Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
8417 | — | Dug Well | FGS Ministry of Energy and Water Resources | March 16, 2022 | Hiraan | beled_weyne | Tawakal Nuuriyow IDPs | 3.0 | HAPO CHILD | 15/11/2011 | NURIYOW IDPS | — | 4.7217764 | 45.202243 | 157.0 | — | 2 | — | urban | no | 7 | No | Lack of pumping | 2695 | — | — | — | — | — | — | — | — | — | — | — | — | — | 25.0 | 0.0 | 5.0 | 2.0 | 1.0 | 1.0 | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 12.0 | Stainless Steel | 250.0 | 385 | 2 | 0 | no | — | — | Surface mounted Pump | None | 0.0 | — | Solar | — | — | — | 180.0 | fair | Failure to produce water | no | — | — | — | — | — | — | Utility/Local Authority | — | — | — | — | no | — | no | — | — | — | CESVI | 14-Jan-20 | Two water kiosks, rehabilitation dug well, rehabilitation water tanker and solar pump system | Dug well, and everything will be able | — | — |
8404 | — | Dug Well | FGS Ministry of Energy and Water Resources | March 16, 2022 | Hiraan | beled_weyne | Raage ugaas IDPS | 5.0 | Community | 11/10/2013 | IDPS water | — | 4.7229425 | 45.2020114 | 149.0 | — | 5 | — | urban | no | 5 | No | Lack of generator | 5500 | — | — | — | — | — | — | — | — | — | — | — | — | — | 8.0 | 3.0 | 4.0 | 0.0 | 2.0 | 1.0 | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 12.0 | PVC | 0.0 | 785 | 1 | 0 | no | — | — | Hand Pump | Don't know | 5.0 | — | — | — | — | — | — | fair | Lack of water and technical problems of generator | no | — | — | — | — | — | — | Utility/Local Authority | — | — | — | — | no | — | no | — | — | — | Agency not specified | — | None intervention | Rehabilitation water tanker and solar system and dug well | — | — |
7545 | — | Borehole | FGS Ministry of Energy and Water Resources | March 16, 2022 | Middle Shabelle | balcad | Warsalaama | 1.0 | ZamZam Foundation | 10/09/2015 | Macalim Xassan | — | 2.1740353 | 45.3538656 | 89.0 | — | — | — | rural | yes | — | Yes | — | 2870 | 100 | 70 | 150 | — | — | 138.0 | gi | 8.0 | — | — | 6.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 30.0 | Stainless Steel | 80.0 | 400 | 1 | 3 | no | — | — | Submersible Pump | Franklin electric 15kw | — | 118.0 | Generator | Duos | 30.0 | — | — | fair | It's in a good condition | no | — | — | — | — | — | — | Private/Individual | — | — | — | — | yes | 0.05 | no | — | — | — | Zamzam | 12-Apr-18 | Rehabilitation and supply of Generator | Construction of elevated water tank and full rehabilitation | — | — |
7567 | — | Borehole | FGS Ministry of Energy and Water Resources | March 16, 2022 | Middle Shabelle | balcad | Buur Cad | 1.0 | Private | 16/02/2013 | Buur Cad | — | 2.2123016 | 45.3545081 | 120.0 | — | — | — | rural | no | 7 | No | One year ago, become dry. | 1287 | — | — | — | — | — | 90.0 | gi | 8.0 | — | — | 4.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 35.0 | Galvanised Steel | 80.0 | 110 | 1 | — | no | — | — | Submersible Pump | Lowara 7.5kw | — | 76.0 | Generator | Gangfa125 | — | — | — | poor | It's in a normal condition | no | — | — | — | — | — | — | Private/Individual | — | — | — | — | yes | 0.05 | no | — | — | — | Private | 13-Nov-15 | Deepening and Decementation | Elevated water tank and full rehabilitation | — | — |
8395 | — | Dug Well | FGS Ministry of Energy and Water Resources | March 16, 2022 | Hiraan | beled_weyne | If iyo Akhiro IDPS | 3.5 | WARDI | 09/09/2016 | IDPS water supply | — | 4.7233105 | 45.2015726 | 146.0 | — | 3 | — | urban | no | 4 | No | Lack of water | 4500 | — | — | — | — | — | — | — | — | — | — | — | — | — | 13.0 | 1.0 | 5.0 | 12.0 | 2.0 | 2.0 | — | — | — | — | — | — | — | — | — | — | — | Other | 0.0 | PVC | 20.0 | 642 | 0 | 0 | no | — | — | Hand Pump | Hand model | 12.0 | — | — | — | — | — | — | fair | Lack of water | no | — | — | — | — | — | — | Utility/Local Authority | — | — | — | — | no | — | no | — | — | — | — | — | 0 | Dug well and rehabilitation | — | — |
7548 | — | Dug Well | FGS Ministry of Energy and Water Resources | March 16, 2022 | Middle Shabelle | balcad | Garas Bintow | 2.8 | Private | 10/04/2007 | Farjano | — | 2.2169254 | 45.397737 | 132.0 | — | — | — | rural | yes | — | No | 9 months ago, because of it collapsed about 20m from ground level. | 1865 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 6.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | Galvanised Steel | 80.0 | 110 | — | — | no | — | — | Submersible Pump | Lowara 5.5kw | — | 109.0 | Generator | Duos | 30.0 | — | — | poor | It's in a bad condition | no | — | — | — | — | — | — | Private/Individual | — | — | — | — | yes | 0.05 | no | — | — | — | — | — | No intervention | Deepening and full rehabilitation | — | — |
7525 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 16, 2022 | Nugaal | burtinle | Burtinle | 1.5 | UNICEF | 16/03/2020 | Hanad BH 3 | — | 7.646383 | 47.8075501 | 483.0 | — | 3 | — | urban | yes | — | Yes | — | 22000 | — | — | — | — | — | 408.0 | pvc | 8.0 | 244.0 | 12.0 | 18.0 | 69.0 | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 375.0 | PVC | 2500.0 | 3500 | 0 | 0 | yes | 8 | 8.0 | Submersible Pump | Lowara | 22.0 | 360.0 | Hybrid - Solar/Generator | Parkins | 65.0 | BYD400MIK-36 | 43.2 | good | — | yes | Colorless and odorless | 36.2 | 7.32 | 2380.0 | 1205.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | no | — | — | — | — | 27/03/2021 | 1. Installation of solar power | 1. Fencing around borehole | — | — |
7432 | — | Spring | Puntland Ministry of Energy Minerals and Water | March 16, 2022 | Bari | iskushuban | Foocaar | 7.0 | UNICEF | 21/09/2005 | Lodhuda spring | — | 10.3309356 | 50.8652081 | 10.0 | — | 4 | — | urban rural | yes | — | Yes | — | 1500 | 200 | — | 1000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 0.5 | — | — | — | — | Concrete/Masonry tank | 10.0 | Galvanised Steel | — | — | — | — | no | — | — | — | — | — | — | — | — | — | — | — | poor | The yield is low. No submersible pump, solar power installation and generator. | no | — | 29.6 | 7.6 | 1740.0 | 875.0 | — | Communal | no | — | — | — | yes | 0.1 | no | — | — | — | Puntland MoEMW | 24/10/2019 | Replacement of distribution pipe lines. | 1: To asset a way of increasing the yield of water, or provide another way of water sources. 2: Distribution pipe line and its accessories such as valves, tee, elbow, couple. 3: Construction of a dug well or distribution of water from another spring which is far from the village to 10 kilometer, due to water demand 5: Construction of elevated water tank and kiosks. | — | — |
7559 | — | Dug Well | FGS Ministry of Energy and Water Resources | March 16, 2022 | Middle Shabelle | balcad | Daangaaley | 1.0 | Private | 12/05/2012 | Shoobaaye | — | 2.2114974 | 45.312031 | 112.0 | — | — | — | rural | yes | — | Yes | — | 3080 | 200 | 300 | 0 | — | — | — | — | — | — | — | — | — | — | 90.0 | 81.0 | — | 18.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 25.0 | Galvanised Steel | 65.0 | 220 | 1 | 2 | no | — | — | Submersible Pump | 7.5kw | — | 88.0 | Generator | Gangfa115 | — | — | — | fair | It's in a a good condition | no | — | — | — | — | — | — | Private/Individual | — | — | — | — | yes | 0.05 | no | — | — | — | Private | 7-Feb-22 | Rehabilitation of Elevated water tank, Decementation and new gangfa115 generator | New generator, submersible pump, rehabilitation of animal troughs, water kiosk, construction of elevated water tank, ring concrete, supply of solar system and GI pipes. | — | — |
7526 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 16, 2022 | Nugaal | burtinle | Burtinle | 0.8 | MAWASU | 16/03/2015 | Hanad 1 | — | 7.6383332 | 47.8092241 | 476.0 | — | 3 | — | urban | yes | — | Yes | — | 22400 | — | — | — | — | — | 430.0 | pvc | 8.0 | — | 15.0 | 20.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 350.0 | PVC | 3000.0 | 3200 | — | — | yes | 10 | 8.0 | Submersible Pump | Lowara | 26.5 | 322.0 | Hybrid - Solar/Generator | Parkins | 100.0 | GPS-300-360 | 37.8 | fair | — | yes | Colorless and odorless | 33.8 | 7.51 | 2050.0 | 1373.5 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | no | — | — | — | KAALO Relief and Development | 16/01/2020 | 1. Installation of solar power. | 1. Construction of new elevated tank 2. Rehabilitation of pump and riser pipes 3. Construction of animal troughts. 4. Rehabilitation of generator | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, AICS, USAID, SDC, FCDO and Government of France