 no 02/04/2022 No intervention required

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors