Code | BHSLLA007 |
---|---|
Water Source Type | Borehole |
Inspecting Agency | Puntland_PSAWEN |
Inspection Date | Jan. 16, 2014 |
District | Laas Caanood |
Settlement Name | Tukaraq |
Settlement Distance (km) | None |
Establishing Agency | Chinese Government |
Establishing Date | 01-10-76 |
Source Name | Tukaraq BH1 |
Latitude | 8.5446 |
Longitude | 47.7936 |
Sources Cluster | None |
Water Source Photo | |
Users | Rural Urban |
Permanent? | Yes |
Months Used | None |
Functioning? | No |
Non Function Reason | None |
No of Humans | 1200 |
No of Camels | 600 |
No of Cattle | None |
No of Shoats | 2000 |
Irrigation Area (ha) | 1.0 |
Source Protected? | None |
Borehole Depth (m) | 50.0 |
Wellcasing Type | None |
Wellcasing Size (inches) | None |
Borehole SWL (m) | 7.0 |
Borehole Operating Yield (m3/hr) | 20.0 |
Borehole Operating Hours (hrs/day) | 6.0 |
Borehole Operating Drawn (m) | None |
Borehole Recovery Time (hr) | None |
Reservoir Type | Concrete/Masonry tank |
Reservoir Capacity (m3) | 6.0 |
Pipeline Type | Galvanised Steel |
Pipeline Length (m) | 500.0 |
HouseHold Connections | 0 |
Water Point Kiosks | 7 |
Troughs | 4 |
Source Emergency? | Yes |
No of Trucks | 7 |
Truck Capacity (m3/hr) | 8.0 |
Pump Type | Submersible Pump |
Pump Model | Grundfos |
Pump Capacity (m3/hr) | 7.5 |
Pump Level (m) | 24.0 |
Power Source | Generator |
Generator Type | Lister petter |
Generator Capacity (kVA/kWh) | 30.0 |
Solar Type | None |
Solar Capacity (kVA/kWh) | None |
Supply Condition | Good |
Supply System Condition Notes | None |
Physical Water Issues | No |
Physical Problem Reason | None |
Temperature (°C) | 29.0 |
pH | 7.65 |
Electrical Conductivity (µS/cm) | 2500.0 |
Total Dissolved Solids (mg/l) | 1780.0 |
Water Sample Code | No Document |
Management Type | Communal |
WSC | None |
WSC Established Date | 20-04-11 |
WSC Male | 6 |
WSC Female | 2 |
Humans Charged for Water? | No |
Cost Of Water for Humans (USD) | None |
Water Charged for Animals? | No |
Cost Of Water for Animals (USD) | None |
Last Intervention Agency | None |
Last Intervention Description | No intervention |
Last Intervention Date | None |
Proposed Intervention Description | -It needs Construction of new elevated water tank. -it needs Construction of new animal troughs. -It needs a new pump with 7.5kw/h |
Additional Notes | None |
Metadata Tag | Strategic Boreholes Survey – BHS |
History | History BHSLLA007 |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France