Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
8144 Borehole Somaliland MoWRD April 11, 2022 Sool las_caanood Dhidinka 0.0 ICRC 11/04/2015 Dhidinka borehole 8.5171179 47.3300951 634.0 2 rural urban yes Yes 320 1000 0 2500 0.0 385.0 pvc 8.0 177.0 16.0 8.0 0.0 0.0 Concrete/Masonry tank 27.0 Galvanised Steel 220.0 160 1 4 yes 35 45.0 Submersible Pump Luwara 15.0 228.0 Hybrid - Solar/Generator Perkins 50.0 Photovoltiac 350.0 good The supply system is good no 31.0 7.7 950.0 680.0 Communal yes 11/04/2019 5 2 no no Oxfam GB 14/11/2021 Solar installed. Pump and cables and fencing also implemented Lack of pump spare and extra water tank for storage and change the pipe that is needs seen in this borehole
7854 Borehole Somaliland MoWRD April 16, 2022 Sool xudun Bohol 1.0 Imaraat 11/02/2011 Bohol bore hole 9.3595923 47.29408 693.0 0 urban rural yes Yes 15000 5000 0 17000 0.0 170.0 gi 8.0 140.0 15.0 7.0 1.0 2.0 Concrete/Masonry tank 170.0 Stainless Steel 200.0 1 1 2 yes 14 12.0 Submersible Pump Luwara 12.0 150.0 Hybrid - Solar/Generator Parking. 60.0 0 0.0 poor 1.poor service 2. Poor water supply syatem. no 42.0 6.9 3200.0 2200.0 Communal no no no Action Afrika Hilfe e.V 16/12/2020 1. Pipe line , pump. Solar installatation. 1.Water rank rehabilitation.
8111 Borehole Somaliland MoWRD April 7, 2022 Sool las_caanood Higlo 1.5 Private 07/04/2015 Geel caseeye 8.5646566 47.6841849 539.0 2 rural yes Yes 0 40 0 0 3.0 65.0 pvc 8.0 40.0 10.0 8.0 0.0 0.0 Concrete/Masonry tank 48.0 Galvanised Steel 100.0 0 0 0 yes 2 8.0 Submersible Pump Luwara 13.0 30.0 Solar Szyl-p300- 36 300.0 good Two solar panels damaged and need to be changed no 32.0 6.8 1150.0 810.0 Communal no no no Oxfam GB 07/04/2019 Constructed water tank of capacity 48 qubic meter Supply system disconnected due to pipes damage and Water cannot go to water tanks. 2 solar panels also not working
8075 Borehole Somaliland MoWRD April 18, 2022 Sanaag ceerigaabo Ceerigabo 1.0 Somalia government 18/04/1972 Cerigabo WD3 10.6304185 47.36284 1785.0 1 urban rural yes Yes 2000 100 70 500 2.0 82.0 gi 8.0 70.0 20.0 12.0 15.0 0.5 Concrete/Masonry tank 25.0 Stainless Steel 1000.0 1 1 1 yes 15 10.0 Submersible Pump Luwara 20.0 25.0 Hybrid - Solar/Generator Parking 45.0 0 0.0 fair 1. Poor water supply syatem no 25.0 7.1 1300.0 120.0 Communal no no no 18/04/2022 1 1
8083 Borehole Somaliland MoWRD April 9, 2022 Sool las_caanood Saahdheer 0.6 NPA 09/04/2014 Saaxdheer borehole 8.0068544 47.1039935 605.0 1 rural urban yes Yes 5000 2100 0 1200 0.0 370.0 pvc 8.0 324.0 12.0 6.0 0.0 0.0 Concrete/Masonry tank 72.0 Galvanised Steel 650.0 20 5 7 yes 30 8.0 Submersible Pump Luwara 45.0 320.0 Hybrid - Solar/Generator Perkins 45.0 BR-M300W 300.0 good All the system are working properly no 31.0 7.4 1260.0 960.0 Communal no no no CARE Somalia 09/05/2020 Construction of generator room. Pipeline extension 2 meters kiosks Construction . Supply of riding pipes and fencing 110 m wires Rehabilitation of water tank that has leakage and fencing the location of the borehole to protect from an authorised personnel.
7855 Borehole Somaliland MoWRD April 12, 2022 Sool las_caanood Gumays 0.2 NRC 12/01/2018 Gumays borehole 1 8.8429653 46.7961158 651.0 2 rural urban yes Yes 8000 500 0 1350 0.0 150.0 pvc 8.0 60.0 4.0 12.0 0.0 0.0 Concrete/Masonry tank 24.0 Galvanised Steel 2000.0 300 3 2 no Submersible Pump Luwara 11.0 110.0 Solar SZYL-M330.36 330.0 good The supply system required maintenance because the pipelines are very weak no 29.0 7.3 3170.0 2200.0 Communal yes 12/04/2019 3 2 no no ADRA 12/04/2020 Water tank construction Require generator, pump and pipelines replacement. It also needs to check whole the system
7874 Borehole Somaliland MoWRD April 24, 2022 Sanaag laasqoray Badhan/Baragaha quled. 1.0 Somalia government 24/04/1986 Baragaha Qoleed 9.5593722 48.4901989 869.0 1 rural urban yes Yes 13000 1100 9700 25000 0.0 110.0 gi 8.0 94.0 16.0 12.0 0.0 0.0 Concrete/Masonry tank 10.0 Galvanised Steel 100.0 0 2 3 yes 31 10.0 Submersible Pump Luwara 16.0 94.0 Generator Parkin 50.0 good Well functioning no 23.0 7.9 2800.0 1400.0 Communal no no no 0 1. New solar pannels Installation 2. Watchman room building 3. Tw bit laterine _ 1
8043 Borehole Somaliland MoWRD April 22, 2022 Sanaag laasqoray Ceel buh 5.0 Somaliland MoWRD Ceel buh borehole 2 10.2212753 48.3119846 1067.0 2 rural urban yes Yes 4800 1500 500 15000 0.0 276.0 gi 8.0 17.0 4.0 12.0 150.0 1.0 Concrete/Masonry tank 12.0 Galvanised Steel 100.0 1 1 3 no Submersible Pump Luwara 7.5 258.0 Generator Parkins 30.0 fair Inadeqauate water supply conditon no 28.0 7.5 1450.0 394.0 Communal no no no 0 1.new bore hole 2 drilling
8024 Dug Well Somaliland MoWRD April 12, 2022 Sool las_caanood Gumays 3.0 Community 11/09/1982 Wadhake 8.8351193 46.833536 647.0 1 rural yes Yes 700 1500 0 8000 1.0 16.0 10.0 6.0 9.0 Concrete/Masonry tank 6.0 Galvanised Steel 140.0 0 1 2 yes 10 9.0 Surface mounted Pump Luwara 6.0 Solar Photovoltiac 300.0 good The system is not working because there is electrical shock pump no 29.0 7.2 1560.0 1000.0 Communal yes 12/04/2019 4 3 no no NRC 12/11/2019 Construction of supply system Solar system is not functioning. Pump is not working due to burning or electrical shock
8183 Borehole Somaliland MoWRD April 19, 2022 Sanaag ceerigaabo Cerigabo 2.5 Kuwait charity 01/04/2015 Laaqiciya 1 bore hole 10.6436818 47.3037278 1875.0 1 rural urban yes Yes 1000 180 400 3000 1.0 172.0 gi 8.0 160.0 1.0 12.0 15.0 1.0 Concrete/Masonry tank 24.0 Stainless Steel 100.0 1 3 3 yes 2 10.0 Submersible Pump Luwara 11.0 45.0 Hybrid - Solar/Generator Parkins 30.0 572350 350.0 good Properly functining well no 32.0 7.7 550.0 843.0 Communal no no no 0 1. New pipline installation 1.5 km to school installation. 2. Increase the depth of borehole 7m.

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors