Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
8457 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 1, 2022 | Togdheer | buuhoodle | Horufadhi | — | ICRC | 01/04/2019 | Horufadhi BH | — | 8.5796919 | 46.4102163 | 804.0 | — | 1 | — | urban rural | yes | — | Abandoned | Needed deeply observation about the borehole problem | — | — | — | — | — | — | — | pvc | 8.0 | — | 16.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 60.0 | PVC | 1200.0 | — | 4 | 4 | no | — | — | — | — | — | — | — | — | — | — | — | — | — | no | — | — | — | — | — | — | — | — | — | — | — | no | — | no | — | — | — | — | — | — | 1. Drilling new borehole 2. Deeply observation of borehole problem 3. Pipelines rehabilitation | — | — |
7252 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 9, 2022 | Mudug | goldogob | Ring oomane | — | TASS | 09/03/2019 | Ring oomane BH 2 | — | 7.2101855 | 47.1912994 | 373.0 | — | 2 | — | rural urban | yes | — | Yes | — | 3500 | 200 | — | 400 | — | — | 200.0 | pvc | 8.0 | — | 4.0 | 4.0 | — | 5.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 26.0 | Galvanised Steel | 100.0 | — | 1 | 2 | yes | 5 | 8.0 | Submersible Pump | Lowara | 11.0 | 169.0 | Generator | Parkins | 33.0 | — | — | poor | Needs construction water supplies ( koisks, animal throughts) | yes | Colorless and odorless | 39.5 | 7.6 | 2100.0 | 1035.0 | — | Communal | no | — | — | — | no | — | yes | — | — | — | — | — | — | 1. Drilling new borehole because of depletion of yield. 2. Installation of generator 4. Installation of solar power 4. Rehabilitation of animal throughts 5. Construction of new kiosks and rehabilitation koisks | — | — |
8582 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 1, 2022 | Togdheer | buuhoodle | Buuhoodle | 2.0 | UNICEF | 01/04/2006 | Farah Bulley BH 1 | — | 8.2199418 | 46.3559417 | 630.0 | — | 2 | — | urban rural | yes | — | No | 7 was not functioning, collapsed casing | — | — | — | — | 0.0 | — | 370.0 | gi | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 92.0 | PVC | 500.0 | — | — | — | no | — | — | — | — | — | — | — | — | — | — | — | — | — | no | — | — | — | — | — | — | Communal | yes | 01/04/2004 | 3 | 2 | no | — | no | — | — | — | — | — | — | 1. Drilling new borehole. 2. Construction of elevated water tank. | — | — |
7940 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 15, 2022 | Mudug | galkayo | Xarfo | — | WDA | 15/03/1986 | Xarfo BH 2 | — | 7.3467858 | 47.6165108 | 373.0 | — | 4 | — | urban | yes | — | Yes | — | 6300 | — | — | — | — | — | 193.0 | pvc | 8.0 | — | 4.0 | 5.0 | — | 5.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 16.0 | PVC | 2500.0 | 900 | 0 | 0 | yes | 5 | 8.0 | Submersible Pump | — | 7.5 | 170.0 | Generator | Parkins | 30.0 | — | — | poor | Poor water supply | yes | Colorless and odorless | 32.5 | 7.68 | 2295.0 | 1145.0 | — | Utility/Local Authority | — | — | — | — | no | — | no | — | — | — | — | — | — | 1. Drilling new borehole. 2. Full rehabilitation of water supply. 3. Installation of solar power. | — | — |
7223 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 26, 2022 | Mudug | jariban | Godobjiiran BH 1 | 0.0 | Chinese Government | 26/02/1986 | Godobjiraan BH 1 | — | 7.5139859 | 49.4103095 | 123.0 | — | 2 | — | rural urban | yes | — | Yes | — | 28000 | 1500 | — | 10000 | 0.0 | — | 210.0 | gi | 6.0 | — | 20.0 | 10.0 | — | 1.5 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 36.0 | Galvanised Steel | 180.0 | 4000 | 6 | 3 | yes | 4 | 24.0 | Submersible Pump | Gran fos | 11.0 | 150.0 | Hybrid - Solar/Generator | Parkins | 45.0 | SZYL_P300_36 | 15.0 | fair | Needs rehabilitation | yes | Colorless and odorless | 31.6 | 7.7 | 2800.0 | 1876.0 | — | Communal | yes | 26/02/1986 | 4 | 1 | yes | 0.15 | yes | — | — | — | KAALO Relief and Development | 26/02/2017 | Rehabilitation of elevated water tank | 1. Drilling new borehole. 2.fancing borehole areas. 3. Rehabilitation of generators and caretaker rooms. 4. Needs to help fuel. 5. Construction of new kiosks. 6. Rehabilitation of kiosks. 7. Rehabilitation of animal thoughts. | — | — |
7439 | — | Dug Well | Puntland Ministry of Energy Minerals and Water | Feb. 22, 2022 | Nugaal | eyl | Ciyocaddo | 0.3 | KAALO Relief and Development | 22/01/2017 | Ciyocado DW | — | 8.2704521 | 49.8270006 | 61.0 | — | 0 | — | rural urban | yes | — | Yes | — | 7000 | 2000 | — | 5000 | 0.0 | — | — | — | — | — | — | — | — | — | 6.0 | — | 2.5 | 12.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 45.0 | Galvanised Steel | 500.0 | 500 | 4 | 3 | yes | 12 | 72.0 | Submersible Pump | Lowara | 1.4 | 4.0 | Hybrid - Solar/Generator | Kama | 0.22 | 300-72M | 5.0 | poor | Destroyed dug well | no | — | 30.1 | 7.1 | 1000.0 | 495.0 | — | Communal | yes | 22/01/2017 | 3 | 2 | yes | 0.1 | — | — | — | — | KAALO Relief and Development | 22/01/2018 | Construction of ground tank | 1. Drilling new dug well. 2. Rehabilitation of water supply extension. 3. Construction of new kiosks. 4. Construction of new elevated tank | — | — |
8053 | — | Borehole | Somaliland MoWRD | May 11, 2022 | Togdheer | burco | Mohamed Cali Village | 3.0 | This is privately owned Borehole and was established by saleban kulul | 06/12/2010 | Saleeban kulul 2 | — | 9.53253471292555 | 45.4928277432918 | 1045.0 | — | 2 | — | rural | yes | — | Yes | — | 100 | 0 | 0 | 0 | 50.0 | — | 100.0 | pvc | 8.0 | 85.0 | 12.0 | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Other | — | — | — | — | — | — | — | — | — | Submersible Pump | Laware | 15.0 | 89.0 | Generator | Perkins | 45.0 | — | — | good | Good Condition | no | — | 34.0 | 8.3 | 1400.0 | 1000.0 | — | Private/Individual | — | — | — | — | no | — | no | — | — | — | — | — | — | 1. Elevated water tank 2. Animal troughs | — | — |
7852 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 13, 2022 | Sanaag | laasqoray | Dhahar | 0.2 | Community_ | 01/01/2019 | Ayaan2 | — | 9.7479088 | 48.8256519 | 895.0 | — | 2 | — | rural urban | yes | — | Yes | — | 1500 | 2000 | — | 5000 | — | — | 317.0 | pvc | 8.0 | 53.0 | 14.0 | 12.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 24.0 | Galvanised Steel | 300.0 | — | — | — | yes | 12 | 8.0 | Submersible Pump | Luwara | — | 196.0 | Solar | — | — | JCNS-M36V360 | 19.4 | poor | The water tank isn't sufficient | no | — | 32.0 | 7.1 | 3220.0 | 1630.0 | — | Private/Individual | — | — | — | — | no | — | no | — | — | — | Care - Somaliland IRC - Puntland | 01/01/2020 | Main raising Gi pipes and submersible pump, by Care-Somaliland. Solar power system and the installation by IRC Puntland. | 1. Elevated water tank with large storage capacity 2. Generator | — | — |
8305 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 16, 2022 | Nugaal | burtinle | Xaar-xaar | 0.8 | ISRC | 16/03/2018 | Xaar-xaar BH | — | 7.7855921 | 47.9840695 | 475.0 | — | 1 | — | urban rural | no | 2 | Abandoned | Since 2019, by borehole problem and depletion of yield. | 4200 | — | — | — | — | — | 430.0 | pvc | 8.0 | — | — | — | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 36.0 | Galvanised Steel | 2000.0 | — | 5 | 2 | no | — | — | Submersible Pump | Lowara | 18.0 | 335.0 | Hybrid - Solar/Generator | Parkins | 60.0 | Yl_300p-35b | 28.8 | poor | — | no | — | — | — | — | — | — | Communal | yes | 16/03/2017 | 6 | 1 | no | — | no | — | — | — | NRC | 16/03/2021 | 1. Rehabilitation of pump and cables. | 1. Emergency | — | — |
7333 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 1, 2022 | Mudug | jariban | Jariiban | 0.0 | WDA | 01/03/1986 | Jariiban BH 2 | — | 7.2139241 | 48.8476088 | 149.0 | — | 3 | — | rural urban | yes | — | Yes | — | 21000 | — | — | — | 0.0 | — | 182.0 | pvc | 8.0 | — | 14.0 | 15.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 24.0 | Galvanised Steel | 200.0 | — | 1 | 2 | yes | 40 | 8.0 | Submersible Pump | Green fos | 11.0 | 126.0 | Generator | Parkins | 45.0 | — | — | poor | This supply needs extension pipelines, new kiosks, and solar power | yes | Colorless and odorless | 27.6 | 7.43 | 1205.0 | 603.0 | — | Communal | yes | 01/03/2016 | 3 | 2 | yes | 0 | yes | — | — | — | CARE Somalia | 01/11/2021 | 1. Construction of elevated water tank 2. Construction Caretaker rooms 3. Pipe rehabilitation | 1. Emergency 2. Installation of solar power 3. Fancing 4. operator support 5. Emergency of supporting of fuel. | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France