Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7052 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 20, 2022 | Nugaal | eyl | Dhiganle | 1.5 | Puntland MoEMW | 20/11/2020 | Dhiganle BH | — | 7.8186471 | 49.4982254 | 225.0 | — | 1 | — | rural urban | yes | — | Yes | — | 18000 | 70000 | — | 25000 | 0.0 | — | 180.0 | pvc | 8.0 | 110.0 | 12.0 | 15.0 | 18.0 | 0.45 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 40.0 | PVC | 150.0 | 700 | 1 | 2 | yes | 12 | 72.0 | Submersible Pump | Lowara | 7.5 | 160.0 | Generator | Parkins | 30.0 | — | — | good | Some of systems are under construction. | yes | Colorless and odorless | 30.5 | 6.45 | 4560.0 | 2240.0 | — | Communal | no | — | — | — | yes | 0.1 | yes | — | — | — | — | — | No previous interventions | 1. Needs Installation of solar. 2. Water supply extensions. 3. Training of Water committees 4. Fancing of borehole areas. 5. Installation of enough capacity pump. | — | — |
7422 | — | Borehole | FGS Ministry of Energy and Water Resources | March 20, 2022 | Gedo | doolow | Ceelasha | 2.0 | NCA | 07/10/2017 | River | — | 3.8031615 | 42.5506041 | 142.0 | — | 2 | — | urban | no | 5 | Yes | — | 600 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 250 | 2 | — | no | — | — | Surface mounted Pump | — | — | — | — | — | — | — | — | fair | Is not properly functional | yes | Smell | — | — | — | — | — | Communal | yes | 21-Mar-22 | 6 | 2 | yes | 0.2 | no | — | — | — | NCA | 14-Oct-14 | Rehabilitation | Reconstruction | — | — |
7053 | — | Borehole | FGS Ministry of Energy and Water Resources | April 3, 2022 | Hiraan | jalalaqsi | Wadajir | 1.0 | Personal ownar | 28/11/2013 | Wadani | — | 3.3693613 | 45.6099823 | 122.0 | — | 1 | — | urban | yes | — | Yes | — | 7000 | — | — | — | — | — | 80.0 | pvc | 10.0 | 10.0 | 20.0 | 0.0 | 1.0 | 1.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | PVC | 1000.0 | 700 | 1 | 1423 | yes | 3 | 10.0 | Submersible Pump | Grundfos | 10.0 | 90.0 | Hybrid - Solar/Generator | 60 | 100.0 | — | 12.0 | good | Ok | no | — | 0.0 | — | — | — | — | Private/Individual | — | — | — | — | yes | 0.2 | yes | — | — | — | ADSOM | 3-Apr-19 | Solar sestem | Pom' solar. Motor. Tubo | — | — |
8334 | — | Borehole | Somaliland MoWRD | May 10, 2022 | Awdal | borama | Borame | — | Osman faarax | 09/05/2018 | Osman farah BH | — | 9.9049656 | 43.164146 | 1526.0 | — | — | — | urban | yes | — | Yes | — | — | — | — | — | — | — | 120.0 | pvc | 8.0 | 80.0 | 10.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 75.0 | PVC | 300.0 | — | 0 | 0 | no | — | — | Submersible Pump | Granfoc | 7.5 | 92.0 | Hybrid - Solar/Generator | Perkin | 45.0 | Aitec | 14.7 | fair | The supply is used for irrigation. | no | — | — | — | — | — | — | Private/Individual | — | — | — | — | no | — | no | — | — | — | — | — | — | — | — | — |
7056 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 23, 2022 | Bari | qardho | Kubo | 1.0 | IDB | 23/05/2004 | Kubo borehole | — | 9.4938824 | 49.0646935 | 728.0 | — | 9 | — | rural urban | yes | — | Yes | — | 6000 | 1000 | — | 4500 | — | — | 350.0 | pvc | 8.0 | 160.0 | 15.0 | 20.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 8.0 | Galvanised Steel | — | 1000 | 1 | 2 | yes | 9 | 10.0 | Submersible Pump | Lawara | — | 196.0 | Hybrid - Solar/Generator | Perkins | 65.0 | SZYL-M330-36 | 25.7 | good | This borehole gives water to the qardho District, so we can't determine number of pipe lines. This borehole and four otherboreholes share 150 meter cubic elevated water tank. | no | — | 34.0 | 6.35 | 2900.0 | 1390.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.026 | yes | — | — | — | DRC - Puntland | 24/05/2020 | Replacement of main raising pipes and submersible pump. | Replacement of main raising pipes and other submersible pump. Construction of wall fencing. | — | — |
7065 | — | Borehole | FGS Ministry of Energy and Water Resources | March 17, 2022 | Hiraan | beled_weyne | Cali ganey | — | Community | 15/01/2010 | Ali ganey | — | 4.6648149 | 45.6002005 | 349.0 | — | 1 | — | rural | yes | — | Yes | — | 15000 | 20000 | 1000 | 30000 | 0.0 | — | 190.0 | pvc | 10.0 | 100.0 | 15.0 | 24.0 | 15.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 45.0 | PVC | 0.0 | 2142 | 2 | 2 | yes | 15 | 15.0 | Submersible Pump | Lowara submersible pump | 10.0 | 90.0 | Generator | Eveka generator pump | 30.0 | — | — | good | Ok | no | — | — | — | — | — | — | Communal | yes | 14-Nov-15 | 5 | 2 | yes | 0.2 | yes | — | — | — | Community | 14-Nov-19 | Rehabilitation | Elevator water tanker and solar system | — | — |
7057 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 23, 2022 | Bari | qardho | Xingood | 0.5 | Kuwait Government | 22/01/2014 | Warshada borehole | — | 9.4960275 | 49.0788282 | 720.0 | — | 9 | — | rural urban | yes | — | Yes | — | 6000 | 700 | — | 3500 | — | — | 281.0 | pvc | 8.0 | 170.0 | 16.0 | 20.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | — | Galvanised Steel | — | 1000 | 1 | — | yes | 8 | 9.0 | Submersible Pump | Lawara | — | 241.0 | Hybrid - Solar/Generator | Perkins | 55.0 | SZYL-M330-36 | 27.7 | good | This borehole suppy water to qardho city, so we can not able to determine the pipe line length. | no | — | 30.0 | 6.5 | 2240.0 | 1120.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.026 | yes | — | — | — | NRC | 03/08/2020 | Replacement of main raising pipes and submersible pump. | Replacement of main raising pipe and submersible pump. Construction of wall fencing. Construction of animal troughs. | — | — |
7078 | — | Borehole | FGS Ministry of Energy and Water Resources | March 22, 2022 | Hiraan | beled_weyne | Coomaad west of mataban | — | Community | 22/03/2022 | Comaad water distribution | — | 5.006258 | 45.472731 | — | — | 1 | — | rural | yes | — | Yes | — | 9500 | 200 | 100 | 6000 | 0.0 | — | 185.0 | pvc | 10.0 | 95.0 | 20.0 | 24.0 | 15.0 | 1.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 30.0 | PVC | 200.0 | 1357 | 1 | 2 | yes | 5 | 50.0 | Submersible Pump | Comoco submersible pump | 8.0 | 90.0 | Generator | Perkins diesel generator | 30.0 | — | — | good | Need solar system | no | — | — | — | — | — | — | Utility/Local Authority | — | — | — | — | yes | 0.1 | yes | — | — | — | Community | 21-Mar-20 | Elevator water tanker rehabilitation | Solar system and general rehabilitation | — | — |
7681 | — | Borehole | FGS Ministry of Energy and Water Resources | April 26, 2022 | Lower Shabelle | afgooye | Elasha | — | GTZ | 14/05/1979 | Elasha biyaha 5 | — | 2.07443 | 45.19667 | — | — | — | — | urban | yes | — | Yes | — | 6400 | — | — | — | — | — | 200.0 | — | — | 25.0 | 36.0 | 24.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 40.0 | — | — | 800 | — | — | — | — | — | Submersible Pump | Elect Submersible pump | — | 175.0 | — | — | — | — | — | fair | — | no | — | — | — | — | — | — | Private/Individual | — | — | — | — | yes | 0.02 | — | — | — | — | UNISOM | 17-Jul-95 | Generator supply | Full Rehabilitation | — | — |
7058 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 23, 2022 | Bari | qardho | Xingood | 0.3 | UNICEF | 23/11/2006 | Xingood borehole | — | 9.4977672 | 49.0827074 | 702.0 | — | 9 | — | rural urban | yes | — | Yes | — | 6000 | 800 | — | 2000 | — | — | 286.0 | pvc | 8.0 | 180.0 | 8.0 | 20.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 16.0 | Galvanised Steel | — | 1000 | 1 | 2 | yes | 10 | 10.0 | Submersible Pump | Lawara | — | 220.0 | Hybrid - Solar/Generator | Perkins | 65.0 | DS572340M | 27.8 | good | This borehole supply water to qardho city, we are not able to determine exact pipe line length. | no | — | 25.0 | 7.5 | 1400.0 | 700.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.026 | yes | — | — | — | IOM | 03/06/2020 | Replacement of main raising pipes. Supplied of generator and submersible pump. | Replecement of main raising pipes and submersible pump. Construction of wall fencing. | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France