Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
8272 | — | Dam | Somaliland MoWRD | April 18, 2022 | Woqooyi Galbeed | hargeisa | Salaxley Dam | 1.0 | Somaliland MoWRD | 15/05/2020 | Salaxley Dam | — | 9.0097768 | 44.2099198 | 1211.0 | — | 0 | — | rural urban | no | 8 | No | 7 months becouse the work is going on and no more rain fall. | 30000 | 4000 | 150 | 10000 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 3.0 | 150.0 | 100.0 | — | — | — | — | — | — | — | — | — | 25.0 | — | — | 4300 | 0 | 0 | no | — | — | — | — | — | — | — | — | — | — | — | — | No supply the water source dried. | no | — | 0.0 | — | — | — | — | Communal | no | — | — | — | no | — | no | — | — | — | — | — | — | The work is still continue | — | — |
8582 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 1, 2022 | Togdheer | buuhoodle | Buuhoodle | 2.0 | UNICEF | 01/04/2006 | Farah Bulley BH 1 | — | 8.2199418 | 46.3559417 | 630.0 | — | 2 | — | urban rural | yes | — | No | 7 was not functioning, collapsed casing | — | — | — | — | 0.0 | — | 370.0 | gi | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 92.0 | PVC | 500.0 | — | — | — | no | — | — | — | — | — | — | — | — | — | — | — | — | — | no | — | — | — | — | — | — | Communal | yes | 01/04/2004 | 3 | 2 | no | — | no | — | — | — | — | — | — | 1. Drilling new borehole. 2. Construction of elevated water tank. | — | — |
8248 | — | Borehole | Somaliland MoWRD | April 27, 2022 | Woqooyi Galbeed | gebiley | Carro yanbo | 0.6 | Cago Wayne | — | Cago Wayne borehole 2 | — | 9.6577827 | 43.7986936 | 1377.0 | — | 0 | — | — | yes | — | No | 8 months before becouse it collapse | 0 | 0 | 0 | 0 | 0.0 | — | 130.0 | gi | 8.0 | 70.0 | 0.0 | 0.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 20.0 | — | — | 0 | 0 | 0 | no | — | — | Submersible Pump | Grundfos | 0.0 | 104.0 | — | — | — | — | — | — | — | no | — | 0.0 | — | — | — | — | Private/Individual | — | — | — | — | no | — | no | — | — | — | — | — | — | — | — | — |
8419 | — | Dam | Somaliland MoWRD | April 17, 2022 | Woqooyi Galbeed | hargeisa | Bali matan | 0.3 | Community | — | Bali matan Dam | — | 9.1216215 | 44.4588316 | -1.0 | — | 0 | — | rural urban | no | 10 | No | 8 months before becouse of low rain fall or luck of enough rain fall. | 3500 | 200 | 0 | 3000 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 1.0 | 70.0 | 80.0 | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 25.0 | Galvanised Steel | 200.0 | 500 | 5 | 3 | no | — | — | Submersible Pump | Unkown | — | — | Solar | — | — | Solar world | 1.5 | poor | This dam is all ready dried before 8 months becouse of low rainfall. | no | — | — | — | — | — | — | Communal | no | — | — | — | no | — | no | — | — | — | — | — | — | No intervention required | — | — |
8243 | — | Borehole | Somaliland MoWRD | April 21, 2022 | Woqooyi Galbeed | gebiley | Geed Abeera | 3.0 | Concern Worldwide Somalia | 21/04/2012 | Geed Abeera borehole | — | 9.6074731 | 43.7539388 | 1667.0 | — | 0 | — | rural urban | yes | — | No | 8 years before becouse of the riser pipe and pump failure. | 5600 | 3000 | 15000 | 5000 | 0.0 | — | 211.0 | gi | 8.0 | 178.0 | 10.0 | 0.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 30.0 | PVC | 3000.0 | 800 | 0 | 0 | no | — | — | Submersible Pump | Grundfos | 10.0 | 185.0 | Generator | Jubuilan bros | 45.0 | — | — | poor | No water supply at all becouse the the borehole is non function. | no | — | 0.0 | — | — | — | — | Communal | no | — | — | — | no | — | no | — | — | — | — | — | — | Full development | — | — |
7548 | — | Dug Well | FGS Ministry of Energy and Water Resources | March 16, 2022 | Middle Shabelle | balcad | Garas Bintow | 2.8 | Private | 10/04/2007 | Farjano | — | 2.2169254 | 45.397737 | 132.0 | — | — | — | rural | yes | — | No | 9 months ago, because of it collapsed about 20m from ground level. | 1865 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 6.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | Galvanised Steel | 80.0 | 110 | — | — | no | — | — | Submersible Pump | Lowara 5.5kw | — | 109.0 | Generator | Duos | 30.0 | — | — | poor | It's in a bad condition | no | — | — | — | — | — | — | Private/Individual | — | — | — | — | yes | 0.05 | no | — | — | — | — | — | No intervention | Deepening and full rehabilitation | — | — |
8460 | — | Dug Well | Puntland Ministry of Energy Minerals and Water | March 28, 2022 | Nugaal | garowe | Cuun | — | — | — | Cuun dugwell 2 | — | 8.8162779 | 48.8932247 | 465.0 | — | 2 | — | urban | yes | — | No | A months , for power problems | 750 | — | — | — | — | — | — | — | — | — | — | — | — | — | 9.0 | — | 7.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 3 | — | no | — | — | No Pump | — | — | — | — | — | — | — | — | poor | This dugwell and its water supply needs full rehabilitation | no | — | — | — | — | — | — | Communal | yes | 15/04/2007 | 3 | 2 | no | — | no | — | — | — | — | — | — | 1. Rehabilitation of pipes 2. Rehabilitation of koisks 3. Replacement of pump. 4. | — | — |
8397 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 7, 2022 | Mudug | goldogob | Godgaashaan | — | — | 07/03/2019 | Godgaashaan BH | — | 6.978967 | 47.2497849 | 320.0 | — | 1 | — | rural urban | yes | — | No | A months ago, borehole needs observation of the problem stopped. | 1500 | 1200 | — | 1200 | 0.0 | — | 130.0 | pvc | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 36.0 | Other | — | 150 | — | 2 | yes | — | — | Submersible Pump | — | 11.0 | — | Generator | Parkins | 30.0 | — | — | poor | Needs rehabilitation of supplies | no | — | — | — | — | — | — | Communal | no | — | — | — | no | — | — | — | — | — | NRC | 07/03/2021 | 1. Construction of new elevated tank | 1. Emergency 2. Observation of borehole 3. Construction of koisks 4. Construction of generator room and caretaker room | — | — |
8737 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 7, 2022 | Mudug | goldogob | Xerojaalle | 0.5 | — | — | Xerojaalle | — | 6.987134 | 47.1766608 | 320.0 | — | 1 | — | rural urban | no | 8 | No | A months, borehole problems | 2500 | — | — | — | 0.0 | — | — | pvc | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | yes | — | — | — | — | — | — | Communal | no | — | — | — | — | — | — | — | — | — | NRC | 07/03/2020 | Construction of elevated water | 1. Emergency 2. Observation of borehole | — | — |
7941 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 14, 2022 | Mudug | galkayo | Bacaadweyn | 0.3 | Bacaadweyn water company | 14/03/2019 | Bacaadweyn water company BH 2 | — | 7.1840294 | 47.5360031 | 344.0 | — | 2 | — | urban | yes | — | No | A years, Because of lack of water supply. | — | — | — | — | — | — | 210.0 | pvc | 8.0 | — | 22.0 | — | — | 2.4 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | no | — | — | Submersible Pump | — | 22.0 | 180.0 | — | — | — | — | — | poor | There is no any water supply | no | — | 30.2 | 7.6 | 2261.0 | 1133.0 | — | Utility/Local Authority | — | — | — | — | no | — | no | — | — | — | — | — | — | 1. Emergency 2. Construction of new elevated tank 3. Installation of generator and solar power 4. Extension of pipelines. 5. Construction of caretaker and Generator rooms. | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France