Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7627 | — | Borehole | Somaliland MoWRD | April 22, 2022 | Woqooyi Galbeed | gebiley | Botor | 0.1 | Khalifa Foundation UAE | 19/05/2007 | Botor borehole 1 | — | 9.6937885 | 43.5147711 | 1518.0 | — | 0 | — | rural urban | yes | — | Yes | — | 1000 | 0 | 100 | 200 | 0.0 | — | 180.0 | gi | 8.0 | 89.0 | 60.0 | 17.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 2000.0 | 143 | 0 | 0 | yes | 6 | 30.0 | Submersible Pump | Grundfos | 30.0 | 168.0 | Generator | Iveco | 265.0 | — | — | good | Condition of supply is fair | no | — | 0.0 | — | — | — | — | Communal | no | — | — | — | yes | 0.0258 | no | — | — | — | — | — | — | — | — | — |
7083 | — | Borehole | FGS Ministry of Energy and Water Resources | April 3, 2022 | Hiraan | jalalaqsi | Horseed | 1.5 | Zam zam | 28/12/2011 | zam zam | — | 3.3755667 | 45.6135903 | 104.0 | — | 2 | — | urban | yes | — | Yes | — | 4550 | — | — | — | — | — | 60.0 | pvc | 10.0 | 1.0 | 20.0 | 12.0 | 1.0 | 1.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | PVC | 1000.0 | 650 | 1 | 256 | yes | 6 | 50.0 | Submersible Pump | Grundfos | 10.0 | 80.0 | Hybrid - Solar/Generator | Penkins | 60.0 | — | 10.0 | poor | Ok | no | — | 0.0 | — | — | — | — | Private/Individual | — | — | — | — | yes | 0.2 | yes | — | — | — | Personal ownar | 30-Dec-11 | Solar sestm | Salar'pomp' Tubo' motor | — | — |
7454 | — | Dug Well | FGS Ministry of Energy and Water Resources | March 29, 2022 | Lower Shabelle | afgooye | Waanjeele | 2.5 | Private | 29/03/2009 | Al furqaan Water supply | — | 2.1530451 | 45.1195002 | 54.0 | — | 4 | — | rural | yes | — | Yes | — | 3415 | 0 | 0 | 0 | 0.0 | — | — | — | — | — | — | — | — | — | 21.0 | 6.0 | 4.0 | 24.0 | 2.0 | 24.0 | — | — | — | — | — | — | — | — | — | — | — | Plastic tank | 3.0 | PVC | 2000.0 | 683 | 0 | 0 | yes | 15 | 5.0 | Submersible Pump | — | 5.0 | 2.0 | Generator | Gacava 115 | 15.0 | — | — | good | Mosques for free, madrasah free | no | — | 0.0 | — | — | — | — | Private/Individual | — | — | — | — | yes | 0.08 | no | — | — | — | Private | 30-Jan-22 | Maintain water tanka, pipeline replacement for 400M | Rehabilitation of water tank, new water tank, new generator, solar system, provide pipeline, construction of two home for the generator | — | — |
8260 | — | Dug Well | Somaliland MoWRD | April 14, 2022 | Woqooyi Galbeed | hargeisa | Dhubato village | 0.3 | UNICEF | 10/08/2008 | Dhubato dug well | — | 9.7403177 | 44.4677289 | 1108.0 | — | 20 | — | urban rural | yes | — | No | Year before becouse of the water depletion. | 4200 | 0 | 0 | 0 | 0.0 | — | — | — | — | — | — | — | — | — | 4.0 | 0.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 45.0 | Galvanised Steel | 300.0 | 600 | 4 | 0 | no | — | — | Submersible Pump | Unknown | 0.0 | 0.0 | Solar | — | — | Dusol | 4.68 | poor | The supply condition is very poor becouse of the dried dug well of the village. | no | — | 0.0 | — | — | — | — | Communal | no | — | — | — | no | — | no | — | — | — | — | — | Rehapilitation | Relocation of the dug well and formation of sand storage dam. | — | — |
8291 | — | Borehole | Galmudug Ministry of Energy and Water Resources | April 13, 2022 | Mudug | hobyo | Gawan | 3.0 | — | — | gawaan 2 | — | 5.3183146 | 48.3285865 | 92.0 | — | 0 | — | rural | no | 3 | Abandoned | it dries out for water shortage | — | — | — | — | — | — | 210.0 | pvc | 6.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Steel tank | 0.0 | Galvanised Steel | 45.0 | 0 | 0 | 0 | — | — | — | No Pump | — | — | — | — | — | — | — | — | poor | — | no | — | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
8271 | — | Dam | Somaliland MoWRD | April 19, 2022 | Woqooyi Galbeed | hargeisa | Bali gubadle | 2.0 | Somaliland MoWRD | — | Bali Gubadle Dam | — | 9.053428 | 44.0096626 | 1270.0 | — | 0 | — | rural | no | 5 | No | Before 2 years | 0 | 0 | 0 | 0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 2.0 | 100.0 | 70.0 | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 25.0 | PVC | 100.0 | 0 | 1 | 5 | no | — | — | No Pump | — | — | — | — | — | — | — | — | poor | No supply system | no | — | 0.0 | — | — | — | — | Communal | no | — | — | — | no | — | no | — | — | — | — | — | — | Re excavation, geomembrane. | — | — |
8263 | — | Borehole | Somaliland MoWRD | April 18, 2022 | Sanaag | ceerigaabo | Cerigabo | 2.0 | Somali government | 18/04/1972 | Cerigabo WD1 | — | 10.6309138 | 47.3626203 | 1784.0 | — | 2 | — | rural urban | no | 0 | Abandoned | 1. Exhausted bore hole | 0 | 0 | 0 | 0 | 0.0 | — | 72.0 | gi | 8.0 | — | 0.0 | 0.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Other | 0.0 | Stainless Steel | 500.0 | 0 | 1 | 0 | no | — | — | Submersible Pump | — | 0.0 | 0.0 | Generator | 0 | 0.0 | — | — | poor | Non functioning water supply | no | — | 0.0 | — | — | — | — | Communal | no | — | — | — | no | — | no | — | — | — | — | 18/06/1972 | 10 | 1.Non funcitional New hore hole drilling | — | — |
8264 | — | Borehole | Somaliland MoWRD | April 18, 2022 | Sanaag | ceerigaabo | Cerigabo | 2.0 | Somali government | 18/04/1972 | Cerigabo WD2 | — | 10.6303465 | 47.3624228 | 1778.0 | — | 2 | — | — | no | 0 | Abandoned | 1. Exhusted wells | 0 | 0 | 0 | 0 | 0.0 | — | 72.0 | gi | 8.0 | — | 0.0 | 0.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 0.0 | Stainless Steel | 400.0 | 0 | 0 | 0 | no | — | — | Submersible Pump | — | 0.0 | 0.0 | Generator | 0 | 0.0 | — | — | poor | Non_ functional and poor water supply condition. | no | — | 0.0 | — | — | — | — | Communal | no | — | — | — | no | — | no | — | — | — | — | 18/04/1972 | 0 | 1.Rehabilatation of water bore hole | — | — |
7015 | — | Dug Well | FGS Ministry of Energy and Water Resources | April 22, 2022 | Lower Shabelle | qoryooley | Wadajir | 0.0 | SWALIM | 22/01/2005 | Celka Haji Salim | — | 1.7825842 | 44.526607 | 31.0 | — | 3 | — | urban | yes | — | Yes | — | 420 | — | — | — | — | — | — | — | — | — | — | — | — | — | 26.0 | 16.0 | 36.0 | 17.0 | 12.0 | — | — | — | — | — | — | — | — | — | — | — | — | Plastic tank | 760.0 | Stainless Steel | 12.0 | 820 | 0 | 340 | no | — | — | No Pump | — | — | — | — | — | — | — | — | good | Is Good | no | — | 0.0 | — | — | — | — | Private-Public-Partnership | — | — | — | — | yes | 1.5 | yes | — | — | — | SWALIM | — | No | No | — | — |
7017 | — | Dug Well | FGS Ministry of Energy and Water Resources | April 19, 2022 | Lower Shabelle | baraawe | Abasiibo | 35.0 | Juba Water Agency | 19/04/2022 | Dug well | — | 1.109428 | 44.0242851 | -18.0 | — | 3 | — | urban | yes | — | Yes | — | 200 | — | — | — | — | — | — | — | — | — | — | — | — | — | 23.0 | 22.0 | 19.0 | 16.0 | 21.0 | 17.0 | — | — | — | — | — | — | — | — | — | — | — | Plastic tank | 20.0 | Stainless Steel | 25.0 | 40 | 35 | 100 | yes | 30 | — | Hand Pump | By hand and pulling the water | 45.0 | — | — | — | — | — | — | poor | Rear to fetch water the people | yes | Blue | 0.0 | — | — | — | — | Private-Public-Partnership | — | — | — | — | yes | 5 | yes | — | — | — | SWALIM | 19-Apr-22 | Good 1 | The interview must be good one | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France