Code |
BHMDHO036 |
Water Source Type |
Borehole |
Inspecting Agency |
SWALIM_GSA |
Inspection Date |
Feb. 16, 2016 |
District |
Hobyo |
Settlement Name |
Wisil |
Settlement Distance |
None |
Establishing Agency |
GTZ - German Agency for Technical Assistance |
Establishing Date |
10-09-86 |
Source Name |
Wisil BH3 |
Geometry |
None |
Latitude |
5.4275 |
Longitude |
48.1209 |
Sources Cluster |
None |
Water Source Photo |
![No Photo]() |
Users |
Rural Urban |
Permanent? |
Yes |
Months Used |
None |
Functioning? |
Yes |
Non Function Reason |
None |
No of Humans |
600 |
No of Camels |
None |
No of Cattle |
None |
No of Shoats |
None |
Irrigation Area |
None |
Source Protected? |
Yes |
Borehole Depth |
180.0 |
Wellcasing Type |
None |
Wellcasing Size |
None |
Borehole SWL |
60.0 |
Borehole Operating Yield |
None |
Borehole Operating Hours |
6.0 |
Borehole Operating Drawn |
None |
Borehole Recovery Time |
None |
Reservoir Type |
None |
Reservoir Capacity |
40.0 |
Pipeline Type |
None |
Pipeline Length |
1800.0 |
HouseHold Connections |
None |
Water Point Kiosks |
None |
Troughs |
None |
Source Emergency? |
None |
No of Trucks |
None |
Truck Capacity |
None |
Pump Type |
None |
Pump Model |
15hp |
Pump Capacity |
None |
Pump Level |
None |
Power Source |
None |
Generator Type |
None |
Generator Capacity |
None |
Solar Type |
None |
Solar Capacity |
None |
Supply Condition |
None |
Supply System Condition Notes |
None |
Physical Water Issues |
None |
Physical Problem Reason |
None |
Temperature |
27.4 |
pH |
7.8 |
Electrical Conductivity |
5760.0 |
Total Dissolved Solids |
2880.0 |
Water Sample Code |
No Document |
Management Type |
Community |
WSC |
None |
WSC Established Date |
None |
WSC Male |
None |
WSC Female |
None |
Humans Charged for Water? |
None |
Cost Of Water for Humans |
0.02 |
Water Charged for Animals? |
None |
Cost Of Water for Animals |
0.01 |
Last Intervention Agency |
GSA - General Service Agency |
Last Intervention Description |
Constructed tank and animal troughs and also provided pump |
Last Intervention Date |
None |
Proposed Intervention Description |
New pump, GI pipes, generator ( full rehabilitation ) |
Additional Notes |
None |
Metadata Tag |
Strategic Water Sources Survey in Galmudug State – WSS_GM |
History |
watersource.HistoricalWaterSource.None |