Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
8661 Borehole Somaliland MoWRD May 11, 2022 Togdheer burco 1.0 Dahabshil 01/12/2011 Ceelka Dahabshiil 9.4951290031895 45.5719488859177 1005.0 0 urban no 2 Abandoned This Borehole is abondoned and not in use for more than 4 years its Water is Brakish and not suitable for human consumption. 0 150.0 pvc 8.0 0.0 0.0 poor no New Borehole is needed
7440 Borehole Somaliland MoWRD May 11, 2022 Togdheer burco Kabadheere 0.5 Former Somali government Kabadheere 1 9.47279579937458 45.4414812102914 1051.0 1 rural yes Yes 10000 3000 0 5000 120.0 166.0 pvc 8.0 136.0 12.0 4.0 Concrete/Masonry tank 24.0 Galvanised Steel 100.0 1000 2 5 yes 20 8.0 Submersible Pump Grundfos 18.0 123.0 Hybrid - Solar/Generator Perkins 45.0 Lorentz 15.0 good Good Condition no 27.0 7.8 1000.0 500.0 Utility/Local Authority yes 0.1 no Provision of fence
7442 Borehole Somaliland MoWRD May 11, 2022 Togdheer burco Kabadheere 0.3 Former Somali government 23/11/1983 Kabadheere Borehole 1 9.47277421597391 45.4413872491568 1022.0 1 rural yes Yes 1000 4000 0 5000 120.0 180.0 pvc 8.0 145.0 14.0 5.0 Concrete/Masonry tank 40.0 Galvanised Steel 150.0 2000 4 5 yes 10 8.0 Submersible Pump Grundfos 15.0 145.0 Hybrid - Solar/Generator Perkins 55.0 Lorentz 15.0 good Good Condition no 27.0 7.8 700.0 900.0 Utility/Local Authority yes 0.1 no ISRA 06/12/2017 Rehabilitation of kabadheere Borehole Construction of fence Rehabilitation of animal throughs Rehabilitation of Kiosks
7939 Borehole Somaliland MoWRD May 10, 2022 Togdheer burco Kabadheere area 3.0 This is privately owned Borehole and was established by Ismail Xariir 29/07/2021 Ismail xariir Borehole 3 9.51787828467786 45.4279742762446 1057.0 3 rural yes Yes 100 0 0 180.0 180.0 pvc 8.0 165.0 25.0 15.0 no Submersible Pump Grundfos 15.0 165.0 Hybrid - Solar/Generator Perkins 45.0 LorentzP00305 30.0 good Good Condition no 30.0 7.9 2300.0 560.0 Private/Individual no no New generator Solar rehabilitation
8733 Borehole Somaliland MoWRD May 10, 2022 Awdal borama Shaylamaha 3.0 African relief committe 10/04/2020 Shaaba 18 9.9094093 43.2016421 1479.0 urban yes Abandoned Depleted 120.0 pvc 8.0 No Pump no Private-Public-Partnership no no
7835 Borehole Somaliland MoWRD May 10, 2022 Awdal borama Holhol 5.0 Hdjd 09/04/2020 Cumar Ileeye BH 9.9192199 43.1333663 1469.0 rural yes Yes 30.0 100.0 pvc 8.0 70.0 8.0 Steel tank 10.0 PVC 800.0 0 0 no Submersible Pump Granfoc 10.0 95.0 Solar Axitec 6.8 fair There is no connection no 29.0 7.1 3600.0 2500.0 Private/Individual no no
8114 Borehole Somaliland MoWRD May 10, 2022 Togdheer burco Kabadheere Area 3.0 This is privately owned Borehole and was established by Chief caqil Ali Ibrahim (Naafto) 09/02/2014 Ceelka Cali Naafto 9.50154254212976 45.4492610413581 1053.0 1 rural yes Yes 10 0 0 0 120.0 165.0 pvc 8.0 145.0 25.0 8.0 Concrete/Masonry tank 150.0 0 0 0 yes 5 8.0 Submersible Pump Laware 25.0 135.0 Hybrid - Solar/Generator Perkins 55.0 Lorentz 15.0 good Good Condition no 32.0 7.6 1150.0 800.0 Private/Individual no no New pump Rehabilitation of solar system Rising pipes change Construction and rehabilitation of animal throughs.
7934 Borehole Somaliland MoWRD May 10, 2022 Togdheer burco Wisil area 1.0 United Arab Emirates 07/01/2017 Ceelka Imaaraadka 9.53983585350215 45.4672710690647 1062.0 1 rural yes Yes 1000 0 0 0 0.0 90.0 pvc 8.0 85.0 25.0 4.0 Concrete/Masonry tank 45.0 PVC 100.0 0 0 0 no Submersible Pump Grundfos 24.0 75.0 Hybrid - Solar/Generator Perkins 45.0 Lorentz A004 15.0 good Good Condition no 30.0 8.1 2300.0 1000.0 Private/Individual no no
8086 Borehole Somaliland MoWRD May 10, 2022 Awdal borama Borame 2.0 Osman faarax Bh 2 08/03/2018 Osman faarah Bh 2 9.9049536 43.1612186 1547.0 urban yes Yes 120.0 pvc 8.0 80.0 20.0 Concrete/Masonry tank 75.0 PVC 300.0 0 0 yes 10 9.0 Submersible Pump 92.0 Hybrid - Solar/Generator Perkin 45.0 Axitec 14.5 fair This supply is just Used for irrigation no 28.0 7.2 1260.0 899.0 Private/Individual yes no
7434 Borehole Somaliland MoWRD May 10, 2022 Togdheer burco Area Mohamed Ali 0.2 Buroa Water Agency 30/11/2019 Ceelka 8aad 9.54050845932215 45.5171830393374 1039.0 3 rural urban yes Yes 5000 0 0 0 0.0 174.0 pvc 8.0 110.0 17.0 8.0 yes 8 8.0 Submersible Pump Laware 25.0 150.0 Generator Perkins 45.0 good Good Condition no 30.0 7.5 1600.0 1000.0 Utility/Local Authority yes 0.1 no This Borehole requires solar installation and construction of Masonry elevated water tank.

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, AICS, USAID, SDC, FCDO and Government of France

Donors