Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7707 Dug Well FGS Ministry of Energy and Water Resources May 30, 2022 Hiraan beled_weyne Howlwadaag Former Somali Government 23/07/1950 Farah Gedi 4.441 45.1317 urban yes Yes 6000 17.0 10.0 12.0 18.0 Concrete/Masonry tank 12.0 1000 yes fair no 33.0 8.0 2060.0 1040.0 Private/Individual yes 0.01 Full Rehabilitation and supply of new generator
7959 Borehole Somaliland MoWRD May 10, 2022 Togdheer burco Hawdka buroa 2.0 HAVOYOCO 06/09/2011 Ceelka 16aad 9.53380876220763 45.4634217638522 1057.0 3 rural urban yes Yes 1000 0 0 0 15.0 200.0 pvc 8.0 82.0 32.0 4.0 Concrete/Masonry tank 40.0 Galvanised Steel 1000.0 1000 0 0 no Submersible Pump Laware 34.0 150.0 Hybrid - Solar/Generator Perkins 45.0 Lorentz 15.0 good Good Condition no 30.0 8.1 2100.0 843.0 Utility/Local Authority no no New generator
7524 Dug Well Puntland Ministry of Energy Minerals and Water March 29, 2022 Nugaal garowe Rabaable 0.0 Community 29/03/1981 Rabaable dug well 8.2807114 48.2980123 559.0 1 urban yes Yes 1050 30.0 8.0 8.0 8.0 2.0 Concrete/Masonry tank 4.0 PVC 500.0 1 3 0 no Submersible Pump Lowara 4.0 28.0 Solar SZYL-M220-36C 1.5 fair yes Colorless and odorless 31.2 7.8 2470.0 1231.0 Communal yes 29/03/2017 2 5 yes 0.05 no ISRC 29/03/2020 1. Construction of steel tank 1. Rehabilitation of pipelines 2. Extension pipelines 3. Construction of new koisks. 4. Construction of caretaker room.
7547 Dug Well FGS Ministry of Energy and Water Resources March 16, 2022 Middle Shabelle balcad Garas Bintow 2.5 Private 12/10/2002 Farjano 2.2172281 45.3975772 139.0 rural yes Yes 1860 8.0 Concrete/Masonry tank 50.0 Galvanised Steel 50.0 320 1 2 no Submersible Pump Lowara 5.5kw 113.0 Generator Gangfa 115 poor In a good condition no Private/Individual yes 0.05 no IR 14-Mar-14 Construction of animal troughs and communal water point Full Rehabilitation and supply of pump and GI pipes.
4945 DWSNLA003 Dug Well Somaliland_MoWRD Oct. 28, 2019 Sanaag Laasqoray Laasqoray Somaliland MoWRD - Ministry of Water Resources Development 1/24/2016 Laasqoray Dug Well 11.1629 48.1991 4.0 4.288 0 1572271887309.jpg yes No Since June 2019 the pump stop and electric wire cut off 4200 Yes 4.0 1.5 4.0 8.0 1.0 Concrete/Masonry tank PVC 2500.0 4 no Grundfos 5.0 3.0 Submersible Pump 150.0 1000m likage No No No Pump 1.4kw granfoss electric cable 350m extra solar rehabilitation of water tank upvc 1000m rehabilitation of kiosk Strategic Water Sources Survey – WSS_NATl
7529 Dug Well Somaliland MoWRD March 30, 2022 Awdal zeylac caasha caddo 0.25 DRC 30/12/2006 Aasha caddo 11.1747362 43.4406391 4.0 100 urban yes Yes 3500 8.0 4.0 1.5 10.0 1.5 7.0 Concrete/Masonry tank 8.0 PVC 950.0 500 6 2 no Submersible Pump Grundfoz 1.7 7.0 Solar Jt-200 1.2 good The supply is poor becouse the yeid of the dug well is low no 31.4 8.26 1908.0 1270.0 Communal yes 16/07/2016 4 3 yes 0.05 no UNICEF 23/11/2021 Bump replacement Exploration of new boreholes and drilling new boreholes
1296 BHMDHO020 Borehole FGS_MoEWR Sept. 17, 2019 Mudug Hobyo Bitale 50.0 ICRC - International Committee of The Red Cross 14-04-11 Kulmiye 6.634 47.8401 235.0 3799 0 1568702551647.jpg Rural Urban Yes Yes 1500 150 2700 0.3 210.0 PVC 8.0 80.0 12.0 12.0 Concrete/Masonry tank 40.0 Galvanised Steel 1500.0 6000 0 0 Yes 4 10.0 Submersible Pump Franklin 11.0 150.0 Hybrid - Solar/Generator Perkins 63.0 250.0 Good Need kiosks, animal troughs, pipelines and tanks Yes 31.7 7.2 3120.0 1530.0 Communal 17-07-96 6 2 Yes 0.1 Yes IRC - International Rescue Committee Solar system 2017-09-22 New borehole, new generator, full rehabilitation Strategic Water Sources Survey – WSS_NATl
7604 Dug Well Somaliland MoWRD May 9, 2022 Awdal baki Baki 1.0 Bmz 08/02/2016 Baki 2 10.0279884 43.3705481 1011.0 5 urban yes Yes 10000 8.0 4.0 1.0 Concrete/Masonry tank 85.0 PVC 3000.0 700 8 0 no Submersible Pump 2.5 7.0 Solar Dose 8.5 fair This dugwell is connected to the reservoir no 33.0 7.35 834.0 595.0 Communal no yes 0.03 no
4948 DWSNLA006 Dug Well Somaliland_MoWRD Oct. 28, 2019 Sanaag Laasqoray Durduri Community 12/24/1994 DURDURI Dug Well 11.2962 48.5848 5.0 3.216 0 1572252467609.jpg yes Yes 900 Yes 8.0 2.0 4.0 9.0 0.5 Concrete/Masonry tank Galvanised Steel 650.0 5 2 no Grundfos 4.0 7.0 Submersible Pump 150.0 100m of piptline Likages No 28.9 7.7 580.0 452.0 Yes 4/23/1995 7 4 No No ADESO Pump, cable and solar system 2019-06-25 Rehabilitation of water tank excesting pipeline system and extension 250m pipeline construction caretaker room and tiolat Strategic Water Sources Survey – WSS_NATl
7961 Borehole Galmudug Ministry of Energy and Water Resources March 17, 2022 Galgaduud dhusa_marreb Waxaracade 0.15 Community Dhobshac 5.537548 46.3977247 216.0 0 urban yes Yes 12000 130.0 pvc 8.0 93.8 20.0 8.0 Concrete/Masonry tank 80.0 Galvanised Steel 150.0 0 1 1 yes 15 12.0 Submersible Pump Granfos 85.0 Generator Perkin 30.0 fair 1. No water distribution pipeline to the HH. 2. Lack of watch man House 3. Have no fencing 4. 50 meter cubic water tank no 28.8 6.89 2065.0 1032.0 Agency not specified Motor Individual

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors