Code | BHMSJO003 |
---|---|
Water Source Type | Borehole |
Inspecting Agency | FGS_MoEWR |
Inspection Date | Oct. 8, 2019 |
District | Jowhar |
Settlement Name | Jowhar |
Settlement Distance (km) | 0.0 |
Establishing Agency | GTZ - German Agency for Technical Assistance |
Establishing Date | 10-05-82 |
Source Name | Farjanno BH |
Latitude | 2.7763 |
Longitude | 45.4995 |
Sources Cluster | 3 |
Water Source Photo | ![]() |
Users | Urban |
Permanent? | Yes |
Months Used | None |
Functioning? | Yes |
Non Function Reason | None |
No of Humans | None |
No of Camels | None |
No of Cattle | None |
No of Shoats | None |
Irrigation Area (ha) | None |
Source Protected? | None |
Borehole Depth (m) | 110.0 |
Wellcasing Type | PVC |
Wellcasing Size (inches) | 8.0 |
Borehole SWL (m) | 80.0 |
Borehole Operating Yield (m3/hr) | 60.0 |
Borehole Operating Hours (hrs/day) | 24.0 |
Borehole Operating Drawn (m) | None |
Borehole Recovery Time (hr) | None |
Reservoir Type | Concrete/Masonry tank |
Reservoir Capacity (m3) | 225.0 |
Pipeline Type | Galvanised Steel |
Pipeline Length (m) | 400.0 |
HouseHold Connections | 5170 |
Water Point Kiosks | 120 |
Troughs | None |
Source Emergency? | Yes |
No of Trucks | 20 |
Truck Capacity (m3/hr) | 10.0 |
Pump Type | Submersible Pump |
Pump Model | Franklin |
Pump Capacity (m3/hr) | 11.0 |
Pump Level (m) | 90.0 |
Power Source | Generator |
Generator Type | Dos |
Generator Capacity (kVA/kWh) | 23.0 |
Solar Type | None |
Solar Capacity (kVA/kWh) | None |
Supply Condition | Fair |
Supply System Condition Notes | None |
Physical Water Issues | No |
Physical Problem Reason | None |
Temperature (°C) | 29.8 |
pH | 7.5 |
Electrical Conductivity (µS/cm) | 830.0 |
Total Dissolved Solids (mg/l) | 415.0 |
Water Sample Code | No Document |
Management Type | Private-Public-Partnership |
WSC | None |
WSC Established Date | None |
WSC Male | None |
WSC Female | None |
Humans Charged for Water? | Yes |
Cost Of Water for Humans (USD) | 0.01 |
Water Charged for Animals? | Yes |
Cost Of Water for Animals (USD) | None |
Last Intervention Agency | Private |
Last Intervention Description | Generator and pipelines |
Last Intervention Date | 2012-04-09 |
Proposed Intervention Description | Pipelines, pumps, solar system, gates and full rehabilitation. |
Additional Notes | None |
Metadata Tag | Strategic Water Sources Survey – WSS_NAT |
History | History BHMSJO003 |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, AICS, SDC, FCDO and Government of France