Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
202 | BHBRBO006 | Borehole | SWALIM_HGS | Feb. 26, 2012 | Bari | Bossaso | — | — | — | — | Ceel Doofaar | — | 10.5969 | 49.0527 | 662.0 | — | — | — | — | — | — | Yes | — | 4000 | — | — | — | — | — | 175.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 7.9 | 5770.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Karkar formation | Hydrogeological Survey and Assessment of Selected Areas in Somaliland and Puntland - HASP |
123 | BHAWZE010 | Borehole | Somaliland_MoWRD | Dec. 6, 2019 | Awdal | Zeylac | Toqoshi | 18.0 | IFAD - International Fund for Agricultural Development | 07-12-14 | Quudabh | — | 11.3257 | 43.3771 | 17.0 | 4.9 | 1 | 1575615651103.jpg | Rural Urban | Yes | — | Yes | — | — | 3000 | — | 5000 | — | — | 40.0 | GI | 10.0 | 24.0 | 11.0 | 12.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 24.0 | PVC | 11000.0 | 175 | 6 | 2 | No | — | — | — | — | — | — | — | — | — | — | — | Poor | Pipeline leaks | No | — | 36.8 | 7.4 | 2660.0 | 1300.0 | — | Utility/Local Authority | — | — | — | — | Yes | 0.5 | No | — | — | — | — | — | — | Replacement casing and Resing pipe | — | Strategic Water Sources Survey – WSS_NATl |
124 | BHAWZE011 | Borehole | Somaliland_MoWR | Jan. 5, 2014 | Awdal | Zeylac | Ceelgaal | — | Somaliland MoWR - Ministry of Water Resources | 01-06-98 | Ceelgaal BH1 | — | 10.9757 | 43.4382 | 88.0 | — | — | — | Rural | Yes | — | Yes | — | 500 | 200 | — | 4000 | — | — | 95.0 | — | — | 80.0 | 7.0 | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 13.0 | — | 80.0 | — | — | — | — | — | — | — | SPI 5 | — | 92.0 | — | — | — | — | — | — | — | — | — | — | 7.6 | 4500.0 | 2960.0 | — | Public | — | — | — | — | — | 0.03 | — | 0.15 | — | — | Djibouti | Cleaning, replace of riser pipe , installation of new pump and engine | 2010-07-04 | — | — | Strategic Boreholes Survey – BHS |
143 | BHBKCE003 | Borehole | SWALIM_GSA | Nov. 5, 2017 | Bakool | Ceel Barde | Sayid 1 | — | Public | 01-01-12 | Celbarde BH | — | 4.8223 | 43.6623 | 489.0 | — | — | — | Urban | Yes | — | Yes | — | — | — | — | — | — | Yes | 220.0 | — | — | 129.0 | 11.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 7.6 | 4360.0 | 2170.0 | BRKX10 | Community | — | — | — | — | — | — | — | — | — | — | — | — | — | Replaceing the GI pipes and Provide New Pump | Fair | Strategic Water Sources Survey in Bay and Bakool Regions – WSS_BB |
8679 | — | Borehole | FGS Ministry of Energy and Water Resources | — | Bay | Baydhaba | Ededa | — | SSWC | 1/1/2007 | Shaati BH | — | 3.132 | 43.6717 | — | — | — | — | — | Yes | — | Yes | — | — | — | — | — | — | — | 85.0 | — | — | 40.0 | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Community | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
4284 | DWNGGA118 | Dug Well | SWALIM_HGS | Jan. 31, 2012 | Nugaal | Garoowe | — | — | — | — | Lavadulli/BEW043 | — | 8.4496 | 48.89974 | 346.0 | — | — | — | — | — | — | Yes | — | — | 1000 | — | 700 | — | — | — | — | — | — | — | — | — | — | 2.5 | 1.5 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 29.0 | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Quarterian | Hydrogeological Survey and Assessment of Selected Areas in Somaliland and Puntland - HASP |
217 | BHBRBO021 | Borehole | Puntland_PWDA | Nov. 13, 2019 | Bari | Bossaso | Jiingada | 1.0 | Puntland MoEMW - Ministry of Energy, Minerals and Water | 10-10-88 | Jiingada | — | 10.7199 | 49.1443 | 584.0 | 4.9 | — | — | Rural | Yes | — | Yes | — | — | 1700 | — | 1500 | 6.0 | — | 100.0 | — | — | — | 26.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 56.0 | — | 1500.0 | — | — | — | — | — | — | — | Lowara 7.5kW | — | 96.0 | — | — | — | — | — | — | — | — | — | — | 9.4 | 4200.0 | 2790.0 | — | Public | — | — | — | — | — | 0.1 | — | — | — | — | IDB - Islamic Development Bank | Generator and pump | 2013-07-05 | — | — | Strategic Water Sources Survey – WSS_NATl |
5774 | DMGDGA007 | Dam | SWALIM_WSIS | Sept. 23, 2009 | Gedo | Garbahaarey | Haromadhera | — | — | — | Haromadhera | — | 2.8958 | 42.45 | 266.0 | — | — | — | — | Yes | — | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 6.8 | 210.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Water Sources Inventory Survey – WSIS |
813 | BHHRBE005 | Borehole | SCF | Feb. 22, 2005 | Hiraan | Belet Weyne | — | — | — | — | Donyale | — | 4.7484 | 44.8707 | 292.0 | — | — | — | — | — | — | No | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Water Sources Data from Partners – WSD_Pat |
2091 | BHWGGE052 | Borehole | SWALIM_HGS | Jan. 15, 2012 | Woqooyi Galbeed | Gebiley | — | — | — | — | Kalabaeyoh | — | 9.6938 | 43.57474 | 1508.0 | — | — | — | — | — | — | Yes | — | 720 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Africa 70 | — | 2007-10-25 | — | — | Hydrogeological Survey and Assessment of Selected Areas in Somaliland and Puntland - HASP |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France