Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7155 Borehole Puntland Ministry of Energy Minerals and Water April 1, 2022 Togdheer buuhoodle Buuhoodle 0.0 Community 01/04/2012 Farah Bulley BH 2 8.2213759 46.3526494 631.0 2 urban rural yes Yes 2100 2000 250 5200 0.0 374.0 pvc 8.0 8.0 20.0 4.0 Concrete/Masonry tank 92.0 PVC 4500.0 220 8 3 yes 12 8.0 Submersible Pump Lowara 18.5 330.0 Hybrid - Solar/Generator Parkins 65.0 SZYL-M330-36 23.1 fair yes Colorless and odorless 32.6 8.15 3980.0 2388.0 Communal yes 01/04/2012 3 2 yes 0.1 yes PWDA 01/01/2022 1. Rehabilitation of pump 1. Installation of submersible pump 22 kW and cables 2. Rehabilitation of riser pipes 3. Extension pipelines 4. Extension and installation extra solar power. 5. Construction of generator room 6. Fancing
7119 Borehole Somaliland MoWRD March 31, 2022 Togdheer buuhoodle Goljano 3.0 Somaliland MoWRD 31/03/2022 Goljano borehole 8.6325231 46.5708954 778.0 1 rural yes Yes 72000 300 100 10000 0.0 350.0 pvc 8.0 150.0 5.0 12.0 Concrete/Masonry tank 34.0 Galvanised Steel 35.0 1200 0 4 yes 9 9.0 Submersible Pump 7.0 15.0 Hybrid - Solar/Generator Lens Italy 60.0 Photovoltiac 415.0 good The supply system is automatically functioning simultaneously but the system did not installed to the village no 35.0 7.5 900.0 5600.0 Communal yes 01/06/2021 3 2 no yes NRC 01/01/2022 Constructed Water Reservior and installation Fence and installing water supply system to the village and caretaker room
7156 Borehole Somaliland MoWRD March 31, 2022 Togdheer buuhoodle Qabri Hulul 0.2 IR 01/01/2016 Qabri Hull borehole 8.685275 46.2782063 832.0 1 rural yes Yes 2400 400 0 2800 0.0 333.0 pvc 8.0 270.0 15.0 2.0 Concrete/Masonry tank 40.0 Galvanised Steel 25.0 400 1 8 yes 4 8.0 Submersible Pump Luara 15.0 300.0 Hybrid - Solar/Generator JP45 45.0 GPM300 300.0 good The condition of the solar system and has spare parts no 36.0 7.3 1000.0 394.0 Communal no no yes IR 01/02/2016 Construction of new borehole Rehabilitation of reservoirs and animal trough installation
7172 Borehole Puntland Ministry of Energy Minerals and Water March 1, 2022 Mudug jariban Jariiban 0.0 WDA 01/03/1986 Seemade BH 1 7.1558815 48.6113718 186.0 2 rural urban yes Yes 3500 5000 0 10000 0.0 200.0 pvc 8.0 14.0 12.0 2.0 Concrete/Masonry tank 28.0 Galvanised Steel 250.0 1 2 yes 5 8.0 Submersible Pump 15.0 180.0 Hybrid - Solar/Generator Parkins 32.0 340Wp 15.0 fair The koisks of this water supply needs rehabilitation yes Colorless and odorless 31.5 7.26 5460.0 2670.0 Communal yes 01/03/1990 3 1 yes 0.05 yes Agency not specified 01/02/2017 Construction of elevated water tank 1. Construction of new elevated tank. 2. Construction of new kiosks. 3. Rehabilitation and reconstruction of animal thoughts. 4. Construction of new generator room 5. Extension and rehabilitation of pipelines.
7216 Borehole Puntland Ministry of Energy Minerals and Water April 9, 2022 Sanaag laasqoray Cawsane 8.0 IR 01/01/2017 Cawsane borehole 10.6342557 48.7897314 772.0 1 rural urban yes Yes 3000 2000 7000 205.0 pvc 8.0 145.0 10.0 17.0 Concrete/Masonry tank 50.0 Stainless Steel 8000.0 7 3 3 yes 12 9.0 Submersible Pump Luwara 153.0 Hybrid - Solar/Generator Perkins 40.0 BR-M250W 17.0 fair no 32.1 7.6 2150.0 1077.0 Communal yes 01/01/2018 3 2 no yes NRC 01/02/2022 Replacement of main raising pipes and the cable 1: Pipelines are leaking. 2: Generator room's Roof Rehabilitation. 3: Construction of store room. 4: They need some kind of intervention about the Increased fuel prices. 5: Amergency construction of another borehole due to water demand. 6: Solar power storage( battery)
7201 Borehole Puntland Ministry of Energy Minerals and Water March 21, 2022 Bari iskushuban Timirshe 0.15 Community_ 21/05/2000 Timirshe borehole 2 10.5613413 50.4252462 270.0 2 rural urban yes Yes 480 200 400 84.0 pvc 8.0 40.0 3.0 12.0 Concrete/Masonry tank 40.0 Galvanised Steel 20 6 3 yes 3 6.0 Submersible Pump Lowara 63.0 Solar fair Yield is low. no 31.0 7.7 1732.0 860.0 Communal yes 21/07/2015 4 3 yes 0.03 yes CARE Somalia 01/02/2022 Replacement of main raising pipes and submersible pump 1: Generator 2: Rehabilitation of solar power system.
8047 Borehole Somaliland MoWRD April 1, 2022 Sool caynabo Wadaamogoo 0.5 IR 01/01/2016 Wadaamogoo borehole1 8.9309789 46.2668218 799.0 4 rural urban yes Yes 5000 3000 800 15000 5.0 150.0 pvc 140.0 10.0 12.0 0.0 0.0 Concrete/Masonry tank 16.0 Galvanised Steel 700.0 1000 4 16 yes 3 50.0 Submersible Pump Laura 12.0 48.0 Hybrid - Solar/Generator PERKINS 45.0 Yingu solar 315.0 good The supply system is very good and functional no 36.0 7.4 1410.0 990.0 Communal no no no Somaliland MoWRD 01/02/2022 Changed the installation of pipes to new pipes in the system Pump is old and reduced water yield production so it needs to change it
7276 Spring Puntland Ministry of Energy Minerals and Water March 1, 2022 Bari bandar_beyla Falfalax 1.0 Natural spring. Falfax spring 8.7729069 50.3993004 19.0 1 rural urban yes No 2018, hayaan cyclone 1200 150 2000 0.5 9.0 Concrete/Masonry tank 22.0 Stainless Steel 1500.0 2 2 yes 5 8.0 Submersible Pump Lawara Generator Chinese generator 37.0 poor The supply system is broken and also the pipes has a rest, and the spring's catchment is totally being destroyed by the cyclone. no 31.0 7.3 2400.0 1300.0 Communal yes 01/02/2012 2 1 yes 0.05 yes Muslim Aid 01/03/2016 They made 2kiosks, 2 animal troughs and the elevated water tank. 1: Solar power installation 2: Provision of pump 3: Placement of of all distribution pipes. 4: Rehabilitation of kiosks 5: Rehabilation of elevated water tank in order to stop water leaking. 6: Rehabilitation of animal troughs.
7243 Borehole Puntland Ministry of Energy Minerals and Water March 1, 2022 Mudug jariban Jariiban 0.0 WDA 01/03/1986 Jariiban BH 1 7.2187338 48.8492715 150.0 3 rural urban yes Yes 21000 2000 200 5000 0.0 145.0 pvc 8.0 75.0 9.5 19.0 2.3 Concrete/Masonry tank 22.0 Galvanised Steel 500.0 5 2 yes 30 12.0 Submersible Pump 15.0 125.0 Hybrid - Solar/Generator Parkins 45.0 fair Needs rehabilitation of kiosks yes Colorless and odorless 29.3 7.61 4610.0 2270.0 Utility/Local Authority yes 0.05 yes World Vision 01/03/2016 Construction of elevated water tank 1. Rehabilitation and reconstruction of ground water tank. 2. Construction of new kiosks 4. Rehabilitation of animal thoughts. 5. Rehabilitation and extension of pipelines.
7251 Spring Puntland Ministry of Energy Minerals and Water March 1, 2022 Bari bandar_beyla Dhalinbaar 1.0 Other Dharinbaar spring 8.9321246 50.4732425 -5.0 1 rural urban yes Yes 1200 800 3000 3.0 Concrete/Masonry tank 28.0 Galvanised Steel 1000.0 1 8 1 yes 5 5.0 Submersible Pump Lowara Generator Perkins 45.0 poor The yield of the spring is very low, it needs rehabilitation in order to increase its yield no 27.0 7.0 3000.0 1500.0 Communal no no yes Puntland MoEMW 01/03/2019 Supplied of electric cable Replecement of pump Replacement of electric cable which acess generator Construction of animal troughs Installation of solar power system. Replacement of all rusted distribution pipe lines Rehabilitation of elevated water tank in order to stop water leaking.

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors