Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7166 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 27, 2022 | Bari | qardho | Qodax | 1.5 | Community_ | 27/02/2020 | Qodax borehole | — | 9.6397862 | 49.8325483 | 560.0 | — | 1 | — | rural urban | yes | — | No | 25/12/2021 The pump doesn't work | 2100 | 1500 | — | 5000 | — | — | 320.0 | pvc | 8.0 | 202.0 | 13.0 | 20.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Other | 6.0 | Galvanised Steel | 1000.0 | — | 4 | 2 | yes | 15 | 6.0 | Submersible Pump | Lowara | — | 300.0 | Hybrid - Solar/Generator | Perkins | 45.0 | JCNS-M36V390W | 23.4 | good | — | no | — | — | — | — | — | — | Communal | no | — | — | — | no | — | yes | — | — | — | KAALO Relief and Development | 27/04/2021 | Provision of generator Construction of animal troughs Construction of Solar power installation Construction of kiosks Distribution of water into the village Construction of ground tank which gives water into the village | Construction of elevated water tank Replacement of pump Replacement of main raising pipes Electric cable which connect to the generator and pump Construction of animal troughs Construction of extra solar power installation Construction of toilet and caretaker hause. Cleaning of the solar. | — | — |
7169 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 11, 2022 | Sanaag | ceerigaabo | Ceelbuh | 0.5 | Former Somali Government | 11/05/1980 | Ceelbuh borehole A1 | — | 10.2248119 | 48.3117092 | 1082.0 | — | 5 | — | urban rural | yes | — | No | 20/ 12/ 2021 The problem is pump and main raising pipes. | 6000 | 400 | — | 3000 | — | — | 194.0 | gi | 6.0 | 80.0 | 5.0 | 15.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 18.0 | PVC | — | — | 2 | 2 | yes | 8 | 8.0 | Submersible Pump | Grundfos | — | 192.0 | Generator | Perkins | 30.0 | — | — | poor | The borehole is not functioning. | no | — | — | — | — | — | — | Communal | yes | 26/08/2015 | 3 | 2 | yes | 0.15 | yes | — | — | — | DRC - Puntland | 22/11/2010 | 1: Supplied pump, pipes, and generator 2: Construction of two water kiosks. 3: Construction of generator room. | 1: Amergency replacement of main raising pipes and submersible pump 2: Generator 3: solar 4: Electric cable | — | — |
7863 | — | Dug Well | Somaliland MoWRD | May 5, 2022 | Sanaag | ceel_afweyn | Fadhigaab | 0.1 | UNICEF | 04/07/2016 | Fadhigaab Dug well | — | 9.66848134528846 | 47.0167676266283 | 851.0 | — | 0 | — | rural urban | yes | — | Yes | — | 10000 | 2000 | 50 | 3000 | 0.0 | — | — | — | — | — | — | — | — | — | 20.0 | 18.0 | 7.0 | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 20.0 | Galvanised Steel | 300.0 | 15000 | 4 | 5 | no | — | — | Submersible Pump | Grundfos | 12.0 | 0.0 | Solar | — | — | Lorentz | 15.0 | good | Good Condition | no | — | 27.0 | 7.4 | 3000.0 | 2100.0 | — | Utility/Local Authority | — | — | — | — | no | — | no | — | — | — | Oxfam Novib | 25/12/2020 | Protection cover of the well | This dug well provides water large community and it locates near Erigavo main road so its necessary protection fence, construction of gabion to protect from floods, pipeline system rehabilitation, generator, rehabilitation of kiosks. | — | — |
7867 | — | Dug Well | FGS Ministry of Energy and Water Resources | April 22, 2022 | Bakool | ceel_barde | Celbarde | — | Agency not specified | 01/01/2015 | Biyo Qaboobe SH | — | 4.824053 | 43.658111 | 0.0 | — | 1 | — | — | no | — | Yes | — | 1500 | — | — | — | — | — | — | — | — | — | — | — | — | — | 18.0 | 8.0 | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | fair | — | no | — | — | 7.8 | 2960.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Rehabilitation - Installing hand pump and construction of the shallows mouth | — | — |
7868 | — | Dug Well | Puntland Ministry of Energy Minerals and Water | March 28, 2022 | Nugaal | garowe | Cuun | 0.0 | Community | 28/03/2000 | Cuun dug well | — | 8.8180342 | 48.8915942 | 468.0 | — | 1 | — | urban | yes | — | Yes | — | 1162 | — | — | — | — | — | — | — | — | — | — | — | — | — | 9.0 | 3.0 | 6.0 | 8.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 25.0 | PVC | 600.0 | 0 | 2 | 0 | yes | 2 | 8.0 | Submersible Pump | Lowara | 4.0 | 8.0 | Solar | — | — | — | 5.0 | fair | Some rehabilitation needed | yes | Colorless and odorless | 32.8 | 7.8 | 2920.0 | 1460.0 | — | Communal | no | — | — | — | no | — | no | — | — | — | — | — | — | 1. Rehabilitation of pipelines 2. Construction of koisks 3. Extension of pipelines. | — | — |
7871 | — | Dug Well | FGS Ministry of Energy and Water Resources | April 22, 2022 | Bakool | ceel_barde | Celbarde | — | Agency not specified | 01/01/2013 | Haji shire SH | — | 4.827451 | 43.662817 | 0.0 | — | 4 | — | — | no | — | Yes | — | 4800 | — | — | — | — | — | — | — | — | — | — | — | — | — | 13.0 | 7.0 | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | fair | — | no | — | — | 7.2 | 2850.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Rehabilitation - Installing hand pump and construction of the shallows mouth | — | — |
7872 | — | Dug Well | Somaliland MoWRD | May 8, 2022 | Awdal | lughaye | Tuurka | 0.5 | World Vision | 06/01/2018 | Tuurka dug well | — | 10.283607 | 43.72925 | 362.0 | — | 2 | — | urban | yes | — | Yes | — | 3500 | — | — | — | — | — | — | — | — | — | — | — | — | — | 7.0 | 4.0 | 2.0 | 18.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | Plastic tank | 7.0 | Galvanised Steel | 500.0 | 500 | 3 | 0 | no | — | — | Submersible Pump | — | — | 6.0 | Solar | — | — | Aitec | 2.4 | fair | — | no | — | 34.5 | 7.95 | 2840.0 | 2000.0 | — | Communal | no | — | — | — | no | — | no | — | — | — | — | — | — | Kiosks rehabilitation, solar protection from the flooding. | — | — |
8464 | — | Dug Well | FGS Ministry of Energy and Water Resources | March 22, 2022 | Gedo | baardheere | Aweysufqurun | 2.0 | NCA | 20/12/2018 | River Juba | — | 2.34038 | 42.28032 | — | — | 2 | — | urban | no | 2 | Yes | — | 356 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 4.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 231 | 2 | 0 | no | — | — | No Pump | — | — | — | — | — | — | — | — | fair | Old | yes | Normal | — | — | — | — | — | Communal | yes | 19-Nov-19 | 3 | 2 | no | — | no | — | — | — | NCA | 21-Feb-20 | Rehabilitation | Reconstruction | — | — |
7879 | — | Dug Well | Somaliland MoWRD | April 27, 2022 | Sanaag | ceerigaabo | Rag cadeeye | 1.0 | UNICEF | 29/04/2020 | Rag cadeeye | — | 10.3153273 | 47.3653297 | 1407.0 | — | 0 | — | rural urban | yes | — | Yes | — | 7230 | 981 | 1396 | 1786 | 0.0 | — | — | — | — | — | — | — | — | — | 12.0 | 2.0 | 4.0 | 12.0 | 0.0 | 2.0 | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 16.0 | Galvanised Steel | 200.0 | 0 | 2 | 2 | no | — | — | Submersible Pump | Grund fos 2.5 | 16.0 | 10.0 | Generator | Parkin | 30.0 | — | — | good | Complete well functional water supply system. | no | — | 24.0 | 8.2 | 2700.0 | 1700.0 | — | Communal | no | — | — | — | no | — | no | — | — | — | — | — | 0 | 1. Animal troughs_2 | — | — |
8640 | — | Dug Well | FGS Ministry of Energy and Water Resources | April 19, 2022 | Bay | bur_hakaba | Waberi Bur Hacol | — | Agency not specified | 01/01/2008 | Caliyow Amin | — | 2.795283 | 44.08792 | 0.0 | — | — | — | rural | no | — | Yes | — | 2400 | — | — | — | — | — | — | — | — | — | — | — | — | — | 12.0 | 11.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | fair | — | no | — | — | — | — | — | — | Communal | yes | — | — | — | — | — | — | — | — | — | — | — | — | Improve - Quick rehabilitation (Constructing water troughs) | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France