Code | BHGLDH045 |
---|---|
Water Source Type | Borehole |
Inspecting Agency | FGS_MoEWR |
Inspection Date | Sept. 15, 2019 |
District | Dhusa Marreb |
Settlement Name | Godinlabe1 |
Settlement Distance (km) | 3.0 |
Establishing Agency | Former Somali Government |
Establishing Date | 10-05-77 |
Source Name | Godinlabe one |
Latitude | 5.8744 |
Longitude | 46.6313 |
Sources Cluster | 1 |
Water Source Photo | ![]() |
Users | Rural Urban |
Permanent? | Yes |
Months Used | None |
Functioning? | Yes |
Non Function Reason | None |
No of Humans | None |
No of Camels | 1500 |
No of Cattle | 30 |
No of Shoats | 101000 |
Irrigation Area (ha) | 0.0 |
Source Protected? | None |
Borehole Depth (m) | 242.0 |
Wellcasing Type | None |
Wellcasing Size (inches) | None |
Borehole SWL (m) | 16.0 |
Borehole Operating Yield (m3/hr) | 7.5 |
Borehole Operating Hours (hrs/day) | 20.0 |
Borehole Operating Drawn (m) | 2.0 |
Borehole Recovery Time (hr) | 0.0 |
Reservoir Type | Concrete/Masonry tank |
Reservoir Capacity (m3) | 733.0 |
Pipeline Type | PVC |
Pipeline Length (m) | 3000.0 |
HouseHold Connections | 1000 |
Water Point Kiosks | 2 |
Troughs | 3 |
Source Emergency? | Yes |
No of Trucks | 15 |
Truck Capacity (m3/hr) | 14.0 |
Pump Type | Submersible Pump |
Pump Model | Italy |
Pump Capacity (m3/hr) | 12.0 |
Pump Level (m) | 120.0 |
Power Source | Generator |
Generator Type | JVA |
Generator Capacity (kVA/kWh) | 30.0 |
Solar Type | None |
Solar Capacity (kVA/kWh) | None |
Supply Condition | Fair |
Supply System Condition Notes | Very low unsanitation It needs rehabilitation |
Physical Water Issues | No |
Physical Problem Reason | None |
Temperature (°C) | 30.0 |
pH | 6.8 |
Electrical Conductivity (µS/cm) | 2820.0 |
Total Dissolved Solids (mg/l) | 3020.0 |
Water Sample Code | No Document |
Management Type | Utility/Local Authority |
WSC | None |
WSC Established Date | None |
WSC Male | None |
WSC Female | None |
Humans Charged for Water? | Yes |
Cost Of Water for Humans (USD) | 0.01 |
Water Charged for Animals? | Yes |
Cost Of Water for Animals (USD) | None |
Last Intervention Agency | Community |
Last Intervention Description | Changing Casin Construction of water tank |
Last Intervention Date | 1992-07-10 |
Proposed Intervention Description | 1. It needs pum 2.changing the motor 3. Construction of water tank |
Additional Notes | None |
Metadata Tag | Strategic Water Sources Survey – WSS_NAT |
History | History BHGLDH045 |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, AICS, SDC, FCDO and Government of France