Code |
BHAWBO003 |
Water Source Type |
Borehole |
Inspecting Agency |
Somaliland_MoWRD |
Inspection Date |
Dec. 4, 2019 |
District |
Borama |
Settlement Name |
Quljed |
Settlement Distance |
2.0 |
Establishing Agency |
None |
Establishing Date |
04-07-96 |
Source Name |
Quljed BH1 |
Geometry |
None |
Latitude |
10.0879 |
Longitude |
43.029 |
Sources Cluster |
0 |
Water Source Photo |
 |
Users |
Rural Urban |
Permanent? |
Yes |
Months Used |
None |
Functioning? |
Yes |
Non Function Reason |
None |
No of Humans |
None |
No of Camels |
50 |
No of Cattle |
100 |
No of Shoats |
200 |
Irrigation Area |
0.0 |
Source Protected? |
None |
Borehole Depth |
100.0 |
Wellcasing Type |
GI |
Wellcasing Size |
8.0 |
Borehole SWL |
61.3 |
Borehole Operating Yield |
12.0 |
Borehole Operating Hours |
4.0 |
Borehole Operating Drawn |
None |
Borehole Recovery Time |
0.0 |
Reservoir Type |
Concrete/Masonry tank |
Reservoir Capacity |
48.0 |
Pipeline Type |
PVC |
Pipeline Length |
3000.0 |
HouseHold Connections |
50 |
Water Point Kiosks |
2 |
Troughs |
4 |
Source Emergency? |
Yes |
No of Trucks |
3 |
Truck Capacity |
8.0 |
Pump Type |
Submersible Pump |
Pump Model |
Grundfos |
Pump Capacity |
3.0 |
Pump Level |
102.0 |
Power Source |
Hybrid - Solar/Generator |
Generator Type |
Perkins |
Generator Capacity |
75.5 |
Solar Type |
Photovoltaic |
Solar Capacity |
15.38 |
Supply Condition |
Good |
Supply System Condition Notes |
None |
Physical Water Issues |
No |
Physical Problem Reason |
None |
Temperature |
15.0 |
pH |
8.28 |
Electrical Conductivity |
1106.0 |
Total Dissolved Solids |
786.0 |
Water Sample Code |
No Document |
Management Type |
Communal |
WSC |
None |
WSC Established Date |
04-07-17 |
WSC Male |
2 |
WSC Female |
1 |
Humans Charged for Water? |
Yes |
Cost Of Water for Humans |
0.3 |
Water Charged for Animals? |
Yes |
Cost Of Water for Animals |
None |
Last Intervention Agency |
Other |
Last Intervention Description |
Construction of elevated water tank
Installation of solar
Generator
Construction room
Pipe line extention |
Last Intervention Date |
May 9, 2019 |
Proposed Intervention Description |
Construction room staff |
Additional Notes |
None |
Metadata Tag |
Strategic Water Sources Survey – WSS_NAT |
History |
watersource.HistoricalWaterSource.None |