Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7785 Borehole Puntland Ministry of Energy Minerals and Water Feb. 28, 2022 Mudug jariban Garacad 1 0.5 CARE Somalia 28/02/2006 Garacad BH 1 6.9437939 49.3254529 -22.0 3 urban yes Yes 15000 7.0 pvc 8.0 2.0 5.0 2.0 Concrete/Masonry tank 13.0 Galvanised Steel 1500.0 134 0 no Submersible Pump 1.5 5.0 Solar poor Because of more saline in water, the water supply corrosion than destroyed yes Very saline water 29.1 7.8 7240.0 4850.0 Utility/Local Authority no no 1.Drilling new borehole far away for this borehole because this borehole so saline 2. Rehabilitation and reconstruction all water supply.
7822 Borehole Somaliland MoWRD April 14, 2022 Sool las_caanood Samokaab 3.0 IR 14/04/2018 Samokaab borehole 8.6757978 47.0947488 636.0 1 urban rural yes Yes 3500 600 0 1460 0.0 158.0 pvc 8.0 96.0 20.0 10.0 0.0 0.0 Concrete/Masonry tank 40.0 Galvanised Steel 1500.0 300 6 3 yes 30 9.0 Submersible Pump Luwara 11.0 90.0 Hybrid - Solar/Generator Perkins 45.0 Photovoltiac 300.0 good Pipelines line problem exists no 29.0 7.5 4000.0 300.0 Communal yes 14/04/2018 4 2 no no ACTED 12/11/2021 Installed solar system and constructed two kiosk 500m pipelines require change due pipe weakness
7849 Borehole Puntland Ministry of Energy Minerals and Water March 26, 2022 Nugaal garowe Balley 26/03/2022 Baley BH 8.5029119 48.6038657 381.0 1 urban rural yes Yes 5000 1000 500 5000 0.4 102.0 pvc 8.0 0.0 9.0 20.0 3.0 Concrete/Masonry tank 43.0 PVC 1500.0 500 5 0 yes 10 8.0 Submersible Pump Luwara 7.5 80.0 Solar 9.1 fair yes Colorless and odorless 32.2 7.51 3280.0 1635.0 Communal yes 26/03/2018 4 2 no no Community 27/05/2021 1. Installation of solar power Rehabilitation pump and river pipes Fencing around borehole Rehabilitation generator Construction of generator room Construction Animals troughts and koisks
7888 Borehole Puntland Ministry of Energy Minerals and Water March 14, 2022 Mudug galkayo Heema 0.3 ADA 14/03/2004 Heema BH 7.1430376 47.5313058 344.0 1 urban yes Yes 3100 180.0 pvc 8.0 16.0 14.0 2.4 Concrete/Masonry tank 130.0 PVC 1500.0 70 2 2 no Submersible Pump 11.0 162.0 Generator Lesory somer 45.0 good yes Colorless and odorless 31.8 7.85 2645.0 1318.0 Communal yes 15/03/2012 3 2 no no NRC 14/02/2021 1. Construction of new elevated tank 1. Installation of solar power. 2. Panels. 3. Extension of pipelines. 4. Rehabilitation of pump and riser pipes.
8087 Borehole Somaliland MoWRD April 21, 2022 Sanaag ceerigaabo Ceerigabo 5.0 Islamic Relief 21/01/2017 Jidali borehole 10.687386 47.6674573 1377.0 1 rural urban yes Yes 400 115 0 500 10.0 160.0 gi 8.0 55.0 40.0 12.0 20.0 2.0 Concrete/Masonry tank 8.0 Galvanised Steel 1500.0 1 2 3 no Submersible Pump Luwera 20.0 110.0 Generator Parkins 45.0 good 1.effective water supply system conditions. no 26.0 7.9 1260.0 389.0 Communal no no no 0 O
7903 Borehole Puntland Ministry of Energy Minerals and Water April 1, 2022 Sool las_caanood Yeyle British Protectorate 05/04/1954 Eyle shalow well 8.6968279 46.6145572 764.0 1 urban rural yes Yes 3500 1200 400 1800 0.0 15.0 other 4.0 6.0 12.0 2.0 Concrete/Masonry tank 20.0 PVC 1500.0 80 6 2 yes 10 8.0 No Pump fair yes This dug well is open well, easily contaminated, colorness and has some smell, needed water quality testing 29.7 7.6 2540.0 1524.0 Communal yes 4 2 no no 1. Water quality testing 2. Full rehabilitation
8008 Borehole Somaliland MoWRD March 29, 2022 Togdheer buuhoodle Coodanle 1.0 Somaliland MoWRD 14/11/2017 Coodanle borehole 8.33505537360907 46.042332071811 675.0 1 urban rural yes Yes 12000 6000 0 45000 0.0 350.0 pvc 8.0 32.0 8.0 5.0 Concrete/Masonry tank 36.0 PVC 1500.0 2000 9 6 no Submersible Pump Laura 15.0 327.0 Generator JP45 45.0 good The supply system is good and functioning no 36.0 7.0 1666.0 1100.0 Communal yes 24/11/2017 4 2 no no CARE Somalia 10/03/2021 Borehole rehabilitation Currently the generators needs to be changed and also rehabilitation of the solar system is needed.
8039 Borehole Somaliland MoWRD March 30, 2022 Togdheer buuhoodle Dan-Dan 1.0 IR 16/02/2016 Dan Dan Borehole 8.25139459222555 46.5295369829983 649.0 1 rural urban yes Yes 2000 10000 200 15000 0.0 370.0 pvc 8.0 260.0 48.0 10.0 Concrete/Masonry tank 36.0 PVC 1500.0 12000 4 5 yes 10 16.0 Submersible Pump GRoundfors 15.0 280.0 Hybrid - Solar/Generator P50-3000 50.0 The solar isn't functioning 330.0 good The supply system is good however the pipeline of the village needs to change from Galvanized to PVC no 34.0 7.2 1470.0 2300.0 Communal no no no CARE Somalia 30/03/2021 Installation of submersible pump 15KW and cable, Installation of rising pipes, Construction of elevated water tank 25Cubic meters, construction of camel troughs, rehabilitation of goat through and water kiosk, rehabilitation of supply system, supply and installation of solar inverter. Currently the needs of this borehole are supply and installation of solar system which is not functioning, moreover, the pipeline of the village needa to change and install PVC.
8073 Borehole Somaliland MoWRD April 14, 2022 Sool las_caanood Adhicadeeye 0.5 IR 14/04/2017 Adhicaderye borehole 1 8.6727538 47.1509817 623.0 3 rural urban yes Yes 6000 1500 0 3000 0.0 70.0 pvc 8.0 60.0 20.0 9.0 0.0 0.0 Concrete/Masonry tank 60.0 PVC 1500.0 500 1 2 yes 12 9.0 Submersible Pump Luwara 11.0 60.0 Hybrid - Solar/Generator Perkins 50.0 PLM_250P 60 250.0 good The pipelines are very weak and need replacement no 32.0 7.4 1300.0 950.0 Communal no no no Somaliland MoWRD 14/04/2021 Replacement of water pump The generator is not working and need maintenance
8097 Borehole Somaliland MoWRD May 11, 2022 Togdheer burco Guryasammo IDP 2.0 UNICEF 28/11/2019 Guryasamo IDP Borehole 9.36975023243576 45.521302241832 1039.0 1 rural yes Yes 2000 3000 20 30000 60.0 374.0 pvc 8.0 365.0 24.0 5.0 Concrete/Masonry tank 40.0 Galvanised Steel 1500.0 20000 3 3 no Submersible Pump Laware 24.0 325.0 Hybrid - Solar/Generator Perkins 45.0 Lorentz 15.0 good Good Condition no 29.0 7.6 1200.0 779.0 Utility/Local Authority no no 07/10/2021 Supply and installation of submersible pump. Supply and installation of Rising pipe. Pipeline extension 550m Construction of 3 water kiosks Construction of 2 shoat troughs Construction of camel throughs. Solar installation

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors