Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7515 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 14, 2022 | Mudug | galkayo | Ceelgerdi 2 | — | Community | 14/03/2014 | Ceelgerdi BH 2 | — | 7.2318127 | 47.5488879 | 344.0 | — | 1 | — | rural | yes | — | Yes | — | 350 | 500 | — | 1500 | 4.0 | — | 190.0 | pvc | 8.0 | 135.0 | 13.3 | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 16.0 | Galvanised Steel | 700.0 | 7 | 0 | 2 | yes | 7 | 8.0 | Submersible Pump | Lowara | 11.0 | 145.0 | Generator | Parkins | 45.0 | — | — | fair | Supply needs rehabilitation | yes | Colorless and odorless | 34.1 | 7.81 | 3110.0 | 1550.0 | — | Communal | yes | 14/03/2017 | 2 | 1 | yes | 0.05 | no | — | — | — | — | — | — | 1. Construction of koisks 2. Construction of new elevated tank 3. Installation of solar power 4. Rehabilitation of pump and riser pipes | — | — |
7677 | — | Borehole | FGS Ministry of Energy and Water Resources | April 26, 2022 | Lower Shabelle | afgooye | Elasha | — | GTZ | 15/05/1979 | Elasha biyaha 16 | — | 2.06861 | 45.19313 | — | — | — | — | urban | yes | — | Yes | — | 7200 | — | — | — | — | — | 200.0 | — | — | 25.0 | 36.0 | 24.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 30.0 | — | — | 800 | — | — | — | — | — | Submersible Pump | Elect Submersible pump | — | 175.0 | — | — | — | — | — | fair | — | no | — | — | — | — | — | — | Private/Individual | — | — | — | — | yes | 0.02 | — | — | — | — | — | — | — | Full Rehabilitation | — | — |
7516 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 14, 2022 | Mudug | galkayo | Bacaadweyn | 0.8 | Community | 14/03/2022 | Bacaadweyn water company BH | — | 7.21072 | 47.5212386 | 349.0 | — | 2 | — | rural urban | yes | — | Yes | — | 21000 | 800 | — | 1200 | — | — | 235.0 | pvc | 8.0 | 125.0 | 22.0 | 18.0 | — | 1.3 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 250.0 | PVC | 4000.0 | 1800 | 5 | 2 | yes | 25 | 8.0 | Submersible Pump | — | 22.0 | 171.0 | Hybrid - Solar/Generator | Parkins | 60.0 | BYD335PK-36 | 33.5 | good | — | yes | Colorless and odorless | 29.2 | 7.81 | 2895.0 | 1435.0 | — | Utility/Local Authority | — | — | — | — | yes | 0.05 | no | — | — | — | DRC | 14/03/2020 | 1. Installation of solar power. | 1. Installation of generator 2. Extension pipelines 3. Rehabilitation of pipes 4. Rehabilitation of steel tank, because its corrosive. | — | — |
7517 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 27, 2022 | Nugaal | garowe | Garowe | 1.5 | NUWACO Water Company | 27/03/2019 | Ligle BH 2 | — | 8.3643642 | 48.4499869 | 436.0 | — | 4 | — | urban | yes | — | Yes | — | 9100 | — | — | — | — | — | 160.0 | pvc | 8.0 | 11.0 | 40.0 | 24.0 | — | 1.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | PVC | 10000.0 | 1300 | 0 | 0 | no | — | — | Submersible Pump | Lowara | 18.5 | 60.0 | Generator | Parkins | 150.0 | — | — | good | — | yes | Colorless and odorless | 32.0 | 7.4 | 2875.0 | 1435.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | no | — | — | — | — | — | — | — | — | — |
7518 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 15, 2022 | Mudug | galkayo | Xarfo | — | WDA | 15/03/1986 | Xarfo BH 1 | — | 7.3554649 | 47.6261302 | 382.0 | — | 4 | — | urban rural | yes | — | Yes | — | 6300 | 950 | — | 2000 | 0.0 | — | 196.0 | pvc | 8.0 | 45.0 | 12.0 | 20.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 140.0 | PVC | 4000.0 | 900 | 1 | 4 | yes | 40 | 8.0 | Submersible Pump | Lowara | 15.0 | 165.0 | Hybrid - Solar/Generator | Parkins | 45.0 | JY400M72-H | 24.0 | fair | — | yes | Colorless and odorless | 32.8 | 7.28 | 2845.0 | 1435.0 | — | Utility/Local Authority | — | — | — | — | yes | 0.05 | no | — | — | — | — | — | — | 1. Rehabilitation of generator 2. Construction of koisks 3. Extension pipelines | — | — |
7519 | — | Borehole | Somaliland MoWRD | March 29, 2022 | Awdal | zeylac | Zaylac borehole | 12.0 | International Fund for Agricultural Development | 15/09/2013 | Zeylac borehole | — | 11.32589 | 43.37519 | — | — | — | — | urban rural | yes | — | Yes | — | 10000 | 2500 | 0 | 10000 | 0.0 | — | 39.0 | pvc | 8.0 | 13.0 | 5.0 | 20.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 104.0 | Other | 1400.0 | 220 | 4 | 3 | yes | 4 | 9.0 | Submersible Pump | Granfoz | 3.7 | 29.0 | Hybrid - Solar/Generator | Perkins | 40.0 | S10 spp | 5250.0 | fair | The water supply system operates whole the year around starting from the espalishment up to now. | no | — | 37.2 | 7.5 | 2800.0 | 1960.0 | — | Private/Individual | — | — | — | — | yes | 0.05 | no | — | — | — | Safe the childreen international (SCI) | 29/03/2022 | Contruction of rcc tank, and generator room. | Provision of 11 KW submersible pump, and replacement of solar panels. | — | — |
7587 | — | Borehole | Somaliland MoWRD | April 11, 2022 | Woqooyi Galbeed | hargeisa | Geed deeble | 0.1 | China | 28/06/1970 | K5 borehole | — | 9.7644345 | 43.9878784 | 1083.0 | — | 0 | — | urban | yes | — | Yes | — | 31200 | — | — | — | — | — | 65.5 | gi | 8.0 | 44.0 | 45.0 | 23.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | — | Stainless Steel | 30000.0 | 4457 | 0 | 0 | no | — | — | Submersible Pump | Lawara | 45.0 | 72.0 | Generator | — | — | — | — | fair | The condition of the supply system is fair | no | — | 32.4 | 7.07 | 1260.0 | 630.0 | — | Communal | no | — | — | — | yes | 0.04 | no | — | — | — | — | — | — | No intervention required | — | — |
8411 | — | Dam | Somaliland MoWRD | May 23, 2022 | Togdheer | burco | Boodhlay | — | FAO | 22/03/2019 | Boodhlay Earth Dam | — | 8.91665 | 45.30411 | — | — | — | — | rural | no | 10 | Yes | — | — | — | — | — | 1.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 4.0 | 65.0 | 55.0 | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 10.0 | PVC | 100.0 | — | — | — | — | — | — | Surface mounted Pump | — | 1.3 | — | Generator | — | — | — | — | — | — | no | — | — | — | — | — | — | Communal | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
7521 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Goldogob | — | WDA | 08/03/1943 | Ceel ciilde BH goldogob | — | 7.031098 | 47.020472 | 346.0 | — | 11 | — | urban rural | yes | — | Yes | — | 2100 | — | — | — | — | — | 200.0 | gi | 8.0 | — | 3.7 | 13.0 | — | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 64.0 | Galvanised Steel | 4000.0 | 300 | 2 | 2 | yes | 9 | 8.0 | Submersible Pump | Grand foss | 11.0 | 124.0 | Generator | Parkins | 45.0 | — | — | poor | Needs full rehabilitation | yes | Colorless and odorless | 32.5 | 7.42 | 2556.0 | 1261.0 | — | Utility/Local Authority | — | — | — | — | yes | 0.05 | yes | — | — | — | CARE Somalia | 08/02/2021 | 1. Construction of new elevated tank tank | 1. New driling borehole 2. Installation of solar power. 4. Rehabilitation of koisks and animal thoughts 5. Construction of caretaker and Generator rooms | — | — |
7530 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Goldogob | — | — | 11/03/2019 | Goldogob water company BH 6 | — | 7.0428029 | 47.0339146 | 346.0 | — | 11 | — | urban | yes | — | Yes | — | 8000 | — | — | — | — | — | 240.0 | pvc | 8.0 | 140.0 | 18.0 | 15.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 200.0 | PVC | 2786.0 | 2500 | — | — | no | — | — | Submersible Pump | Grandfoss | 15.0 | 168.0 | Generator | Parkins | 45.0 | — | — | — | — | yes | Colorless and odorless | 30.7 | 7.67 | 1821.0 | 913.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | no | — | — | — | — | — | — | 1. Construction of new elevated tank. | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France