Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1719 | BHSNCR088 | Borehole | SWALIM_WSIS | June 3, 2008 | Sanaag | Ceerigaabo | Xingagool | — | — | — | Baraagaha Qol | — | 9.5657 | 48.4948 | 893.0 | — | — | — | Urban | No | — | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 8.0 | — | 150.0 | — | — | — | — | — | — | — | Grundfos | — | — | — | — | — | — | — | — | — | — | — | — | 8.5 | 3999.0 | — | — | Community | — | — | — | — | — | — | — | — | — | — | — | — | — | Develop | Requires: - Mainrainance of storage tank - Replacement Delevary pipline and risers - Repair of tankering point - maintainance oftje electrical for the spair machine | Water Sources Inventory Survey – WSIS |
1708 | BHSNCR080 | Borehole | Puntland_PSAWEN | Dec. 28, 2013 | Sanaag | Ceerigaabo | Xingalol | — | Kuwait Government | 01-11-13 | Xingalol BH3 | — | 9.7621 | 48.3103 | 909.0 | — | — | — | Rural Urban | Yes | — | Yes | — | 1000 | 1000 | 100 | 5000 | — | — | 90.0 | — | — | 70.0 | 18.0 | 4.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Submersible Pump | Lowara 5.5kW | — | 84.0 | — | — | — | — | — | — | — | — | — | — | 7.7 | 5560.0 | 3400.0 | — | Public | — | — | — | — | — | 0.05 | — | 0.25 | — | — | — | — | — | Standpipe, and mainpipe | — | Strategic Boreholes Survey – BHS |
7202 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 12, 2022 | Sanaag | ceerigaabo | Xingalool | 0.9 | IR | 09/06/2003 | Xingalool borehole 2 | — | 9.755695 | 48.3143046 | 885.0 | — | 3 | — | rural urban | yes | — | Yes | — | 3000 | 500 | — | 3000 | — | — | 120.0 | pvc | 8.0 | 66.0 | 3.0 | 17.0 | — | 0.5 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 24.0 | Galvanised Steel | — | — | — | 3 | yes | 10 | 8.0 | — | — | — | — | — | — | — | — | — | fair | The yield is low Distribution pipes are rusted. | no | — | 32.2 | 7.1 | 3720.0 | 1873.0 | — | Communal | yes | 16/08/2004 | 3 | 2 | yes | 0.025 | yes | — | — | — | CARE Somalia | 13/06/2020 | Generator Construction of generator room | 1: Amergency replacement of main raising pipes and submersible pump. 2: Generator 3: Rehabilitation of animal water troughs 4: Construction of another elevated water tank. 5: Fencing 6: training borehole workers 7: Construction of another borehole due to water demand 8: Solar power storage ( battery) | — | — |
7206 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 12, 2022 | Sanaag | ceerigaabo | Xingalool | 0.5 | Former Somali Government | 16/10/1986 | Xingalool borehole 1 | — | 9.753105 | 48.3131151 | 880.0 | — | 3 | — | rural urban | yes | — | No | 20/ feb/2021 The reason is pump has burned. | 6000 | 500 | — | 1500 | — | — | 120.0 | gi | 8.0 | 65.0 | 12.0 | 20.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 24.0 | — | — | — | — | 2 | yes | 6 | 8.0 | — | — | — | — | — | — | — | — | — | — | — | no | — | — | — | — | — | — | Communal | yes | 26/08/2019 | 1 | 4 | yes | 0.015 | yes | — | — | — | CARE Somalia | 26/10/2019 | Amergency replacement of main raising pipes and submersible pump. Construction of storage room. Construction of elevated water tank. | 1: Amergency replacement of main raising pipes and submersible pump. 2: Construction of another animal water troughs which is located out of city. 3: Construction of caretaker room. 4: Generator. | — | — |
7845 | — | Borehole | Somaliland MoWRD | April 24, 2022 | Sanaag | laasqoray | Xingalool | 1.0 | Community | 27/04/2017 | Xingalool Borehole3 | — | 9.762126 | 48.3102667 | 886.0 | — | 1 | — | rural urban | yes | — | Yes | — | 18000 | 13500 | 4500 | 17500 | 0.0 | — | 120.0 | gi | 8.0 | — | 12.0 | 12.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 18.0 | Galvanised Steel | 100.0 | 0 | 2 | 3 | yes | 7 | 12.0 | Submersible Pump | Luwara | 12.0 | 110.0 | Hybrid - Solar/Generator | Parkin | 30.0 | Helios | 325.0 | good | Well functioning conditions of water supy system. | no | — | 30.0 | 7.2 | 3400.0 | 1400.0 | — | Communal | no | — | — | — | no | — | no | — | — | — | — | — | 0 | 1. New generator and pump | — | — |
1711 | BHSNCR082 | Borehole | Somaliland_MoWRD | Oct. 22, 2019 | Sanaag | Ceerigaabo | Xingalool | 0.4 | Manhal kuwait | 22-05-03 | Xingalool BH2 | — | 9.7557 | 48.3144 | 911.0 | 4.3 | 0 | 1571730527497.jpg | Urban | No | 8 | Yes | — | — | — | — | — | — | — | 110.0 | PVC | 8.0 | 68.0 | 10.0 | 9.0 | 45.0 | 1.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 25.0 | Galvanised Steel | 180.0 | 0 | 1 | 3 | Yes | 6 | 8.0 | Submersible Pump | Grundfos | 14.0 | 100.0 | Generator | Perkins | 33.0 | — | — | Good | Good | No | — | 19.2 | 8.5 | 185.0 | 129.0 | — | Communal | — | 18-04-03 | 4 | 3 | No | — | Yes | — | — | — | CARE Somalia | Construction of water tank generator room rehabilition pipeline | 2017-08-18 | Rehabilitation of kiosk animal trough hybrid system and fence 100m | — | Strategic Water Sources Survey – WSS_NATl |
1710 | BHSNCR081 | Borehole | Somaliland_MoWRD | Oct. 22, 2019 | Sanaag | Ceerigaabo | Xingalool | 0.0 | China | 25-11-86 | XINGALOOL BOREHOLE ONE | — | 9.75313 | 48.31306 | 909.0 | 4.3 | 0 | 1571727042937.jpg | Urban | No | 10 | Yes | — | — | — | — | — | — | — | 120.0 | GI | 6.0 | 70.0 | 8.0 | 7.0 | 10.0 | 0.5 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 25.0 | Galvanised Steel | 180.0 | 0 | 0 | 3 | Yes | 10 | 8.0 | Submersible Pump | Grundfos | 11.0 | 96.0 | Generator | Perkins | 33.0 | — | — | Good | Good | No | — | 23.2 | 7.9 | 233.0 | 194.0 | — | Utility/Local Authority | — | — | — | — | No | — | Yes | — | — | — | CARE Somalia | Water tank generator room installation of pump and risen pipe | 2019-01-17 | 2 new Kiosk fences 100m | — | Strategic Water Sources Survey – WSS_NATl |
7222 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 12, 2022 | Sanaag | ceerigaabo | Xingalool | 0.8 | Kuwait Government | 05/08/2014 | Xingalool borehole3 | — | 9.762195 | 48.31026 | 1007.0 | — | 3 | — | rural | yes | — | Yes | — | 2820 | 600 | — | 2800 | — | — | 130.0 | pvc | 8.0 | 70.0 | 18.0 | 21.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 70.0 | Galvanised Steel | — | — | 1 | 4 | yes | 18 | 8.0 | Submersible Pump | — | — | 82.0 | Hybrid - Solar/Generator | Iveco | 30.0 | JCNS-M36V370 | 19.9 | good | — | no | — | 32.1 | 6.9 | 4120.0 | 2060.0 | — | Communal | yes | 12/04/2015 | 3 | 2 | yes | 0.025 | yes | — | — | — | NRC | 12/04/2020 | 1: Solar 2: Construction of 2 toilet and one kiosks | 1: Amergency replacement of main raising pipes and submersible pump 2: Replacement of rusted distribution pipes. 3: water purification. 4: Generator 5: water supply for the village 6: Fencing 7: Construction of caretaker room 8: training of borehole workers in order to enhance work performance. 9: Solar power storage ( battery) | — | — |
8299 | — | Borehole | Somaliland MoWRD | April 24, 2022 | Sanaag | laasqoray | Xingalool | 2.0 | ARC | 24/04/2018 | Xingalool Dam | — | 9.8086839 | 48.3188596 | 896.0 | — | 0 | — | rural urban | no | 0 | Abandoned | 1.plastic removed. | 0 | 0 | 0 | 0 | 0.0 | — | 100.0 | other | 0.0 | — | 0.0 | 0.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Other | 0.0 | — | 0.0 | 0 | 0 | 0 | no | — | — | No Pump | — | — | — | — | — | — | — | — | poor | At current, it is dry no water | no | — | 0.0 | — | — | — | — | Communal | no | — | — | — | no | — | no | — | — | — | — | — | 0 | 1. Geoplastic membrance 2. Water trank. 3. Solar pannel installation. 4. Pump_2.5 kv/groundfos 5. watchman room rehabilitation. | — | — |
7860 | — | Borehole | Somaliland MoWRD | April 24, 2022 | Sanaag | laasqoray | Xingalool /Badhan | 1.0 | — | — | Xingalool Bore Hole2 | — | 9.7553161 | 48.3145481 | 850.0 | — | 2 | — | rural urban | yes | — | Yes | — | 12000 | 1300 | 950 | 17000 | 0.0 | — | 120.0 | gi | 8.0 | 74.0 | 5.0 | 12.0 | 0.0 | 1.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 14.0 | Galvanised Steel | 100.0 | 0 | 2 | 2 | yes | 4 | 10.0 | Submersible Pump | Luwara | 5.0 | 107.0 | Generator | Parkins | 45.0 | — | — | good | Good water supply system | no | — | 26.0 | 7.4 | 3100.0 | 2200.0 | — | Communal | no | — | — | — | no | — | no | — | — | — | — | — | 0 | 1. Fence _ 30 m cubic 2. New solar pannel Installation. 3. Animal trough rehabilation _3 | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France