Code BHSLBH001
Water Source Type Borehole
Inspecting Agency Somaliland_MoWRD
Inspection Date Oct. 19, 2019
District Buhoodle
Settlement Name Yagoori
Settlement Distance 9.0
Establishing Agency None
Establishing Date 10-01-45
Source Name Siixawle
Geometry None
Latitude 8.6891
Longitude 47.0227
Sources Cluster 0
Water Source Photo
Users Rural
Permanent? Yes
Months Used None
Functioning? Yes
Non Function Reason None
No of Humans None
No of Camels 800
No of Cattle 0
No of Shoats 3000
Irrigation Area 50.0
Source Protected? None
Borehole Depth 65.0
Wellcasing Type GI
Wellcasing Size 12.0
Borehole SWL 31.0
Borehole Operating Yield 16.6
Borehole Operating Hours 3.0
Borehole Operating Drawn None
Borehole Recovery Time None
Reservoir Type Steel tank
Reservoir Capacity 4.0
Pipeline Type Galvanised Steel
Pipeline Length 100.0
HouseHold Connections 0
Water Point Kiosks 1
Troughs 4
Source Emergency? Yes
No of Trucks 6
Truck Capacity 4.0
Pump Type Submersible Pump
Pump Model Grundfos
Pump Capacity 25.0
Pump Level 65.0
Power Source Hybrid - Solar/Generator
Generator Type Perkins
Generator Capacity 45.0
Solar Type 320w
Solar Capacity 45.0
Supply Condition Good
Supply System Condition Notes None
Physical Water Issues No
Physical Problem Reason None
Temperature 29.0
pH 8.03
Electrical Conductivity 1640.0
Total Dissolved Solids 1160.0
Water Sample Code No Document
Management Type Communal
WSC None
WSC Established Date 12-06-18
WSC Male 6
WSC Female 5
Humans Charged for Water? No
Cost Of Water for Humans None
Water Charged for Animals? No
Cost Of Water for Animals None
Last Intervention Agency Oxfam Novib
Last Intervention Description Construction of elevated water tank
Last Intervention Date Dec. 12, 2018
Proposed Intervention Description It needs construction masonry tank Construction of New animal troughs
Additional Notes None
Metadata Tag Strategic Water Sources Survey – WSS_NAT
History watersource.HistoricalWaterSource.None