Code BKMDHO012
Water Source Type Berkad
Inspecting Agency FGS_MoEWR
Inspection Date Sept. 19, 2019
District Hobyo
Settlement Name Barak Ise
Settlement Distance (km) 0.02
Establishing Agency Community
Establishing Date 02/13/2010
Source Name Barak Isse Berkad
Latitude 5.5574
Longitude 47.6486
Sources Cluster 15
Water Source Photo
Users None
Permanent? no
Months Used 4
Functioning? Yes
Non Function Reason None
No of Humans None
No of Camels 300
No of Cattle 50
No of Shoats 1000
Irrigation Area (ha) 0.0
Source Protected? None
Berkad depth (m) 10.0
Berkad length (m) 20.0
Berkad width (m) 15.0
Reservoir Type Concrete/Masonry tank
Reservoir Capacity (m3) None
Pipeline Type None
Pipeline Length (m) None
HouseHold Connections 3000
Water Point Kiosks 0
Troughs 0
Source Emergency? no
No of Trucks None
Truck Capacity (m3/hr) None
Pump Type None
Pump Model None
Pump Capacity (m3/hr) None
Pump Level (m) None
Power Source No Pump
Generator Type None
Generator Capacity (kVA/kWh) None
Solar Type None
Solar Capacity (kVA/kWh) None
Supply Condition None
Supply System Condition Notes No supply techniques
Physical Water Issues no
Physical Problem Reason None
Temperature (°C) 31.8
pH 7.05
Electrical Conductivity (µS/cm) 4135.0
Total Dissolved Solids (mg/l) 1310.0
Water Sample Code No Document
Management Type None
WSC yes
WSC Established Date 1/22/2011
WSC Male 7
WSC Female 2
Humans Charged for Water? no
Cost Of Water for Humans (USD) None
Water Charged for Animals? no
Cost Of Water for Animals (USD) None
Last Intervention Agency Community
Last Intervention Description Cleaning
Last Intervention Date 2019-03-10
Proposed Intervention Description New borehole and full rehabilitation to these Berkads
Additional Notes None
Metadata Tag Strategic Water Sources Survey – WSS_NAT
History History BKMDHO012

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors