Code BHMDHO001
Water Source Type Borehole
Inspecting Agency SWALIM_GSA
Inspection Date Feb. 18, 2016
District Hobyo
Settlement Name Qaidaro
Settlement Distance None
Establishing Agency None
Establishing Date 14-06-11
Source Name QaidroBH
Geometry None
Latitude 5.7963
Longitude 47.4882
Sources Cluster None
Water Source Photo No Photo
Users Rural Urban
Permanent? Yes
Months Used None
Functioning? Yes
Non Function Reason None
No of Humans 1200
No of Camels 1000
No of Cattle 400
No of Shoats 6000
Irrigation Area None
Source Protected? Yes
Borehole Depth 150.0
Wellcasing Type None
Wellcasing Size None
Borehole SWL 14.0
Borehole Operating Yield 22.0
Borehole Operating Hours 6.0
Borehole Operating Drawn 6.0
Borehole Recovery Time 1.0
Reservoir Type None
Reservoir Capacity 30.0
Pipeline Type None
Pipeline Length 1500.0
HouseHold Connections None
Water Point Kiosks None
Troughs None
Source Emergency? None
No of Trucks None
Truck Capacity None
Pump Type None
Pump Model Lowara
Pump Capacity None
Pump Level None
Power Source None
Generator Type None
Generator Capacity None
Solar Type None
Solar Capacity None
Supply Condition None
Supply System Condition Notes None
Physical Water Issues None
Physical Problem Reason None
Temperature 24.0
pH 8.1
Electrical Conductivity 4900.0
Total Dissolved Solids 2450.0
Water Sample Code No Document
Management Type Community
WSC None
WSC Established Date None
WSC Male None
WSC Female None
Humans Charged for Water? None
Cost Of Water for Humans 0.02
Water Charged for Animals? None
Cost Of Water for Animals 0.01
Last Intervention Agency IRC - International Rescue Committee
Last Intervention Description Supplied generator and pump
Last Intervention Date Jan. 1, 2014
Proposed Intervention Description To construct the water tank, pump, GI pipes for replacement
Additional Notes None
Metadata Tag Strategic Water Sources Survey in Galmudug State – WSS_GM
History watersource.HistoricalWaterSource.None