Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7799 Berkad FGS Ministry of Energy and Water Resources March 25, 2022 Bakool xudur Madawarabe 5.0 ACF 25/03/2022 Godow barkad 4.1349821 43.9274834 460.0 3 rural no 3 No Due to shortage of last rainy seasons caused 2800 0 0 500 0.0 6.0 10.0 10.0 0 0 0 no No Pump good The barkad is somehow protracted traditionally no 17.0 7.0 5000.0 500.0 Communal yes 7-Jul-19 7 4 no no ACF 24-Jun-19 Construction of barkad and water committees Water infrastructure such as fiencing water tank water kiosk pipeline extention through water point
7012 Borehole FGS Ministry of Energy and Water Resources March 24, 2022 Bakool xudur Shiekh aweys 0.5 ADA 24/03/2022 Shiekh awes borehole 4.119833 43.8939899 472.0 5 urban rural yes Yes 2500 500 250 1500 0.0 142.0 gi 6.0 21.0 6.0 3.0 1.0 2.0 Concrete/Masonry tank 50.0 Stainless Steel 15.0 300 18 3 yes 10 45.0 Submersible Pump Florence 7.5 140.0 Solar 15600.0 good Functioning properly no 15.0 7.0 3000.0 250.0 Private-Public-Partnership yes 0.2 yes ACF 24-Mar-22 Replaced of submersible pupm pvc tube July
8786 Dug Well March 24, 2022 Bakool xudur Bullow 1.0 25/03/2022 Saweeda shallow well 0.0 0.0
8558 Borehole FGS Ministry of Energy and Water Resources April 25, 2022 Bakool xudur Biyoole Biyoole 4.22917 43.56818 rural yes Yes 175.0 130.0 148 poor no Communal Rehabilitation
8215 Dam FGS Ministry of Energy and Water Resources April 25, 2022 Bakool xudur Faajar Community_ 20/10/1975 Faajar 4.19243 43.85064 2 rural yes Yes 1.0 70 fair no 8.4 140.0 Communal Full Rehabilitation
8703 Borehole FGS Ministry of Energy and Water Resources April 25, 2022 Bakool xudur El dhuun waney ADRA El Dhuun Waney 4.229167 43.568182 3 rural yes Yes 70.0 63.0 Submersible Pump poor yes Communal no Full Rehabilitation
8750 Borehole FGS Ministry of Energy and Water Resources April 25, 2022 Bakool xudur Buulo jadiid Former Somali Government 15/07/1982 Bula jadiid 4.1208 43.89644 urban yes Yes 102.0 Submersible Pump fair no Communal no Full Rehabilitation
7014 Dug Well FGS Ministry of Energy and Water Resources March 24, 2022 Bakool xudur Bullow 1.0 IOM 24/03/2022 Eel liifow 4.1239897 43.8929898 463.0 rural urban no 9 No Due to shortage of rainy season the water level went down 2900 280 120 350 0.0 13.0 6.0 4.0 6.0 6.0 1.0 Concrete/Masonry tank 25.0 Stainless Steel 10.0 25 2 2 no Submersible Pump Florence 1.5 12.0 Solar 17280.0 good No bad condition there during distribution time no Private/Individual yes 0.2 yes IOM 24-Mar-22 Constructed of 25 miter cubic water tank installation of solar system and submersible pupm fiencing for protection Back up generator and spare partes/ fuel
8129 Dug Well FGS Ministry of Energy and Water Resources April 25, 2022 Bakool xudur Amaari Former Somali Government 19/05/1957 Amaari 4.11452 43.189218 2 urban yes Yes 15.0 4.4 1200 fair no 7.5 1050.0 Communal no Installation of Solar system, submersible pump and construction of water troughs
8216 Dam FGS Ministry of Energy and Water Resources April 25, 2022 Bakool xudur Madax waraabe TAADO 17/10/2017 Gaduudey 4.13243 43.92656 3 rural yes Yes 63 fair no 8.4 140.0 Communal no Full Rehabilitation

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors