Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
8294 | — | Borehole | Somaliland MoWRD | April 13, 2022 | Woqooyi Galbeed | hargeisa | Xunbo wayne village | 2.0 | Khalifa Foundation UAE | 12/05/2015 | Xunbo wayne borehole 4 | — | 9.814651 | 44.2907478 | 944.0 | — | 0 | — | — | yes | — | No | Becouse the boreholes are too close and affect each other and they are capped with 13 in number | 0 | 0 | 0 | 0 | 0.0 | — | 100.0 | pvc | 8.0 | 99.0 | 0.0 | 0.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 0.0 | — | 0.0 | 0 | 0 | 0 | no | — | — | No Pump | — | — | — | — | — | — | — | — | — | No supply system at all | no | — | 0.0 | — | — | — | — | Communal | no | — | — | — | no | — | no | — | — | — | — | — | — | No intervention required becouse it was caped | — | — |
8295 | — | Borehole | Somaliland MoWRD | April 27, 2022 | Woqooyi Galbeed | gebiley | Huluuq | 1.5 | Xasan | 22/04/2022 | Xasan borehole | — | 9.6625184 | 43.7884759 | 1350.0 | — | 0 | — | — | yes | — | No | New, still is under construction | 0 | 0 | 0 | 0 | 0.0 | — | 140.0 | gi | 8.0 | 78.0 | 0.0 | 0.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 0.0 | — | 0.0 | 0 | 0 | 0 | no | — | — | — | — | — | — | — | — | — | — | — | fair | Under construction | no | — | 0.0 | — | — | — | — | Private/Individual | — | — | — | — | no | — | no | — | — | — | — | — | — | — | — | — |
8619 | — | Dam | FGS Ministry of Energy and Water Resources | April 22, 2022 | Bay | bur_hakaba | Ubaare | — | Community_ | 01/01/1997 | Ubaare | — | 2.75645 | 44.03794 | 0.0 | — | 1 | — | rural | no | — | No | — | 468 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 5.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | fair | — | no | — | — | — | — | — | — | Communal | yes | — | — | — | — | — | — | — | — | — | — | — | — | Improve - Quick rehabilitation (Rehabilitation of canals and fencing) | — | — |
8296 | — | Borehole | Somaliland MoWRD | April 12, 2022 | Woqooyi Galbeed | hargeisa | Haruhaadlay | 0.6 | Hargeisa Water Agent | 12/02/2016 | Haruhaadlay borehole 3 | — | 9.8234483 | 44.0145348 | 1047.0 | — | 0 | — | — | yes | — | No | 2 years ago | 0 | 0 | 0 | — | 0.0 | — | 180.0 | gi | 8.0 | 40.0 | 0.0 | 0.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Other | 0.0 | — | 0.0 | 0 | 0 | 0 | no | — | — | No Pump | — | — | — | — | — | — | — | — | — | Have no supply becouse it does not connect the main system to hargeisa | no | — | 0.0 | — | — | — | — | Communal | no | — | — | — | no | — | no | — | — | — | — | — | — | No intervention required | — | — |
8297 | — | Borehole | Somaliland MoWRD | April 12, 2022 | Woqooyi Galbeed | hargeisa | Horuhaadlay | 0.1 | Hargeisa Water Agent | 08/07/2016 | Hruhaadlay borehole 2 | — | 9.8456869 | 44.0275593 | 1008.0 | — | 0 | — | — | yes | — | No | 2 years before | 0 | 0 | 0 | 0 | 0.0 | — | 200.0 | gi | 8.0 | 5.0 | 0.0 | 0.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Other | 0.0 | — | 0.0 | 0 | 0 | 0 | no | — | — | No Pump | — | — | — | — | — | — | — | — | — | no supply becouse it does not connect the main system to hargeisa. | no | — | 0.0 | — | — | — | — | Communal | no | — | — | — | no | — | no | — | — | — | — | — | Pump and pipes | Hargeisa water agent is the responsible agent for horuhaadlay boreholes. | — | — |
8737 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 7, 2022 | Mudug | goldogob | Xerojaalle | 0.5 | — | — | Xerojaalle | — | 6.987134 | 47.1766608 | 320.0 | — | 1 | — | rural urban | no | 8 | No | A months, borehole problems | 2500 | — | — | — | 0.0 | — | — | pvc | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | yes | — | — | — | — | — | — | Communal | no | — | — | — | — | — | — | — | — | — | NRC | 07/03/2020 | Construction of elevated water | 1. Emergency 2. Observation of borehole | — | — |
8301 | — | Borehole | Somaliland MoWRD | May 5, 2022 | Sanaag | ceel_afweyn | Kulaal | 0.5 | Puntland MoEMW | 24/09/2011 | Kulaal one borehole | — | 9.74837353918701 | 47.6491508726031 | 896.0 | — | 1 | — | rural | no | 0 | No | When this borehole drilled it become poor and less productive after that the community of this area begun to mobilize and search for new water source. So this borehole is non functioning. | 0 | 0 | 0 | 0 | 0.0 | — | 140.0 | other | 0.0 | — | 0.0 | 0.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Other | — | Other | — | 0 | 0 | 0 | no | — | — | No Pump | — | — | — | — | — | — | — | — | poor | This system isnt functioning currently and its abandoned | no | — | 0.0 | — | — | — | — | Other | — | — | — | — | no | — | no | — | — | — | — | 07/11/2011 | This borehole is abondoned and don't need any intervention. | 0 | — | — |
8304 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 1, 2022 | Togdheer | buuhoodle | Xadhadhan | 1.4 | ISRC | 01/04/2016 | Xadhadhan BH | — | 8.3000813 | 46.156516 | 660.0 | — | 1 | — | urban rural | yes | — | No | Year and half, problem of pump and cables | 21000 | — | — | — | — | — | 373.0 | pvc | 8.0 | — | 12.0 | — | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 60.0 | PVC | 2000.0 | 30 | 4 | 4 | no | — | — | Submersible Pump | Lowara | 15.0 | 340.0 | Hybrid - Solar/Generator | Parkins | 60.0 | SZYL-M330-36 | 23.1 | fair | — | no | — | — | — | — | — | — | Communal | yes | 01/04/2016 | 3 | 2 | yes | — | — | — | — | — | CARE Somalia | 01/04/2019 | 1. Rehabilitation of pump and cables | 1. Emergency. 2. Installation of cables and pump. 3. Rehabilitation of solar | — | — |
8588 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 5, 2022 | Mudug | galkayo | Daryeel | — | Private | 05/03/2015 | Galkacayo daryleel BH 3 | — | 6.8159721 | 47.4382714 | 263.0 | — | 20 | — | urban | no | — | No | A year ago, For Operational problem stopped. | — | — | — | — | — | — | 160.0 | pvc | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 160.0 | PVC | — | — | — | — | no | — | — | No Pump | — | — | — | — | — | — | — | — | poor | Absolutely this source not functioning | no | — | — | — | — | — | — | Utility/Local Authority | — | — | — | — | no | — | no | — | — | — | — | — | — | 1. Fully rehabilitation of this borehole and its supply. | — | — |
8589 | — | Dam | Somaliland MoWRD | May 5, 2022 | Togdheer | burco | Bisiqa | — | FAO | 24/04/2019 | Bisiqa Earth Dam | — | 8.69586 | 45.46847 | — | — | — | — | rural | no | 6 | No | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 2.0 | 95.0 | 80.0 | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | PVC | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | no | — | — | — | — | — | — | Communal | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France