Code |
BHGDGA006 |
Water Source Type |
Borehole |
Inspecting Agency |
FGS_MoEWR |
Inspection Date |
Oct. 10, 2019 |
District |
Garbahaarey |
Settlement Name |
Shabeel |
Settlement Distance |
None |
Establishing Agency |
Former Somali Government |
Establishing Date |
11-11-85 |
Source Name |
Garbaharey 1 |
Geometry |
None |
Latitude |
3.33411 |
Longitude |
42.21629 |
Sources Cluster |
None |
Water Source Photo |
 |
Users |
Urban |
Permanent? |
Yes |
Months Used |
None |
Functioning? |
Yes |
Non Function Reason |
None |
No of Humans |
None |
No of Camels |
None |
No of Cattle |
None |
No of Shoats |
None |
Irrigation Area |
None |
Source Protected? |
None |
Borehole Depth |
102.0 |
Wellcasing Type |
GI |
Wellcasing Size |
2.0 |
Borehole SWL |
7.0 |
Borehole Operating Yield |
24.0 |
Borehole Operating Hours |
11.0 |
Borehole Operating Drawn |
44.0 |
Borehole Recovery Time |
4.0 |
Reservoir Type |
Concrete/Masonry tank |
Reservoir Capacity |
100.0 |
Pipeline Type |
PVC |
Pipeline Length |
3000.0 |
HouseHold Connections |
2000 |
Water Point Kiosks |
2 |
Troughs |
1 |
Source Emergency? |
Yes |
No of Trucks |
6 |
Truck Capacity |
8.0 |
Pump Type |
Submersible Pump |
Pump Model |
Grundfos |
Pump Capacity |
11.0 |
Pump Level |
48.0 |
Power Source |
Generator |
Generator Type |
Fiat |
Generator Capacity |
145.0 |
Solar Type |
None |
Solar Capacity |
None |
Supply Condition |
Good |
Supply System Condition Notes |
None |
Physical Water Issues |
No |
Physical Problem Reason |
None |
Temperature |
33.5 |
pH |
6.84 |
Electrical Conductivity |
5580.0 |
Total Dissolved Solids |
2720.0 |
Water Sample Code |
No Document |
Management Type |
Private-Public-Partnership |
WSC |
None |
WSC Established Date |
None |
WSC Male |
None |
WSC Female |
None |
Humans Charged for Water? |
Yes |
Cost Of Water for Humans |
0.1 |
Water Charged for Animals? |
No |
Cost Of Water for Animals |
None |
Last Intervention Agency |
None |
Last Intervention Description |
New submersible pump installed, pressure pump changed, 1200m new pipline installed, ( in february 2019 the Napad organisation was built two concrete elevated tank 50m3, 30m3) (iom installed solar system of 126 panel 31kw, generator restor, fence, 2 k |
Last Intervention Date |
June 9, 2019 |
Proposed Intervention Description |
Solar system 80kw, standby generator, pressure pump for water distribution, filter RO, 2 elevated tanks 50m3, pipline 6000m PVC class D, 2 kiosk.
Furthermore, the water from this borehole used to filter before distribution by using RO filter system. |
Additional Notes |
None |
Metadata Tag |
Strategic Water Sources Survey – WSS_NAT |
History |
watersource.HistoricalWaterSource.None |