Code | BHAWBO003 |
---|---|
Water Source Type | Borehole |
Inspecting Agency | Somaliland_MoWRD |
Inspection Date | Dec. 4, 2019 |
District | Borama |
Settlement Name | Quljed |
Settlement Distance (km) | 2.0 |
Establishing Agency | None |
Establishing Date | 04-07-96 |
Source Name | Quljed BH1 |
Latitude | 10.0879 |
Longitude | 43.029 |
Sources Cluster | 0 |
Water Source Photo | |
Users | Rural Urban |
Permanent? | Yes |
Months Used | None |
Functioning? | Yes |
Non Function Reason | None |
No of Humans | None |
No of Camels | 50 |
No of Cattle | 100 |
No of Shoats | 200 |
Irrigation Area (ha) | 0.0 |
Source Protected? | None |
Borehole Depth (m) | 100.0 |
Wellcasing Type | GI |
Wellcasing Size (inches) | 8.0 |
Borehole SWL (m) | 61.3 |
Borehole Operating Yield (m3/hr) | 12.0 |
Borehole Operating Hours (hrs/day) | 4.0 |
Borehole Operating Drawn (m) | None |
Borehole Recovery Time (hr) | 0.0 |
Reservoir Type | Concrete/Masonry tank |
Reservoir Capacity (m3) | 48.0 |
Pipeline Type | PVC |
Pipeline Length (m) | 3000.0 |
HouseHold Connections | 50 |
Water Point Kiosks | 2 |
Troughs | 4 |
Source Emergency? | Yes |
No of Trucks | 3 |
Truck Capacity (m3/hr) | 8.0 |
Pump Type | Submersible Pump |
Pump Model | Grundfos |
Pump Capacity (m3/hr) | 3.0 |
Pump Level (m) | 102.0 |
Power Source | Hybrid - Solar/Generator |
Generator Type | Perkins |
Generator Capacity (kVA/kWh) | 75.5 |
Solar Type | Photovoltaic |
Solar Capacity (kVA/kWh) | 15.38 |
Supply Condition | Good |
Supply System Condition Notes | None |
Physical Water Issues | No |
Physical Problem Reason | None |
Temperature (°C) | 15.0 |
pH | 8.28 |
Electrical Conductivity (µS/cm) | 1106.0 |
Total Dissolved Solids (mg/l) | 786.0 |
Water Sample Code | No Document |
Management Type | Communal |
WSC | None |
WSC Established Date | 04-07-17 |
WSC Male | 2 |
WSC Female | 1 |
Humans Charged for Water? | Yes |
Cost Of Water for Humans (USD) | 0.3 |
Water Charged for Animals? | Yes |
Cost Of Water for Animals (USD) | None |
Last Intervention Agency | Other |
Last Intervention Description | Construction of elevated water tank Installation of solar Generator Construction room Pipe line extention |
Last Intervention Date | 2019-05-09 |
Proposed Intervention Description | Construction room staff |
Additional Notes | None |
Metadata Tag | Strategic Water Sources Survey – WSS_NAT |
History | History BHAWBO003 |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, AICS, USAID, SDC, FCDO and Government of France