Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7799 | — | Berkad | FGS Ministry of Energy and Water Resources | March 25, 2022 | Bakool | xudur | Madawarabe | 5.0 | ACF | 25/03/2022 | Godow barkad | — | 4.1349821 | 43.9274834 | 460.0 | — | 3 | — | rural | no | 3 | No | Due to shortage of last rainy seasons caused | 2800 | 0 | 0 | 500 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 6.0 | 10.0 | 10.0 | — | — | — | — | — | — | — | — | — | 0 | 0 | 0 | no | — | — | No Pump | — | — | — | — | — | — | — | — | good | The barkad is somehow protracted traditionally | no | — | 17.0 | 7.0 | 5000.0 | 500.0 | — | Communal | yes | 7-Jul-19 | 7 | 4 | no | — | no | — | — | — | ACF | 24-Jun-19 | Construction of barkad and water committees | Water infrastructure such as fiencing water tank water kiosk pipeline extention through water point | — | — |
7012 | — | Borehole | FGS Ministry of Energy and Water Resources | March 24, 2022 | Bakool | xudur | Shiekh aweys | 0.5 | ADA | 24/03/2022 | Shiekh awes borehole | — | 4.119833 | 43.8939899 | 472.0 | — | 5 | — | urban rural | yes | — | Yes | — | 2500 | 500 | 250 | 1500 | 0.0 | — | 142.0 | gi | 6.0 | 21.0 | 6.0 | 3.0 | 1.0 | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | Stainless Steel | 15.0 | 300 | 18 | 3 | yes | 10 | 45.0 | Submersible Pump | Florence | 7.5 | 140.0 | Solar | — | — | — | 15600.0 | good | Functioning properly | no | — | 15.0 | 7.0 | 3000.0 | 250.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.2 | yes | — | — | — | ACF | 24-Mar-22 | Replaced of submersible pupm pvc tube | July | — | — |
8786 | — | Dug Well | — | March 24, 2022 | Bakool | xudur | Bullow | 1.0 | — | 25/03/2022 | Saweeda shallow well | — | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
8558 | — | Borehole | FGS Ministry of Energy and Water Resources | April 25, 2022 | Bakool | xudur | Biyoole | — | — | — | Biyoole | — | 4.22917 | 43.56818 | — | — | — | — | rural | yes | — | Yes | — | — | — | — | — | — | — | 175.0 | — | — | 130.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 148 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | poor | — | no | — | — | — | — | — | — | Communal | — | — | — | — | — | — | — | — | — | — | — | — | — | Rehabilitation | — | — |
8215 | — | Dam | FGS Ministry of Energy and Water Resources | April 25, 2022 | Bakool | xudur | Faajar | — | Community_ | 20/10/1975 | Faajar | — | 4.19243 | 43.85064 | — | — | 2 | — | rural | yes | — | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 1.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 70 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | fair | — | no | — | — | 8.4 | 140.0 | — | — | Communal | — | — | — | — | — | — | — | — | — | — | — | — | — | Full Rehabilitation | — | — |
8703 | — | Borehole | FGS Ministry of Energy and Water Resources | April 25, 2022 | Bakool | xudur | El dhuun waney | — | ADRA | — | El Dhuun Waney | — | 4.229167 | 43.568182 | — | — | 3 | — | rural | yes | — | Yes | — | — | — | — | — | — | — | 70.0 | — | — | 63.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Submersible Pump | — | — | — | — | — | — | — | — | poor | — | yes | — | — | — | — | — | — | Communal | no | — | — | — | — | — | — | — | — | — | — | — | — | Full Rehabilitation | — | — |
8750 | — | Borehole | FGS Ministry of Energy and Water Resources | April 25, 2022 | Bakool | xudur | Buulo jadiid | — | Former Somali Government | 15/07/1982 | Bula jadiid | — | 4.1208 | 43.89644 | — | — | — | — | urban | yes | — | Yes | — | — | — | — | — | — | — | 102.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Submersible Pump | — | — | — | — | — | — | — | — | fair | — | no | — | — | — | — | — | — | Communal | no | — | — | — | — | — | — | — | — | — | — | — | — | Full Rehabilitation | — | — |
7014 | — | Dug Well | FGS Ministry of Energy and Water Resources | March 24, 2022 | Bakool | xudur | Bullow | 1.0 | IOM | 24/03/2022 | Eel liifow | — | 4.1239897 | 43.8929898 | 463.0 | — | — | — | rural urban | no | 9 | No | Due to shortage of rainy season the water level went down | 2900 | 280 | 120 | 350 | 0.0 | — | — | — | — | — | — | — | — | — | 13.0 | 6.0 | 4.0 | 6.0 | 6.0 | 1.0 | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 25.0 | Stainless Steel | 10.0 | 25 | 2 | 2 | no | — | — | Submersible Pump | Florence | 1.5 | 12.0 | Solar | — | — | — | 17280.0 | good | No bad condition there during distribution time | no | — | — | — | — | — | — | Private/Individual | — | — | — | — | yes | 0.2 | yes | — | — | — | IOM | 24-Mar-22 | Constructed of 25 miter cubic water tank installation of solar system and submersible pupm fiencing for protection | Back up generator and spare partes/ fuel | — | — |
8129 | — | Dug Well | FGS Ministry of Energy and Water Resources | April 25, 2022 | Bakool | xudur | Amaari | — | Former Somali Government | 19/05/1957 | Amaari | — | 4.11452 | 43.189218 | — | — | 2 | — | urban | yes | — | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 15.0 | 4.4 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 1200 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | fair | — | no | — | — | 7.5 | 1050.0 | — | — | Communal | no | — | — | — | — | — | — | — | — | — | — | — | — | Installation of Solar system, submersible pump and construction of water troughs | — | — |
8216 | — | Dam | FGS Ministry of Energy and Water Resources | April 25, 2022 | Bakool | xudur | Madax waraabe | — | TAADO | 17/10/2017 | Gaduudey | — | 4.13243 | 43.92656 | — | — | 3 | — | rural | yes | — | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 63 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | fair | — | no | — | — | 8.4 | 140.0 | — | — | Communal | no | — | — | — | — | — | — | — | — | — | — | — | — | Full Rehabilitation | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France