Code DMBKXU018
Water Source Type Dam
Inspecting Agency FGS_MoEWR
Inspection Date Sept. 22, 2019
District Xudur
Settlement Name Moragabey
Settlement Distance (km) None
Establishing Agency Xudur inhibitants
Establishing Date 12/16/1961
Source Name War Adey
Latitude 4.1273
Longitude 43.8778
Sources Cluster None
Water Source Photo
Users None
Permanent? No
Months Used 5
Functioning? No
Non Function Reason Over population resulted over use of this source. Rain bellow average also the soil absorption.
No of Humans None
No of Camels None
No of Cattle None
No of Shoats None
Irrigation Area (ha) None
Source Protected? None
Dam depth (m) 3.0
Dam length (m) 105.0
Dam width (m) 90.0
Reservoir Type Concrete/Masonry tank
Reservoir Capacity (m3) None
Pipeline Type PVC
Pipeline Length (m) 120.0
HouseHold Connections None
Water Point Kiosks 1
Troughs None
Source Emergency? None
No of Trucks None
Truck Capacity (m3/hr) None
Pump Type None
Pump Model None
Pump Capacity (m3/hr) 10.0
Pump Level (m) None
Power Source Surface mounted Pump
Generator Type None
Generator Capacity (kVA/kWh) None
Solar Type 16 panel
Solar Capacity (kVA/kWh) None
Supply Condition None
Supply System Condition Notes None
Physical Water Issues no
Physical Problem Reason None
Temperature (°C) None
pH None
Electrical Conductivity (µS/cm) None
Total Dissolved Solids (mg/l) None
Water Sample Code No Document
Management Type None
WSC Yes
WSC Established Date 6/23/2018
WSC Male 9
WSC Female 4
Humans Charged for Water? Yes
Cost Of Water for Humans (USD) 0.04
Water Charged for Animals? None
Cost Of Water for Animals (USD) None
Last Intervention Agency None
Last Intervention Description None
Last Intervention Date 2017-04-11
Proposed Intervention Description Deep extection,
Additional Notes None
Metadata Tag Strategic Water Sources Survey – WSS_NAT
History History DMBKXU018

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors