Code | BHGLCB003 |
---|---|
Water Source Type | Borehole |
Inspecting Agency | FGS_MoEWR |
Inspection Date | Sept. 18, 2019 |
District | Cabudwaaq |
Settlement Name | Xeraale |
Settlement Distance (km) | 7.0 |
Establishing Agency | Community |
Establishing Date | 13-01-09 |
Source Name | Xeraale 3 |
Latitude | 5.9582 |
Longitude | 46.0122 |
Sources Cluster | 0 |
Water Source Photo | |
Users | Rural |
Permanent? | Yes |
Months Used | None |
Functioning? | Yes |
Non Function Reason | None |
No of Humans | None |
No of Camels | 1000 |
No of Cattle | 0 |
No of Shoats | 100000 |
Irrigation Area (ha) | 0.0 |
Source Protected? | None |
Borehole Depth (m) | 80.0 |
Wellcasing Type | None |
Wellcasing Size (inches) | None |
Borehole SWL (m) | 10.0 |
Borehole Operating Yield (m3/hr) | 12.0 |
Borehole Operating Hours (hrs/day) | 11.0 |
Borehole Operating Drawn (m) | 1.0 |
Borehole Recovery Time (hr) | None |
Reservoir Type | Concrete/Masonry tank |
Reservoir Capacity (m3) | 264.0 |
Pipeline Type | Other |
Pipeline Length (m) | None |
HouseHold Connections | 0 |
Water Point Kiosks | 0 |
Troughs | 2 |
Source Emergency? | Yes |
No of Trucks | 3 |
Truck Capacity (m3/hr) | 6.0 |
Pump Type | No Pump |
Pump Model | None |
Pump Capacity (m3/hr) | None |
Pump Level (m) | None |
Power Source | None |
Generator Type | None |
Generator Capacity (kVA/kWh) | None |
Solar Type | None |
Solar Capacity (kVA/kWh) | None |
Supply Condition | Poor |
Supply System Condition Notes | It is not comfortable because the pump have no power |
Physical Water Issues | No |
Physical Problem Reason | None |
Temperature (°C) | 31.6 |
pH | 7.11 |
Electrical Conductivity (µS/cm) | 1535.0 |
Total Dissolved Solids (mg/l) | 1846.0 |
Water Sample Code | No Document |
Management Type | Communal |
WSC | None |
WSC Established Date | 24-12-09 |
WSC Male | 5 |
WSC Female | 0 |
Humans Charged for Water? | Yes |
Cost Of Water for Humans (USD) | 0.01 |
Water Charged for Animals? | Yes |
Cost Of Water for Animals (USD) | None |
Last Intervention Agency | WFP - United Nations World Food Programme |
Last Intervention Description | Construction of water tank |
Last Intervention Date | 2010-10-17 |
Proposed Intervention Description | 1. Construction of water tank 2. Solar creation 3.changing the motor 5. Construction of water trought |
Additional Notes | None |
Metadata Tag | Strategic Water Sources Survey – WSS_NAT |
History | History BHGLCB003 |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France