| Code | SPBRIS003 |
|---|---|
| Water Source Type | Spring |
| Inspecting Agency | Puntland_PWDA |
| Inspection Date | Nov. 14, 2019 |
| District | Iskushuban |
| Settlement Name | Iskushuban |
| Settlement Distance (km) | None |
| Establishing Agency | Government of Somalia |
| Establishing Date | 11-01-78 |
| Source Name | Iskushuban |
| Latitude | 10.2824 |
| Longitude | 50.2341 |
| Sources Cluster | 0 |
| Water Source Photo | ![]() |
| Users | None |
| Permanent? | yes |
| Months Used | None |
| Functioning? | Yes |
| Non Function Reason | None |
| No of Humans | None |
| No of Camels | None |
| No of Cattle | None |
| No of Shoats | None |
| Irrigation Area (ha) | None |
| Source Protected? | None |
| Spring Cumulative discharge rate | 0.1 (m3/hr) |
| Reservoir Type | Concrete/Masonry tank |
| Reservoir Capacity (m3) | None |
| Pipeline Type | Galvanised Steel |
| Pipeline Length (m) | 5000.0 |
| HouseHold Connections | 1666 |
| Water Point Kiosks | 6 |
| Troughs | None |
| Source Emergency? | yes |
| No of Trucks | 16 |
| Truck Capacity (m3/hr) | 9.0 |
| Pump Type | None |
| Pump Model | Lowara5.5 |
| Pump Capacity (m3/hr) | 8.0 |
| Pump Level (m) | None |
| Power Source | Submersible Pump |
| Generator Type | Perkins 60 |
| Generator Capacity (kVA/kWh) | 60.0 |
| Solar Type | 250w |
| Solar Capacity (kVA/kWh) | 10.0 |
| Supply Condition | None |
| Supply System Condition Notes | Good conditon |
| Physical Water Issues | no |
| Physical Problem Reason | None |
| Temperature (°C) | 30.0 |
| pH | None |
| Electrical Conductivity (µS/cm) | 1840.0 |
| Total Dissolved Solids (mg/l) | 1232.0 |
| Water Sample Code | No Document |
| Management Type | None |
| WSC | yes |
| WSC Established Date | 07-10-17 |
| WSC Male | 5 |
| WSC Female | 2 |
| Humans Charged for Water? | yes |
| Cost Of Water for Humans (USD) | 0.1 |
| Water Charged for Animals? | no |
| Cost Of Water for Animals (USD) | None |
| Last Intervention Agency | CARE Somalia |
| Last Intervention Description | Built a tank with 50 meter cubic, pipe 3000m GI Class B 2 inch. |
| Last Intervention Date | 2018-05-09 |
| Proposed Intervention Description | Pipeline 4000m, repairing kiosks, rehabilitation room taker, fencing |
| Additional Notes | None |
| Metadata Tag | Strategic Water Sources Survey – WSS_NAT |
| History | History SPBRIS003 |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, The World Bank, FCDO, AICS, SDC, Canada, Sweden and GCF
;