| Code | BHGLCB019 |
|---|---|
| Water Source Type | Borehole |
| Inspecting Agency | FGS_MoEWR |
| Inspection Date | Sept. 17, 2019 |
| District | Cabudwaaq |
| Settlement Name | Dalsan |
| Settlement Distance (km) | 7.0 |
| Establishing Agency | Horn of Africa |
| Establishing Date | 10-01-11 |
| Source Name | Dalsan |
| Latitude | 6.272 |
| Longitude | 46.3184 |
| Sources Cluster | 1 |
| Water Source Photo | ![]() |
| Users | Rural Urban |
| Permanent? | Yes |
| Months Used | None |
| Functioning? | Yes |
| Non Function Reason | None |
| No of Humans | None |
| No of Camels | 800 |
| No of Cattle | 500 |
| No of Shoats | 200000 |
| Irrigation Area (ha) | 1.0 |
| Source Protected? | None |
| Borehole Depth (m) | 120.0 |
| Wellcasing Type | None |
| Wellcasing Size (inches) | None |
| Borehole SWL (m) | 30.0 |
| Borehole Operating Yield (m3/hr) | 14.0 |
| Borehole Operating Hours (hrs/day) | 17.0 |
| Borehole Operating Drawn (m) | 6.0 |
| Borehole Recovery Time (hr) | None |
| Reservoir Type | Concrete/Masonry tank |
| Reservoir Capacity (m3) | 238.0 |
| Pipeline Type | PVC |
| Pipeline Length (m) | 1500.0 |
| HouseHold Connections | 1125 |
| Water Point Kiosks | 8 |
| Troughs | 3 |
| Source Emergency? | Yes |
| No of Trucks | 6 |
| Truck Capacity (m3/hr) | 13.0 |
| Pump Type | No Pump |
| Pump Model | None |
| Pump Capacity (m3/hr) | None |
| Pump Level (m) | None |
| Power Source | None |
| Generator Type | None |
| Generator Capacity (kVA/kWh) | None |
| Solar Type | None |
| Solar Capacity (kVA/kWh) | None |
| Supply Condition | Fair |
| Supply System Condition Notes | Shortage of water tank |
| Physical Water Issues | No |
| Physical Problem Reason | None |
| Temperature (°C) | 32.0 |
| pH | 6.91 |
| Electrical Conductivity (µS/cm) | 1528.0 |
| Total Dissolved Solids (mg/l) | 1200.0 |
| Water Sample Code | No Document |
| Management Type | Utility/Local Authority |
| WSC | None |
| WSC Established Date | None |
| WSC Male | None |
| WSC Female | None |
| Humans Charged for Water? | Yes |
| Cost Of Water for Humans (USD) | 0.005 |
| Water Charged for Animals? | No |
| Cost Of Water for Animals (USD) | None |
| Last Intervention Agency | None |
| Last Intervention Description | Construction of trought and water tank |
| Last Intervention Date | 2012-05-13 |
| Proposed Intervention Description | 1. Create solar 2. Water supply pipes 3. Construction of water trought 4. Pum 5. Motor solar |
| Additional Notes | None |
| Metadata Tag | Strategic Water Sources Survey – WSS_NAT |
| History | History BHGLCB019 |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, The World Bank, FCDO, AICS, SDC, Canada, Sweden and GCF
;