Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
8512 | — | Dam | Somaliland MoWRD | May 5, 2022 | Awdal | borama | Aasho caddo | — | — | 01/01/2008 | Aasho caddo dam | — | 9.9271756 | 43.1106508 | 1412.0 | — | — | — | rural | no | 6 | Yes | — | 2000 | 1000 | 2000 | 3000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 2.0 | 60.0 | 40.0 | — | — | — | — | — | — | — | — | — | 25.0 | — | — | 30 | 0 | 0 | no | — | — | No Pump | — | — | — | — | — | — | — | — | poor | There is no supply system | no | — | — | — | — | — | — | Communal | no | — | — | — | no | — | no | — | — | — | — | — | — | — | — | — |
8767 | — | Borehole | Somaliland MoWRD | May 6, 2022 | Awdal | borama | Borame | — | Oslo | 04/02/2017 | Oslo | — | 9.9392073 | 43.1825111 | 1454.0 | — | — | — | urban | yes | — | Yes | — | 200 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | no | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
7730 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 5, 2022 | Mudug | galkayo | Galkacayo | — | Private | 05/03/2016 | Galkacayo daryeel BH 2 | — | 6.8166163 | 47.4382128 | 262.0 | — | 20 | — | urban | yes | — | Yes | — | 10000 | — | — | — | — | — | 230.0 | pvc | 8.0 | — | 13.3 | 18.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 160.0 | PVC | 10000.0 | 700 | — | — | no | — | — | Submersible Pump | Lowara | 22.0 | 156.0 | Hybrid - Solar/Generator | — | 160.0 | SS360_72 | 32.76 | good | — | yes | Colorless and odorless | — | — | — | — | — | Utility/Local Authority | — | — | — | — | yes | 0.01 | no | — | — | — | — | — | — | 1. Extension of pipelines | — | — |
8551 | — | Dam | FGS Ministry of Energy and Water Resources | April 24, 2022 | Bakool | waajid | Qaydar | — | Community_ | 13/05/1967 | Qaydar | — | 3.794009 | 43.249611 | — | — | 2 | — | rural | yes | — | Yes | — | 2150 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 300 | — | — | — | — | — | No Pump | — | — | — | — | — | — | — | — | good | — | no | — | — | — | — | — | — | Communal | yes | — | — | — | — | — | — | — | — | — | — | — | — | Development Deepening and Fence and gate | — | — |
8554 | — | Dam | FGS Ministry of Energy and Water Resources | May 17, 2022 | Lower Shabelle | wanla_weyn | Fulayleey | — | Community_ | 12/12/1970 | Hajji Ganley WC | — | 2.625 | 45.02722 | — | — | 7 | — | rural | yes | — | Yes | — | — | 300 | 500 | 1200 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | 8.4 | — | — | 200 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | poor | — | no | — | — | — | — | — | — | Communal | — | — | — | — | no | — | no | — | — | — | — | — | — | Full Rehabilitation | — | — |
8592 | — | Dam | Somaliland MoWRD | May 25, 2022 | Togdheer | burco | Habaasweyne | — | FAO | 24/03/2019 | Habasweyne Earth Dam | — | 9.20659 | 45.11987 | — | — | — | — | rural | yes | — | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 3.0 | 65.0 | 60.0 | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | no | — | — | — | — | — | — | Communal | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
8594 | — | Dam | Somaliland MoWRD | May 25, 2022 | Togdheer | burco | Gatitalay | — | FAO | 21/01/2019 | Gaitalay Earth Dam | — | 9.51847 | 44.86082 | — | — | — | — | rural | no | — | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 3.0 | 95.0 | 12.0 | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | no | — | — | — | — | — | — | Communal | yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
8667 | — | Borehole | FGS Ministry of Energy and Water Resources | April 19, 2022 | Bay | diinsoor | Galooley | — | Community_ | — | Galooly | — | 1.86048 | 42.62587 | 0.0 | — | — | — | rural | yes | — | Yes | — | 3000 | — | — | — | — | — | 70.0 | — | — | 65.0 | 15.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Submersible Pump | — | — | — | Electricity Grid | — | — | — | — | — | — | no | — | — | — | — | — | — | Communal | yes | — | — | — | — | — | — | — | — | — | — | — | — | Full Rehabilitation | — | — |
7528 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 10, 2022 | Mudug | goldogob | Bursalaax | — | CARE Somalia | 10/01/1994 | Bursaalax BH, ceel weyne | — | 7.1802309 | 47.242755 | 355.0 | — | 4 | — | urban | yes | — | Yes | — | 3000 | — | — | — | — | — | 210.0 | gi | 6.0 | — | 17.0 | 15.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 68.0 | PVC | 4000.0 | 350 | 4 | 2 | yes | 9 | 8.0 | Submersible Pump | Lowara | 11.0 | 170.0 | Hybrid - Solar/Generator | Parkins | 20.0 | YL365D-36b | 12.77 | fair | — | yes | Colorless and odorless | 31.6 | 7.6 | 1940.0 | 1299.8 | — | Communal | no | — | — | — | yes | 0.05 | no | — | — | — | IRC | 10/03/2019 | 1. Installation of solar power | 1. Construction of new elevated tank 2. Rehabilitation of generator 3. Fancing. 4. Caretaker rooms construction. 5. Rehabilitation of pump and riser pipes 6. Extension of pipelines. | — | — |
8608 | — | Dam | Somaliland MoWRD | May 24, 2022 | Togdheer | burco | Nasiye | — | FAO | 27/08/2019 | Nasiye Earth Dam | — | 8.75352 | 45.63196 | — | — | — | — | rural | no | 6 | No | For water shoortage due to the effect of droughts | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 3.0 | 60.0 | 60.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | no | — | — | — | — | — | — | Communal | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, AICS, SDC, FCDO and Government of France