Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7539 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 16, 2022 | Nugaal | burtinle | Burtinle | 1.5 | — | 16/03/2007 | Ceel weyne burtinle BH | — | 7.6233361 | 47.8358061 | 414.0 | — | 1 | — | urban rural | yes | — | No | Because of generator less than month | 1000 | 800 | — | 1500 | — | — | 375.0 | pvc | 8.0 | — | 18.0 | — | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 26.0 | Galvanised Steel | 50.0 | — | 1 | 1 | yes | — | — | Submersible Pump | Lowara | 15.0 | 332.0 | Generator | Parkins | 45.0 | — | — | poor | Strong rehabilitation needed | no | — | — | — | — | — | — | Private/Individual | — | — | — | — | yes | 0.05 | no | — | — | — | — | — | — | 1. Emergency ( absolutely needed strong rehabilitation). 2. Rehabilitation of generator 3. Rehabilitation of pipes and pump. 4. Fancing. 5. Construction of animal troughts 6. Fuel supporting. 7. Installation of solar power. | — | — |
8737 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 7, 2022 | Mudug | goldogob | Xerojaalle | 0.5 | — | — | Xerojaalle | — | 6.987134 | 47.1766608 | 320.0 | — | 1 | — | rural urban | no | 8 | No | A months, borehole problems | 2500 | — | — | — | 0.0 | — | — | pvc | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | yes | — | — | — | — | — | — | Communal | no | — | — | — | — | — | — | — | — | — | NRC | 07/03/2020 | Construction of elevated water | 1. Emergency 2. Observation of borehole | — | — |
7523 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Ceel boos Goldogob | — | — | 08/03/2017 | Ceel booc BH goldogob | — | 7.0321616 | 47.022893 | 346.0 | — | 11 | — | urban | yes | — | Yes | — | 750 | — | — | — | — | — | 215.0 | pvc | 8.0 | — | 6.7 | 5.0 | — | 4.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 94.0 | Galvanised Steel | 70.0 | — | 1 | 2 | yes | 3 | 8.0 | Submersible Pump | — | 11.0 | 192.0 | Generator | Parkins | 30.0 | — | — | poor | Absolutely poor supply, this supply needs full rehabilitation | yes | Colorless and odorless | 32.1 | 7.54 | 2530.0 | 1251.0 | — | Private/Individual | — | — | — | — | yes | 0.05 | yes | — | — | — | — | — | — | 1. Emergency 2. Installation of solar power 3. Generator rehabilitation 4. Caretaker and Generator rooms rehabilitation 5. Koisks and animal thoughts rehabilitation 6. Fancing. | — | — |
8677 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 28, 2022 | Mudug | jariban | Garacad | 2.8 | Community | 28/10/2021 | Garacad 2 | — | 6.9727697 | 49.2928211 | 2.0 | — | 3 | — | urban | no | 1 | No | The water supply of this borehole still constructing | — | — | — | — | — | — | 43.0 | pvc | 8.0 | — | 10.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Galvanised Steel | — | — | — | — | no | — | — | Surface mounted Pump | — | — | — | Solar | — | — | — | — | poor | Under construction | no | — | — | — | — | — | — | Communal | no | — | — | — | no | — | no | — | — | — | — | — | — | 1. Emergency 2. Installation of generator 3. Fancing borehole | — | — |
7790 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 27, 2022 | Mudug | jariban | Kulub | 12.0 | — | — | Kutub BH | — | 7.1254653 | 49.3484248 | 10.0 | — | 1 | — | rural | yes | — | No | All water system destroyed | — | — | — | — | 0.0 | — | 70.0 | pvc | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 60.0 | — | — | — | — | — | no | — | — | Submersible Pump | — | — | — | Generator | — | — | — | — | poor | All systems disfunction | yes | Colorless and odorless | 29.2 | 7.51 | 6350.0 | 4254.5 | — | Communal | no | — | — | — | no | — | no | — | — | — | — | — | — | 1. Emergency 2. Drilling new borehole 3. Water supply construction | — | — |
7941 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 14, 2022 | Mudug | galkayo | Bacaadweyn | 0.3 | Bacaadweyn water company | 14/03/2019 | Bacaadweyn water company BH 2 | — | 7.1840294 | 47.5360031 | 344.0 | — | 2 | — | urban | yes | — | No | A years, Because of lack of water supply. | — | — | — | — | — | — | 210.0 | pvc | 8.0 | — | 22.0 | — | — | 2.4 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | no | — | — | Submersible Pump | — | 22.0 | 180.0 | — | — | — | — | — | poor | There is no any water supply | no | — | 30.2 | 7.6 | 2261.0 | 1133.0 | — | Utility/Local Authority | — | — | — | — | no | — | no | — | — | — | — | — | — | 1. Emergency 2. Construction of new elevated tank 3. Installation of generator and solar power 4. Extension of pipelines. 5. Construction of caretaker and Generator rooms. | — | — |
7195 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 28, 2022 | Nugaal | garowe | Xamur | 0.5 | UNICEF | 28/03/2018 | Xamur BH | — | 8.7266831 | 48.7464455 | 346.0 | — | 1 | — | urban rural | yes | — | No | Before 5 month, problem of pump and cables | 700 | 1200 | — | 2700 | — | — | 306.0 | pvc | 8.0 | — | 6.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 80.0 | PVC | 700.0 | — | 3 | 2 | no | — | — | Submersible Pump | Lowara | 7.5 | 246.0 | Hybrid - Solar/Generator | Parkins | 30.0 | GPS-300-380 | 12.92 | good | — | no | — | — | — | — | — | — | Communal | yes | 28/03/2018 | 4 | 0 | yes | 0.05 | yes | — | — | — | NRC | 28/02/2021 | 1. Construction of new elevated tank 2. Installation of solar power 4. Extension of pipelines | 1. Emergency 2. Borehole problem not known | — | — |
8397 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 7, 2022 | Mudug | goldogob | Godgaashaan | — | — | 07/03/2019 | Godgaashaan BH | — | 6.978967 | 47.2497849 | 320.0 | — | 1 | — | rural urban | yes | — | No | A months ago, borehole needs observation of the problem stopped. | 1500 | 1200 | — | 1200 | 0.0 | — | 130.0 | pvc | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 36.0 | Other | — | 150 | — | 2 | yes | — | — | Submersible Pump | — | 11.0 | — | Generator | Parkins | 30.0 | — | — | poor | Needs rehabilitation of supplies | no | — | — | — | — | — | — | Communal | no | — | — | — | no | — | — | — | — | — | NRC | 07/03/2021 | 1. Construction of new elevated tank | 1. Emergency 2. Observation of borehole 3. Construction of koisks 4. Construction of generator room and caretaker room | — | — |
7333 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 1, 2022 | Mudug | jariban | Jariiban | 0.0 | WDA | 01/03/1986 | Jariiban BH 2 | — | 7.2139241 | 48.8476088 | 149.0 | — | 3 | — | rural urban | yes | — | Yes | — | 21000 | — | — | — | 0.0 | — | 182.0 | pvc | 8.0 | — | 14.0 | 15.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 24.0 | Galvanised Steel | 200.0 | — | 1 | 2 | yes | 40 | 8.0 | Submersible Pump | Green fos | 11.0 | 126.0 | Generator | Parkins | 45.0 | — | — | poor | This supply needs extension pipelines, new kiosks, and solar power | yes | Colorless and odorless | 27.6 | 7.43 | 1205.0 | 603.0 | — | Communal | yes | 01/03/2016 | 3 | 2 | yes | 0 | yes | — | — | — | CARE Somalia | 01/11/2021 | 1. Construction of elevated water tank 2. Construction Caretaker rooms 3. Pipe rehabilitation | 1. Emergency 2. Installation of solar power 3. Fancing 4. operator support 5. Emergency of supporting of fuel. | — | — |
8305 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 16, 2022 | Nugaal | burtinle | Xaar-xaar | 0.8 | ISRC | 16/03/2018 | Xaar-xaar BH | — | 7.7855921 | 47.9840695 | 475.0 | — | 1 | — | urban rural | no | 2 | Abandoned | Since 2019, by borehole problem and depletion of yield. | 4200 | — | — | — | — | — | 430.0 | pvc | 8.0 | — | — | — | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 36.0 | Galvanised Steel | 2000.0 | — | 5 | 2 | no | — | — | Submersible Pump | Lowara | 18.0 | 335.0 | Hybrid - Solar/Generator | Parkins | 60.0 | Yl_300p-35b | 28.8 | poor | — | no | — | — | — | — | — | — | Communal | yes | 16/03/2017 | 6 | 1 | no | — | no | — | — | — | NRC | 16/03/2021 | 1. Rehabilitation of pump and cables. | 1. Emergency | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France