Code | BHTGBH010 |
---|---|
Water Source Type | Borehole |
Inspecting Agency | Somaliland_MoWRD |
Inspection Date | Sept. 29, 2019 |
District | Buhoodle |
Settlement Name | Ceegaag |
Settlement Distance (km) | 3.0 |
Establishing Agency | Diaspora |
Establishing Date | 29-09-17 |
Source Name | Ceegaag BH2 |
Latitude | 8.6179 |
Longitude | 46.5024 |
Sources Cluster | 1 |
Water Source Photo | |
Users | Rural Urban |
Permanent? | Yes |
Months Used | None |
Functioning? | Yes |
Non Function Reason | None |
No of Humans | None |
No of Camels | 1500 |
No of Cattle | 500 |
No of Shoats | 5000 |
Irrigation Area (ha) | None |
Source Protected? | None |
Borehole Depth (m) | 350.0 |
Wellcasing Type | PVC |
Wellcasing Size (inches) | 8.0 |
Borehole SWL (m) | 210.0 |
Borehole Operating Yield (m3/hr) | 14.0 |
Borehole Operating Hours (hrs/day) | 24.0 |
Borehole Operating Drawn (m) | 15.0 |
Borehole Recovery Time (hr) | 0.2 |
Reservoir Type | Concrete/Masonry tank |
Reservoir Capacity (m3) | 25.0 |
Pipeline Type | PVC |
Pipeline Length (m) | 6.0 |
HouseHold Connections | 600 |
Water Point Kiosks | 0 |
Troughs | 0 |
Source Emergency? | No |
No of Trucks | None |
Truck Capacity (m3/hr) | None |
Pump Type | Submersible Pump |
Pump Model | Grundfos |
Pump Capacity (m3/hr) | 14.0 |
Pump Level (m) | 280.0 |
Power Source | Hybrid - Solar/Generator |
Generator Type | Iveco Germany |
Generator Capacity (kVA/kWh) | 45.0 |
Solar Type | Australia |
Solar Capacity (kVA/kWh) | 240.0 |
Supply Condition | Fair |
Supply System Condition Notes | It's fair |
Physical Water Issues | No |
Physical Problem Reason | None |
Temperature (°C) | 30.6 |
pH | 6.98 |
Electrical Conductivity (µS/cm) | 568.0 |
Total Dissolved Solids (mg/l) | 2840.0 |
Water Sample Code | No Document |
Management Type | Utility/Local Authority |
WSC | None |
WSC Established Date | None |
WSC Male | None |
WSC Female | None |
Humans Charged for Water? | No |
Cost Of Water for Humans (USD) | None |
Water Charged for Animals? | No |
Cost Of Water for Animals (USD) | None |
Last Intervention Agency | None |
Last Intervention Description | Pump and the pipe line |
Last Intervention Date | 2017-09-29 |
Proposed Intervention Description | Generator, more traghs, supply extension, room and also training, hygiene and sanitation |
Additional Notes | None |
Metadata Tag | Strategic Water Sources Survey – WSS_NAT |
History | History BHTGBH010 |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France