Code | BHMDHO033 |
---|---|
Water Source Type | Borehole |
Inspecting Agency | SWALIM_GSA |
Inspection Date | April 1, 2018 |
District | Hobyo |
Settlement Name | Gawaan |
Settlement Distance (km) | None |
Establishing Agency | Former Somali Government |
Establishing Date | 01-01-85 |
Source Name | Wisil BH1 |
Latitude | 5.4276 |
Longitude | 48.1208 |
Sources Cluster | None |
Water Source Photo | |
Users | Rural |
Permanent? | Yes |
Months Used | None |
Functioning? | Yes |
Non Function Reason | None |
No of Humans | None |
No of Camels | None |
No of Cattle | None |
No of Shoats | None |
Irrigation Area (ha) | None |
Source Protected? | None |
Borehole Depth (m) | 136.0 |
Wellcasing Type | None |
Wellcasing Size (inches) | None |
Borehole SWL (m) | 85.0 |
Borehole Operating Yield (m3/hr) | 26.0 |
Borehole Operating Hours (hrs/day) | 6.0 |
Borehole Operating Drawn (m) | None |
Borehole Recovery Time (hr) | None |
Reservoir Type | None |
Reservoir Capacity (m3) | 40.0 |
Pipeline Type | None |
Pipeline Length (m) | 3000.0 |
HouseHold Connections | None |
Water Point Kiosks | None |
Troughs | None |
Source Emergency? | None |
No of Trucks | None |
Truck Capacity (m3/hr) | None |
Pump Type | None |
Pump Model | Franklin |
Pump Capacity (m3/hr) | None |
Pump Level (m) | None |
Power Source | None |
Generator Type | None |
Generator Capacity (kVA/kWh) | None |
Solar Type | None |
Solar Capacity (kVA/kWh) | None |
Supply Condition | None |
Supply System Condition Notes | None |
Physical Water Issues | None |
Physical Problem Reason | None |
Temperature (°C) | 30.0 |
pH | 7.7 |
Electrical Conductivity (µS/cm) | 3920.0 |
Total Dissolved Solids (mg/l) | 1960.0 |
Water Sample Code | No Document |
Management Type | Community |
WSC | None |
WSC Established Date | None |
WSC Male | None |
WSC Female | None |
Humans Charged for Water? | None |
Cost Of Water for Humans (USD) | 0.02 |
Water Charged for Animals? | None |
Cost Of Water for Animals (USD) | 0.01 |
Last Intervention Agency | GSA - General Service Agency |
Last Intervention Description | Pipe line to the village 3 km and supply new pump |
Last Intervention Date | 2015-01-01 |
Proposed Intervention Description | To construct new water tank and also to provide GI pipes ,pump 15hp |
Additional Notes | None |
Metadata Tag | Strategic Water Sources Survey in Galmudug, Hiran, Middle and Lower Shabelle – WSS_GMHS |
History | History BHMDHO033 |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France