Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
8222 | — | Borehole | Somaliland MoWRD | April 24, 2022 | Sanaag | laasqoray | Badhan/Xingalool | 0.0 | Somalia Government | 24/06/1986 | Xingalool Borehole1 | — | 9.7531588 | 48.3131973 | 868.0 | — | 2 | — | rural urban | no | 0 | No | 1. Lack of pump | 0 | 0 | 0 | 0 | 0.0 | — | 120.0 | gi | 8.0 | — | 0.0 | 0.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 24.0 | Galvanised Steel | 100.0 | 0 | 1 | 2 | no | — | — | Submersible Pump | Luwara | 0.0 | 100.0 | Generator | Parkins | 45.0 | — | — | poor | Poor water conditions supply condition. | no | — | 0.0 | — | — | 944.0 | — | Communal | no | — | — | — | no | — | no | — | — | — | — | — | O | 1. New pump installation 2. Solar pannels installation. 3. Replacement of glass c GI Pipe. | — | — |
8223 | — | Borehole | Somaliland MoWRD | April 10, 2022 | Sool | las_caanood | Bali hadhac | 5.0 | Private | 01/06/2021 | Qorfo borehole | — | 8.4432918 | 46.9122303 | 803.0 | — | 1 | — | rural urban | yes | — | No | The pump is not working | 0 | 0 | 0 | 0 | 0.0 | — | 430.0 | pvc | 8.0 | — | 0.0 | 0.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 32.0 | Galvanised Steel | — | 0 | 0 | 4 | no | — | — | Submersible Pump | Luwara | 18.0 | 0.0 | Generator | Perkin | 60.0 | — | — | good | No supply system working | no | — | — | — | — | 930.0 | — | Communal | no | — | — | — | no | — | no | — | — | — | — | — | — | It requires pump of 22 kwa and pipes. The pump cannot support the system to produce water from borehole | — | — |
8263 | — | Borehole | Somaliland MoWRD | April 18, 2022 | Sanaag | ceerigaabo | Cerigabo | 2.0 | Somali government | 18/04/1972 | Cerigabo WD1 | — | 10.6309138 | 47.3626203 | 1784.0 | — | 2 | — | rural urban | no | 0 | Abandoned | 1. Exhausted bore hole | 0 | 0 | 0 | 0 | 0.0 | — | 72.0 | gi | 8.0 | — | 0.0 | 0.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Other | 0.0 | Stainless Steel | 500.0 | 0 | 1 | 0 | no | — | — | Submersible Pump | — | 0.0 | 0.0 | Generator | 0 | 0.0 | — | — | poor | Non functioning water supply | no | — | 0.0 | — | — | — | — | Communal | no | — | — | — | no | — | no | — | — | — | — | 18/06/1972 | 10 | 1.Non funcitional New hore hole drilling | — | — |
8264 | — | Borehole | Somaliland MoWRD | April 18, 2022 | Sanaag | ceerigaabo | Cerigabo | 2.0 | Somali government | 18/04/1972 | Cerigabo WD2 | — | 10.6303465 | 47.3624228 | 1778.0 | — | 2 | — | — | no | 0 | Abandoned | 1. Exhusted wells | 0 | 0 | 0 | 0 | 0.0 | — | 72.0 | gi | 8.0 | — | 0.0 | 0.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 0.0 | Stainless Steel | 400.0 | 0 | 0 | 0 | no | — | — | Submersible Pump | — | 0.0 | 0.0 | Generator | 0 | 0.0 | — | — | poor | Non_ functional and poor water supply condition. | no | — | 0.0 | — | — | — | — | Communal | no | — | — | — | no | — | no | — | — | — | — | 18/04/1972 | 0 | 1.Rehabilatation of water bore hole | — | — |
8299 | — | Borehole | Somaliland MoWRD | April 24, 2022 | Sanaag | laasqoray | Xingalool | 2.0 | ARC | 24/04/2018 | Xingalool Dam | — | 9.8086839 | 48.3188596 | 896.0 | — | 0 | — | rural urban | no | 0 | Abandoned | 1.plastic removed. | 0 | 0 | 0 | 0 | 0.0 | — | 100.0 | other | 0.0 | — | 0.0 | 0.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Other | 0.0 | — | 0.0 | 0 | 0 | 0 | no | — | — | No Pump | — | — | — | — | — | — | — | — | poor | At current, it is dry no water | no | — | 0.0 | — | — | — | — | Communal | no | — | — | — | no | — | no | — | — | — | — | — | 0 | 1. Geoplastic membrance 2. Water trank. 3. Solar pannel installation. 4. Pump_2.5 kv/groundfos 5. watchman room rehabilitation. | — | — |
8314 | — | Borehole | Somaliland MoWRD | April 14, 2022 | Sool | las_caanood | Canjiid | 1.0 | Diaspora | 20/09/2021 | Canjiid borehole | — | 8.5964443 | 47.2595059 | 634.0 | — | 1 | — | urban rural | yes | — | No | The pump is not functioning and not puming the water. It stopped working one day before we visited the borehole | 1800 | 900 | 0 | 2400 | 0.0 | — | 180.0 | pvc | 8.0 | 160.0 | 20.0 | 8.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 6.0 | Galvanised Steel | 40.0 | 0 | 1 | 2 | yes | 15 | 8.0 | Submersible Pump | Luwara | 11.0 | 140.0 | Solar | — | — | BYD400MIK-36 | 400.0 | good | The supply system is not working and stopped yesterday. One day before field vist. It Needs urgent intervention | no | — | — | — | — | — | — | Communal | no | — | — | — | no | — | no | — | — | — | — | — | — | It is required investigation on the system from the pump to the solar system | — | — |
7080 | — | Borehole | Somaliland MoWRD | April 20, 2022 | Woqooyi Galbeed | hargeisa | Wada makaahiil village | 0.3 | UNICEF | 17/08/2015 | Wada makaahiil borehole | — | 9.3606035 | 43.6109003 | 1414.0 | — | 0 | — | rural urban | yes | — | Yes | — | 300 | 1000 | 4000 | 2000 | 0.0 | — | 263.0 | gi | 8.0 | 234.0 | 8.0 | 6.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 12.6 | Galvanised Steel | 200.0 | 2100 | 1 | 3 | no | — | — | Submersible Pump | Grundfos | 3.0 | 243.0 | Generator | Perkins | 30.0 | — | — | poor | The supply system is poor becouse of the borehole yield | no | — | 30.2 | 7.0 | 2700.0 | 1920.0 | — | Communal | no | — | — | — | yes | 0.12 | yes | — | — | — | — | — | — | Borehole replacement, fencing, solar instalation, rehabilitation of animal troughs. | — | — |
7481 | — | Borehole | Somaliland MoWRD | April 11, 2022 | Woqooyi Galbeed | hargeisa | Geed deeble | 0.2 | HWA | 06/06/2013 | K.7.1 borehole | — | 9.78051 | 43.98694 | — | — | 0 | — | urban | yes | — | Yes | — | 31200 | — | — | — | — | — | 207.0 | gi | 8.0 | 47.0 | 63.0 | 23.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 0.0 | Stainless Steel | 30000.0 | 4457 | 0 | 0 | no | — | — | Submersible Pump | Lawara | 60.0 | 58.0 | Electricity Grid | — | — | — | — | fair | Fair supply system | no | — | 24.0 | 7.34 | 900.0 | 450.0 | — | Communal | no | — | — | — | yes | 0.06 | no | — | — | — | — | — | — | No intervention required | — | — |
7110 | — | Borehole | Somaliland MoWRD | April 21, 2022 | Woqooyi Galbeed | gebiley | Allay baday | 1.0 | Somaliland MoWRD | 19/05/2007 | Dameero boob | — | 9.4068266 | 43.4820338 | 1451.0 | — | 0 | — | rural urban | yes | — | Yes | — | 3500 | 4000 | 200 | 3000 | 3.0 | — | 250.0 | gi | 8.0 | 151.0 | 11.0 | 5.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 84.0 | Galvanised Steel | 200.0 | 350 | 0 | 12 | no | — | — | Submersible Pump | Grundfos | 11.0 | 174.0 | Hybrid - Solar/Generator | Perkins | 45.0 | Dusol | 23.4 | fair | Supply condition is fair | no | — | 29.0 | 6.5 | 2100.0 | 1400.0 | — | Communal | no | — | — | — | yes | 0.06 | yes | — | — | — | — | — | — | Borehole cleaning through pilling system, solar extension, caretaker and machine room rehabilitation. | — | — |
7136 | — | Borehole | Somaliland MoWRD | May 5, 2022 | Sanaag | ceel_afweyn | Kulaal two | 0.5 | UNICEF | 24/11/2018 | Kulaal two Borehole | — | 9.74857759661973 | 47.6493260543793 | 899.0 | — | 1 | — | rural urban | yes | — | Yes | — | 15000 | 8000 | 200 | 30000 | 0.0 | — | 265.0 | gi | 8.0 | 246.0 | 14.0 | 12.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 24.0 | Galvanised Steel | 100.0 | 30000 | 0 | 4 | yes | 8 | 8.0 | Submersible Pump | Grundfos | 15.0 | 245.0 | Hybrid - Solar/Generator | Perkins | 30.0 | Lorentz | 15.0 | good | The system is well functioning | no | — | 32.0 | 7.4 | 2700.0 | 1700.0 | — | Utility/Local Authority | — | — | — | — | yes | 0.01 | yes | — | — | — | Oxfam Novib | 05/12/2020 | Solar system upgrading from 4kw to 11 kw. Solar fencing expansion. | Elevated water tank with capacity 40m3 of water, Motor 60kva, pump change and pipeline, animal throughs expansion currently many livestock depends on this borehole, solar expansion to 30kw and fencing expansion. Change of solar inverter. | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France